1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Role of Senior Management
EMS Checklist (ISO model)
Course Material Overview of Process Safety Compliance with Standards
Elective module 3 Geospatial environmental management
Environmental Management Systems Refresher
[Organisation’s Title] Environmental Management System
Department of Environmental Quality Environmental Management System Overview.
ISO EMS Policy Statement N.C. Division of Pollution Prevention and Environmental Assistance.
Environmental Management System (EMS)
Contractor Management and ISO 14001:2004
Environmental Management Systems An Overview With Practical Applications.
Fermilab Environmental Management System (EMS)
Safety and Health Programs
Environmental Management Systems Refresher
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
ENVIRONMENTAL MANAGEMENT SYSTEMS MARINE OPERATIONS CENTER – PACIFIC INTRODUCTION TO OUR SYSTEM JIM SCHELL, ENVIRONMENTAL COMPLIANCE OFFICER.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
FPSC Safety, LLC ISO AUDIT.
Safety and Health Programs
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
SAFETY AND HEALTH PROGRAMS 1. This presentation is adapted from the OSHA Safety and Health Programs presentation available on the OSHA website. CREDITS.
EMS / NEPA Integration at the Idaho National Laboratory Bruce Angle & John Irving Battelle Energy Alliance Idaho National Laboratory Environmental Management.
DOE-HSS Review of LBNL Science Divisions 10/23/08.
Implementation of DOE Order 450.1: Self-Declaration and Report Letters Steven R. Woodbury US Department of Energy March 9, 2005.
GWS SMS INTRODUCTION MSM Manual. 3. MISSION STATEMENT AND CORE VALUES OF THE COMPANY  MISSION  Our Mission is to provide expertise in the fields of.
An Overview of Environmental Management Systems (EMS)
Ship Recycling Facility Management System IMO Guideline A.962
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Engaging Contractors in the Environmental Management System (EMS) Department of Energy EMS Workshop: Implementation, Lessons Learned, and Best Practices.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
Company duties under the ISM Code
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Safety and Health Programs 1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale and productivity.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Hazards Identification and Risk Assessment
Integrating Environmental Management System (EMS) Requirements and Work Controls April 21, 2004 Denny Hjeresen, EMS Team Lead, LANL Gene Turner, NNSA Lead,
Geoffrey L. Beausoleil Assistant Manager, Office of Operational Support DOE Idaho Operations Office September 12, 2006 Presentation to DOE ISM Champions.
Responsible Care® Health & Safety Task Force – 06 H&S.
Understanding the EHS Management System Development Process David Downs President EHS Management Partners,Inc.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Brookhaven Science Associates U.S. Department of Energy Leveraging the Management Review Process of ISO and OHSAS for Facility-level and Institutional-level.
1 IMPLEMENTING DOE ORDER ENVIRONMENTAL MANAGEMENT SYSTEMS U.S. Department of Energy Richland Operations Office.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
OSHA Safety and Health Program Management Guidelines
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
OHSAS Occupational health and safety management system.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Fostering Continuous Improvement, Best Practices and New Strategies at INL John Irving & Bruce Angle Federal Environmental Symposium – West Big Sky, Montana.
Overview of Environmental Management Systems Using ISO John Rupe Forest Service Rocky Mountain Region.
1 Getting to Green at the Department of Energy Progress on OMB’s Environmental Sustainability Scorecard Andy Lawrence Director, Office of Nuclear Safety,

CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Safety Accountabilities
Injury and Illness Prevention Program (IIPP)
Ian Evans SSRL Safety Office
Presentation transcript:

1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006

2 Integration of EMS and ISMS is Required  DOE Order section 4 states:  General Requirements. All DOE elements must ensure that site ISMSs include an EMS that does the following. (1) Provides for the systematic planning, integrated execution, and evaluation of programs for— (a) public health and environmental protection, (b) pollution prevention (P2), and (c) compliance with applicable environmental protection requirements. (2) Includes policies, procedures, and training to identify activities with significant environmental impacts, to manage, control, and mitigate the impacts of these activities, and to assess performance and implement corrective actions where needed. (3) Includes measurable environmental goals, objectives, and targets that are reviewed annually and updated when appropriate.

3 Integration Makes Good Business Sense  Reduces employee confusion; ever heard these questions?  What’s the difference between ISMS, EMS, and VPP?  How do they fit together?  Why do we have all these different systems?  Minimizes implementation costs  One set of processes and procedures  One training activity  One communication effort  Improves site’s ability to successfully navigate DOE-HQ ISMS Review  Failure to obtain HQ approval would be an operational nightmare!

