Click to add title Elygrid Project ( Grant Agreement nº 278824 ) Pablo Marcuello Foundation for the Development of New Hydrogen Technologies in Aragon.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Information Dissemination.
Advertisements

Country monitoring of International Development Goals - the case of Tanzania Presentation at the PARIS21 Workshop for East Africa and the Great Horn, 23.
Project presentation With the support of the Erasmus Mundus Programme of the European Union.
CIRAS PROJECT OVERVIEW
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS PROJECT OVERVIEW.
Cyprus Project Management Society
Main Principles of the 3 rd SOLAR-ERA.NET Joint Call
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Italian Ministry for the Environment, Land and Sea National Workshop: Developing Environmental Infrastructure Projects in the Waste Sector in Serbia Case.
Elygrid Project Diego Embid Foundation for the Development of New Hydrogen Technologies in Aragon (Spain)
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Co-funded by the European Union "This project has been funded with support from the European Commission. This publication reflects the views only of the.
Presentation by Wendy Launder General Manager CRC and Small Business Programs.
EUROPEAN COMMISSION DG Employment and Social Affairs National Employment and Social Inclusion Monitoring and ESF Operations II European Social Fund Regulation.
LOUGHBOROUGHCOLLEGE Business Support Self Assessment
Welcome Juanma Ormazabal (entrepreneur) from Aceros Ormazabal company (steel)
Post 2013 European Funding. EU Cohesion Policy Investment strategy aligned to deliver the Europe 2020 objectives of smart,
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Kick off meeting 1 Innovation Energie Développement CAP REDEO February 07 CAP REDEO GIS TOOL FOR RURAL ELECTRIFICATION PLANNING VIENTIANE APRIL 2007.
15 th Meeting of the Regional Coordinating Mechanism of PANCAP; Montego Bay, Jamaica 9 th - 10 th of September, 2010 To provide creative and dynamic services.
Content related issues with JTI Report on Recent HyRAMP Activities and Accomplishments Davide Damosso 1 st HyRaMP General Assembly Brussels, October 15,
Overview of the USDA Biotechnology Risk Assessment Grants Program Deb Hamernik, PhD National Program Leader, Animal Physiology US Department of Agriculture.
ERAMED & PROMEDAccess Projects. ERAMED project ERAMED project “ Strengthening the European Research Area in the Mediterranean Countries” “ Strengthening.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
European Standards on Confidentiality and Privacy in Healthcare Dr Colin M Harper Division of Psychiatry & Neuroscience Queen’s University.
1 International negotiations on post 2012 regime: general framework and the key questions Ruta Bubniene, Programme officer Reporting, Data and Analysis.
European Commission Joint Evaluation Unit common to EuropeAid, Relex and Development Methodology for Evaluation of Budget support operations at Country.
APEC 2011: Food Safety Activities Julia Doherty Office of the U.S. Trade Representative January 27, 2011.
Living Lakes Marion Hammerl Lake Constance Foundation and Global Nature Fund Sustainable Tourism Networking in Europe.
Why a co-ordination action about Enhanced Geothermal Systems ? P. Ledru & A. Genter Engine Launching Conference February 2006 Orléans, France Opening.
