Proposal Note 555 Surface Smoothness for Bridges and Approaches

Slides:



Advertisements
Similar presentations
Mn/DOT Combined Smoothness Specification Operator Certification Training Workshop July 12, 2010.
Advertisements

Ride Specification – IRI Update Prepared by Joe Thomas, P.E. 11/1/06 MAAPT 53 rd Annual Asphalt Conference December 6, 2006.
TRAFFIC MANAGEMENT Tender and Construction Phase
Section Cross Slope District 1 Your logo here.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
IRI Smoothness Testing for Quality Assurance and Warranty Construction Alberta Transportation CUPGA November 15 th, 2009 Moncton, NB.
FAA Eastern Region 34 th Annual Airport Conference March 2, 2011 – Hershey, PA.
LLP HMA Pavements Inertial Profiler Prebid Meeting Solano A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement.
Introduction to Uniform Guidance Presented to Engineering Research Network – Nov 19, 2014 by Sponsored Programs Accounting.
Software Quality Assurance Plan
1 Grant Process Proposal Preparation Proposal Writing Project Implementation Evaluation and Assessment Reporting.
MEPDG Overview & National Perspective CRSI Expert Task Group Meeting July 29, 2008 Gary Crawford Federal Highway Administration Office of Pavement Technology.
Things to look for and remember while preparing FD05 Estimates.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Software Quality Assurance Inspection by Ross Simmerman Software developers follow a method of software quality assurance and try to eliminate bugs prior.
Pavement Ride Quality Nicholas Vitillo, Ph. D. Center for Advanced Infrastructure and Transportation.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
12 Steps to Useful Software Metrics
I. Advantages of Smooth Pavements: Longer Life Public Opinion Save Fuel Less Surface Maintenance II. Ways to Ensure Smooth Pavements Subgrade and Subbase.
Work Zone Safety & Mobility
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Appendices Subpart R Steel Erection
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
System Planning- Preliminary investigation
Performance Specifications T. E. A. M. St. Louis Presentation October 8, 2004.
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Mike Baumann Statewide Utility Engineer January 22, 2015.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
PLANNING FOR DESIGN Shawn Dikes, AICP FHWA / KYTC / ACEC Partnering Conference 2015.
Things to look for and remember while preparing FD05 Estimates.
Virtis-Opis Beta Testing Todd S. Thompson, PE South Dakota DOT Office of Bridge Design August 3, 2011.
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
Addressing Localized Roughness at the Project Level by Gary Higgins.
4/25/2017 9:25 AM Inertial Profiler Forum Intro to the Inertial Profiler Implementation September 28, 2015 © 2015 California Department of Transportation.
MnDOT Pavement Surface Smoothness Specification 23 rd Annual RPUG Meeting September 29, 2011.
Software Engineering Lecture # 1.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
IRI T ESTING IN N ORTH C AROLINA Presented by Christopher Bacchi, PE Vice President, Trimat Materials Testing, Inc. Raleigh, NC.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
1 Restructuring Webinar Dr. Zollie Stevenson, Jr., Ph.D. Director Student Achievement and School Accountability Programs Office of Elementary and Secondary.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
NCDOT – “Final Surface Testing” CAPA / NCDOT Asphalt Training Workshop February 21-22, 2012 Raleigh, NC IRI Standard Specification Article
Software Development. The Software Life Cycle Encompasses all activities from initial analysis until obsolescence Analysis of problem or request Analysis.
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Refer to slide robustdetails robustdetails.
ALDOT Specification Updates
CONCRETE PAVEMENTS.
12 Steps to Useful Software Metrics
Sponsored by the RMS Center
Transitioning to IRI for Pavement Smoothness
Emphasis on Quality Rochester’s City Owner Contract Process
Standards and Certification Training
Longitudinal Joint Construction – Why Straightness Matters
Navigating FDOT Specifications and Standards
Software life cycle models
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Zach Wahl and Tatiana Baquero Project Performance Corporation (PPC)
Prime Factors for Successful Preservation Treatments
Software Testing Lifecycle Practice
SPECIAL EDUCATION DECEMBER COUNT
Overview of The Bidder Response Form and Changes to the IT RFP Template March 8, 2019.
Presentation transcript:

Proposal Note 555 Surface Smoothness for Bridges and Approaches 2015 Conaway Conference Proposal Note 555 Surface Smoothness for Bridges and Approaches Jim Welter, P. E. Construction Structures Engineer , Office of Construction Administration Brian Schleppi, Infrastructure Management Administrator, Office of Technical Services

Proposal Note 555 Surface Smoothness for Bridges & Approaches

Proposal Note 555 Surface Smoothness for Bridges & Approaches Latest versions of applicable Proposal Notes and Supplements PN 420- Surface Smoothness Requirements for Pavements 7/18/2014 PN 470 – Thin Lift Asphalt Surface Smoothness Requirement 7/18/2014 PN 555 – Surface Smoothness for Bridges and Approaches 4/18/2014 (Revision in Section 4. Mandatory Corrective Work “Anytime PN 420 is used in conjunction with PN 555, the localized roughness criteria for the pavement within one foot of the approach slab will be governed by the criteria in PN 420 [IRI in any 25 foot (7.6 m) segment not to exceed 160 inches per mile (3.94 m/km).”) (Will be updated 4/17/2015) Supplement 1058 – Surface Smoothness Equipment and Operator Requirements 4/18/2014 Supplement 1110 – Submittal and Application Requirements for ProVAL Pavement Smoothness Software 4/18/2014 Supplement 1112 - Submittal and Application Requirements for ProVAL Highway Smoothness Software for Bridge Encounters 1/20/2012 (Will be updated 17/2015)

Proposal Note 555 Surface Smoothness for Bridges & Approaches

Proposal Note 555 Surface Smoothness for Bridges & Approaches Important that the Crews/Contractors that are placing the bridge deck concrete, approach slab concrete, and approach pavement,(concrete or asphalt) are on the same page (Proactive, not Reactive)

Proposal Note 555 Surface Smoothness for Bridges & Approaches Once the surface smoothness measurements are collected, the results are to be analyzed by the ProVAL software Top graph is 25’ base length continuous report while bottom graph is the actual inertial profile. The profile caused the roughness to increase.