4 Environmental Policy & Commitment Planning Environmental Objectives and Targets (PDD-1012) Activity Level Hazard ID ( PRD-25 ) Hazard Identification Analysis (MCP-3562) Environmental Aspects (LST- 96) Environmental Checklist (451.01) Environmental Instructions for Facilities (PRD-5030 & MCP-3480) Implementation Integrated Safety Management System (PDD-1004) Hazard Identification Analysis (MCP-3562) Integrated Work Controls (STD-101) Management and Operations (PDD-1005) Environmental Permits (MCP-9109) Emergency Mgmt. (PLN-114) Environmental Instructions (MCP-3480) Activity specific work orders, CERCLA O&M plans, TPRs EMS Key Elements Checking & Corrective Action Management Review ICARE, Non Conformance Corrective Actions (MCP-598) Environmental Assessment Program (LST-202 & PLN-2106) Performing Independent Assessments (MCP-552) Environmental Program Metrics (PLN-2106) ES&H Performance Measurement Analysis & Reporting (PDD-126) ESRB (CTR-161) ISMS / EMS Integration of Policies, Procedures Define Work Analyze Hazards Develop Controls ISMS Core Functions Perform Work Provide Feed Back ICP Contract Environmental Policy (POL-104)

5 Background on the Idaho Cleanup Project (ICP)  Idaho National Engineering and Environmental Laboratory (INEEL) was divided into the Idaho National Laboratory (INL) and the ICP on February 1, 2005  INL contract awarded to Battelle Energy Alliance on February 1, 2005  ICP contract awarded to CH2M – WG Idaho (CWI) on May 1, 2005  Functioning ISMS and EMS were in place at the time of contract transition  Necessary to re-validate the ISMS and EMS due to changes in contractors

6 Background on the Idaho Cleanup Project (ICP) (cont.)  Decision by CWI to pursue ISO independent registration of its EMS  EMS updated to reflect CWI mission and organization structure  Achieved registration November 2005  Completed well upfront of ISMS re-validation effort  Enabled us to integrate our EMS into the ISMS  Received positive response on our integration efforts from the DOE-HQ ISMS Phase I Review Team and the ISO Auditor

7 A Fundamentally Different Approach to Reverification  EMS objectives selected from the ICP contract  Contract is all about environmental cleanup  Ensures worker focus is not diluted on multiple priorities  Minimizes the need to re-evaluate the objectives Constant as long as DOE priorities and the contract are unchanged  EMS targets selected from the project schedule  Environmental targets and the contract workscope are one and the same  Updated each fiscal year to reflect upcoming work scope  ISMS is established to enable workers to complete their jobs in a safe and protective manner ICP Contract, ISMS, and EMS all focused on the same result: Cleaning up the INL in a safe and environmentally protective manner.

8 Tactics Chosen to Implement Integration - Training  Developed single training package for ISMS/EMS/VPP as part of preparations for ISMS Phase I review  Required for all ICP employees including subcontractors  Developed by a team that included ISMS, EMS, and VPP personnel  Updated training and provided refresher as part of ISMS Phase II  Again, required for all employees  Focus on Phase II was the workers in the field  Training developed and conducted by workers rather than just the “training department”  Selected those workers that were passionate about ISMS/EMS/VPP Training was well received; Workers more accepting of the message from their peers.

9 Tactics Chosen to Implement Integration - Communications  All communications conducted under the ISMS umbrella  Communications developed by a team including ISMS/EMS/VPP and communications personnel  Weekly focus topics published in the e-newlsetter (ICliPs) and posted on the ISMS website  Emphasized in staff meetings as well  Topics chosen on how they relate to the worker “doing work safely” Five core functions/eight guiding principals of ISMS, workers role in ISMS, fitness for duty, step back/stop work, EMS, VPP, emergency signals, slip/trips/falls, etc.

10 Tactics Chosen to Implement Integration - Tools  Developed the “ICP Safety Toolbox”  Reference guide that includes key safety information: emergency information/contacts, injury reporting, ISMS/EMS/VPP program highlights, and a personalized “my safety information” page  Designed to be carried by employees while on the job

11 The Bottom Line  Consistent message to employees ISMS is the foundation of the house EMS and VPP are two main rooms.  Safety is a prerequisite!  From the top:  Safety  Follow procedures  Effective response to employee concerns If we do these three things project success will follow.