Education and Culture International credit mobility with partner Countries Ayna Chorekliyeva Coordinator of National Erasmus+ Office in Turkmenistan Information.
Hazardous Materials Emergency Preparedness Grant Multi – Year Award Process Matthew R. Jones Sr. Grants Management Specialist Grants and Registration Branch.
Common Implementation Strategy for the Water Framework Directive Planning of a Workshop CLIMATE CHANGE IMPACTS ON THE WATER CYCLE, RESOURCES AND QUALITY.
Dat e: in 12 pts Erasmus+ Генствами Education and Culture International credit Mobility National Erasmus+ Office in Kyrgyzstan 28 November 2014.
INTEGRATED STRATEGIC PLANNING PROCESS (ISPP) 10 year planning outlook10 year planning outlook Monia Lahaie, DCFO and Director General Finance at Statistics.
1 European Union - European Commission Delegation to China and Mongolia EU-China Biodiversity Programme (ECBP) Cooperation & Development Section.
HQVET High Quality of Vocational Education and Training - European best methods for improving VET system Meetings, Tasks and Responsibilities This project.
SGS-3, Washington – May 08 1 Regulations, Codes and Standards (RCS) – What can IPHE contribute? Marc Steen Co-Chair RCSWG Institute for Energy, Joint Research.
Project Manager – MCESD Project Partner - MEUSAC “ Closer to Europe ” Operational Programme 2 Cohesion Policy Empowering People for More Jobs.
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Ministry of Finance National Strategic Reference Framework Communication Strategy 20 June 2008 Second NSRF Monitoring Committee Zornitsa Arsenieva Advisor.
Performance Accountability Review Risk-Based Management Kathryn Hornsby Technical College System of Georgia NACTEI May 14, 2009.
ELYGRID Renewable energy balancing : The ElyGrid Project SHFCA 6th Annual Conference Smarter Energy with Hydrogen & Fuel Cells Fernando Palacín Foundation.
ELYGRID Improvements to Integrate High Pressure Alkaline Electrolyzers for Electricity/H2 production from Renewable Energies to Balance the GRID CONGRESO.
This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the.
The MERIKA Project has received funding from the European Union Seventh Framework Programme (FP7/ ) under grant agreement n° merikafp7.eu.
Towards competitive European Batteries L.M. Rodriguez-Martinez, I. Villarreal, M. Swierczynski, P. Rodriguez, A. Warnecke, M. Gosso, E. Marckx, G. Jutz,
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
WP7 - Dissemination of Results & Exploitation
Project Don Quichote Linking wind power with innovative electrolyser
RENOVAGAS Project: Power to Methane
Institutional Strengthening Support
Presentation by Shreenithi Lakshmi Narasimhan
Guidelines and Template for project oral presentation
Guidelines and Template for project oral presentation
Spanish Presidency: Priorities in the field of Cohesion Policy
PRD 2018 GUIDELINES & TEMPLATE
SSG on Climate Change and Water SCG meeting May 2008 Marieke van Nood, Unit D.2, DG Environment, European Commission.
Research & Innovation Action Overview of the Project
MEthane activation via integrated MEmbrane REactors
PRD 2018 GUIDELINES & TEMPLATE
CETaqua, Water Technology Centre
The Atlantic Forum Process and outcomes European Commission – DG MARE
Dear students After Greetings, The Student Services Department / Student Welfare Fund Office wishes you permanent accommodation. We would like to inform.
Item 9.6 Mainstreaming geo-statistics
PRD 2019 GUIDELINES & TEMPLATE
Technology, costs and projections
Presentation transcript:

Click to add title Elygrid Project ( Grant Agreement nº ) Pablo Marcuello Foundation for the Development of New Hydrogen Technologies in Aragon (Spain)

PROJECT OVERVIEW Improvements to Integrate High Pressure Alkaline Electrolysers for Electricity/H2 production from Renewable Energies to Balance the Grid SP1-JTI-FCH Efficient alkaline electrolysers Duration 38 months, from 01/11/2011 to 31/12/2014 Budget: ,33 € / Funding: ,00 € Goal: improve TCO of MW alkaline electrolysers Project in the last two moths

PROJECT TARGETS AND ACHIEVEMENTS

Status before project AIP targetProject TargetCurrent status/achiev ementS Expected final achievement SoA (2011) -> 1,6 T/d 2015 target: Unit capacity (Ton/d) = 1,5 Double current density -> double unit capacity 3 Ton/d with current density tested under Elygrid project 100 SoA (2011) -> 70% stack efficiency 2015 target: Efficiency = 68% 10% increase stack efficiency 70% with previous technology 66% with new technology at double current density 90 SoA (2011) -> > target: Cost (M€/(T/d)) = % cost reduction Assessment of the last BOP improvements 100 MAIP objectives:

PROJECT TARGETS AND ACHIEVEMENTS Status before project AIP targetProject TargetCurrent status/achiev ementS Expected final achievement 0.18 A/cm A/cm 2 with 80% HHV 0. 5 A/cm A/cm 2 Stable operation 25 year lifespan10 year lifespan Depend on the membrane 75 SoA (2011) -> > 3000 €/Nm3 3000€/Nm 3 for a complete system 25% cost reduction Assessment of the last BOP improvements 100 SoA (2011) -> 33 bar Operating pressure >150 bar Not applicable to this project Hydrogen pressure is considered high enough 100 AIP objectives:

PROJECT TARGETS AND ACHIEVEMENTS

RISKS AND MITIGATION Objective target: Efficiency = 68% and 0.75 A/cm 2 with 80% HHV Bottlenecks and risks: unspecified in MAIP (not related to A/cm2) Better defined in the topic (0,75 A/cm 2 ) The project agreed an increase of the stack efficiency of 10% related to the previous technology (achieved with the new technology) and a current density of 0, 5 A/cm 2. The project has already tested the unit at 0,4 A/cm 2 and it is possible to test at 0,5 but it is not considered as a priority. Revision of targets: No Objective target: 10 year lifespan Bottlenecks and risks: It will depend of the lifespan of the membrane. All the other components have higher lifespan but it is difficult to assure that a material developed under the project can have 10 year lifespan. Revision of targets: No

RISKS AND MITIGATION Objective target : Operating pressure >150 bar Bottlenecks and risks: This target was mentioned in the topic but not in the project targets. In any case, as electrolysis study remarks, an output pressure of 33 bar is considered a good level of operation. Revision of targets: No Objective target: Retention of >90% of initial efficiency over at least 1000 on/off switching cycles Bottlenecks and risks: The testing of new technology at constant operation has been longer than initially expected and it is possible that more tests with new materials at constant operation are needed. For the project, it is priority to find the best material before testing at discontinuous operation. Revision of targets: Yes Suggested nature of revision: It is priority to find the best material before testing at on/off cycles.

SYNERGIES WITH OTHER PROJECTS AND INITIATIVES EMPA obtained a Swiss internal project granted by BFE which is a public funding institution (Bundesamt/federal office of Energy). FHA has co-funded with another national project called DESPHEGA which is also related to alkaline electrolysers. The project was granted in the framework of INNPACTO call (Department of Economics and Competitiveness, Spain) Contacts done with RESelyser project (FCH-JU) and final event for sharing public results, expectations and possible further collaboration

HORIZONTAL ACTIVITIES Training and education – Different post-doc and PhD students are working in the project in different WPs: membrane development, power electronics and balance of plant optimization Safety, Regulations, codes and standards – The project has developed a document with the main regulations, codes and standards which must be taken into consideration in order to design an electrolyser. This document will be public. Public awareness – The project has a website where all general information, news and public papers and presentations can be downloadedwww.elygrid.com

DISSEMINATION ACTIVITIES Conference presentations – Elygrid Project presents in the: IPHE Workshop Seville, November th EUROPEAN PEFC & H2 FORUM, July International Conference on Hydrogen Safety 2013, September Review days ( ). 8TH International Symposium Hydrogen & Energy, February EUROPEAN HYDROGEN ENERGY CONFERENCE 2014, March WHEC 2014 (two oral presentations&one poster). Iberconnapice, October Workshops organized by the project – The project attended the workshop called “Water electrolysis day” organized by the FCH-JU – Final event at the end of the project with RESelyser project Publications – LCA papers: previous analysis and final results – Paper from modeling results and BOP optimization

EXPLOITATION PLAN/EXPECTED IMPACT “go-to-market” Target: validation of improved technology with a several MW electrolyser unit size at competitive price

EXPLOITATION PLAN/EXPECTED IMPACT