RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.

Slides:



Advertisements
Similar presentations
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
NNN05, 8/4/05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the Beta-beam Study Group
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Nufact 2008The Beta Beam WP1 Beta beam R&D status Elena Wildner, CERN on behalf of the Beta Beam Study Group EURISOL/Euronu.
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
NuFact'06, Aug. 2006A. Fabich, CERNRadioactive Ion Beams, 1 Radioactive Ion Beams A. Fabich, CERN on behalf of the Beta-beam Study Group
1 Further Demands on beam Intense, Intense, Intense, ….Intense, Intense, Intense, …. –Very far detector, extremely small cross section, search small osci.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
I. Strasik et al. ● Halo Collimation of Proton and Ion Beams in FAIR Synchrotron SIS 100 ● CERN Halo Collimation of Proton and Ion Beams in.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
CERN, 18 th Feb. 2004EURISOL - Beta Beam Design StudyM. Benedikt 1 Status of the Beta-Beam in the EURISOL Design Study Michael Benedikt, AB Division, CERN.
NUFACT August 2014 E. Wildner, CERN 13/03/14Nufact14, Glasgow, E. Wildner 2 Accumulator Ring for the ESS Neutrino Super Beam.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
NUFACT05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the EURISOL Beta-beam task
M. LindroosNUFACT06 School A low energy accumulation ring for the beta-beam Ansgar Simonson, Anders Kaellberg, Mats Lindroos.
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
GDR Neutrino, Annecy 2007 Beta-beam team1 Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN on behalf of the Beta-beam Study Group
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
Halo Collimation of Protons and Heavy Ions in SIS-100.
Status of the magnet studies in the ARCS (FLUKA)
Collimation Concept for Beam Halo Losses in SIS 100
A.Lachaize CNRS/IN2P3 IPN Orsay
The beta-beam Mats Lindroos CERN GSI, 17 January 2005 Mats Lindroos.
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN
b-beams: R&D Challenges in FP7
Status of the beta-beam study
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Accelerator R&D for Future Neutrino Projects
The EURISOL Beta-beam Steven Hancock
Collimation for beta-beams
Progress towards Pulsed Multi-MW CERN Proton Drivers
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Status of the BETA-BEAM Task within the EURISOL Design Study
SLHC-PP kick-off meeting, CERN 9 April 2008
Status of CTC activities for the Damping rings
Joint session – Beta-beams
Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN
Update on MEIC Activities at ANL
JLEIC 200 GeV ion beam formation options
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
SC Magnets with Small Apertures for JLEIC*
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 2 Outline The beta-beam Progress on a conceptual design EURISOL beta-beam facility Challenges for the beta-beam Conclusions

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 3 The EURISOL beta-beam facility!

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 4 Beta-beam R&D The EURISOL Project Design of an ISOL type (nuclear physics) facility. Performance three orders of magnitude above existing facilities. A first feasibility / conceptual design study was done within FP5. Strong synergies with the low-energy part of the beta-beam: Ion production (proton driver, high power targets). Beam preparation (cleaning, ionization, bunching). First stage acceleration (post accelerator ~100 MeV/u). Radiation protection and safety issues. Subtasks within beta-beam task ST 1: Design of the low-energy ring(s). ST 2: Ion acceleration in PS/SPS and required upgrades of the existing machines including new designs to eventually replace PS/SPS. ST 3: Design of the high-energy decay ring. Around 38 (13 from EU) man-years for beta-beam R&D over next 4 years (only within beta-beam task, not including linked tasks).

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 5 Design study objectives Establish the limits of the first study based on existing CERN accelerators (PS and SPS) Freeze target values for annual rate at the EURISOL beta-beam facility Close cooperation with neutrino physics community Freeze a baseline for the EURISOL beta-beam facility Produce a Conceptual Design Report (CDR) for the EURISOL beta-beam facility Produce a first cost estimate for the facility

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 6 Challenges for the study Production Charge state distribution after ECR source The self-imposed requirement to re-use a maximum of existing infrastructure Cycling time, aperture limitations etc. The small duty factor The activation from decay losses The high intensity ion bunches in the accelerator chain and decay ring

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 7 Intensity distribution during acceleration 30% of first 6 He bunch injected are reaching decay ring Overall only 50% ( 6 He) and 80% ( 18 Ne) reach decay ring Normalization Single bunch intensity to maximum/bunch Total intensity to total number accumulated in RCS Bunch 20 th 15 th 10 th 5th 1st total

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 8 Power losses - comparison Nucleon losses compared PS and SPS comparable for CNGS and bb operation PS exposed to highest power losses P loss /l [ions]Beta-beam CNGS 6 He 18 Ne RCS PS SPS Power loss per unit circumference of a machine

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 9 Dynamic vacuum Decay losses cause degradation of the vacuum due to desorption from the vacuum chamber The current baseline includes the PS, which does not have an optimized lattice for unstable ion transport and has no collimation system The dynamic vacuum degrades to Pa in steady state ( 6 He) An optimized lattice with collimation system improves the situation by two orders of magnitude P. Spiller et al., GSI

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 10 Merging Achieving >90% merging efficiency of injected particles Some ions are already collimated before having been stacked for 15 (20) merging cycles Ions stored /ions injected t [s] Ions stored /ions injected t [s] 6He 18Ne S. Hancock, CERN

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 11 Injected/merged collimated decayed Decay ring - Momentum collimation After 15 (20) merges 50% (70%) of the injected 6He (18Ne) ions are pushed outside the acceptance limits. Momentum collimation required. Dispersion region; multi stage collimation system Space required: placed in “unused” straight section Collimation power corresponds to 150 kW average to MW peak level during the bunch compression process compression process lasts a few hundred milliseconds A. Chance et al., Saclay He6Ne18LHC p+LHC Pb  T/ion (GeV) τ repetition (s)63.610h Number of stored ions Stored beam energy (MJ) x 3622 x 3.81

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 12 aperture [cm] Power loss [W/m] Decay ring - Decay losses Decay products originating 1) from straight section 2) in arcs 1) are extracted at the first dipole in the arc, sent to dump 2) Arc lattice optimized for absorption of decay products To accommodate either ion species, the half-aperture has to be very large (~ 8cm for the SC dipoles). Absorbers take major part of decay losses ion arcs. About 60 W each SC dipoles still have to stand <10 W/m. A. Chance et al., Saclay

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 13 Production Major challenge for 18 Ne Workshop at LLN for production, ionization and bunching this summer New production method proposed by C. Rubbia!

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 14 Production ring with ionization cooling (C. Rubbia, A.Ferrari, Y.Kadi and V. Vlachoudis)

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 15 Ionization cooling

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 16 Using existing PS and SPS, version 2 Space charge limitations at the “right flux” Space charge tune shift Note that for LHC the corresponding values are and Transverse emittance normalized to PS acceptance at injection for an annual rate of (anti-) neutrinos

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 17 The slow cycling time. What can we do? Production PS SPS Decay ring Ramp time PS Time (s)0 8 Wasted time? Ramp time SPS Reset time SPS

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 18 Accumulation at 400 MeV/u T 1/2 =1.67 s T 1/2 =17 s T 1/2 =0.67 s

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 19 Stacking Multiturn injection with electron cooling

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, Dy Partly stripped ions: The loss due to stripping smaller than 5% per minute in the decay ring Possible to produce Dy atoms/second (1+) with 50 microAmps proton beam with existing technology (TRIUMF) An annual rate of decays along one straight section seems as a realistic target value for a design study Beyond EURISOL DS: Who will do the design? Is 150 Dy the best isotope?

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 21 Long half life – high intensities At a rate of neutrinos using the EURISOL beta-beam facility:

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 22 Gamma and decay-ring size, 6 He GammaRigidity [Tm] Ring length T=5 T f=0.36 Dipole Field rho=300 m Length=6885m Civil engineering Magnet R&D New SPS

RAL 27 April 2006 The beta-beam task, EURISOL Beta-beam requirements, 23 In 2008 we should know The EURISOL design study will with the very limited resources available give us: A feasibility study of the CERN-Frejus baseline A first idea of the total cost An idea of how we can go beyond the baseline Resources and time required for R&D Focus of the R&D effort Production, Magnets etc.