Proposal Note 555 Surface Smoothness for Bridges & Approaches ProVAL is used to determine compliance with the tolerances in PN 555 Each lane of encounter must be built to an IRI of 130 inches/mile or less If not, then must be corrected to an IRI of 100 inches/mile or less International Roughness Index (IRI) is a composite model of vehicle suspensions IRI is sensitive to roughness wavelengths from about 1 to 2 feet (tire patch) to 300 feet. Beyond 300 feet, the entire vehicle moves with the general grade without suspension movement. IRI model simulates each wheel track across the collected inertial road profile with a simulated travel speed of 50 mph IRI provides a mathematical assessment of the section profile aimed at quantifying the quality of the ride in a passenger car. MRI (Mean IRI) average IRI of both wheel paths in the given lane Overall criteria waived if bridge encounter is less than 265 feet in length Overall roughness criteria has to be waived for shorter bridges as one bump or dip or roughness event counts more and more as the bridge encounter gets shorter.

Proposal Note 555 Surface Smoothness for Bridges & Approaches

Proposal Note 555 Surface Smoothness for Bridges & Approaches Each wheel path must not exceed an IRI of 250 inches/mile on a continuous 25 foot base length If not, then must be corrected to an IRI below 250 inches/mile in 25 feet Limit is increased to 350 inches/mile anywhere the sliding 25 foot base length includes steel armor The 25 foot sliding baselength in effect becomes a roughness “hotspot” locator. The shorter the baselength the more each individual roughness event counts to get back to units of vertical inches of roughness per longitudinal mile. For 25 ft baselength, each roughness event that causes suspension movement gets multiplied a bit over 211 times. For 528 ft, each event only gets multiplied 10 times to get back to inches per mile units.

Proposal Note 555 Surface Smoothness for Bridges & Approaches

Proposal Note 555 Surface Smoothness for Bridges & Approaches Depending on the grinding machine model, the Smoothness Assurance Model in ProVAL is used to develop the Corrective Action Plan Some issues on bridges will require a specific grinder. Some issues may require a long machine, 25 ‘ grinder and some short dips may require a short machine

Proposal Note 555 Surface Smoothness for Bridges & Approaches If corrective action is required, a Corrective Action Plan must be submitted to and approved by the ODOT Project Engineer Re-testing after any corrective action is completed Submit plan 7 days before beginning corrective work. Submit one copy of the following information to the Engineer: (1) corrective work plan; (2) all IRI and MRI analyses; and (3) all collected road profiles in ProVAL compatible format and one copy of the information will be sent to the Office of Technical Services; Attn.: Infrastructure Management Section, 1980 W. Broad St., Columbus, OH 43223.

Proposal Note 555 Surface Smoothness for Bridges & Approaches If possible, correct smoothness prior to establishing longitudinal grooves PN 555 4.0 Mandatory Corrective Work. Feather areas adjacent to ground areas to provide a smooth surface. Re-groove diamond ground surfaces according to 511.17, if the existing grooves are less than 0.08 inches (2 mm) deep, at no additional cost to the Department. Replace pavement markings and raised pavement markers per the application 600 Item after grinding. 511.17 Bridge Deck Grooving. For staged, or phase bridge deck work, saw the grooves parallel to the final, permanent bridge centerline. If the different stages or phases of the bridge deck work occur within one construction season, any stage opened to traffic shall receive an interim coarse broom finish during placement, then saw the longitudinal grooves after the final stage. The interim broom finish will not be allowed as a surface texture when opened to traffic over a winter season. Saw longitudinal grooves in the deck prior to opening to traffic for a winter season.

Proposal Note 555 Surface Smoothness for Bridges & Approaches Responses concerning PN 555 from Districts Percentage of bridge decks with this note that have required grinding- Almost all of the bridge decks with PN 555 have required grinding “most contractors did not realize the note requirements were on the project until later in the game.”

Proposal Note 555 Surface Smoothness for Bridges & Approaches Responses concerning PN 555 from Districts How well have the grinding plans been followed? Most Contractors have followed the grinding plans “The contractor did turn in a grind plan, but it was found to be erroneous as the deck would still not be in compliance after the plan was followed. In order to keep the project schedule, the contractor agreed to do a blanket grind on the entire deck, including the asphalt / approach interfaces. This saved the time of a second grind plan and associated review time.“ “Plans were submitted and reviewed and discussed. Discussion was done several times actually but turned out ok. This being a fairly new note required some explanation and partnering to see it through. The plans were used and followed and all of the decks actually had grinding but turned out riding very nicely.” “There will need to be improvements to the corrective action plans, as I believe in a handful of cases, they are grinding too much. They will get better. “ “---- followed the grinding plan very well and by following the grinding plan were left with only a few minor violations after the plan was executed. “ “ No complaints from either party” “___ seemed to do an excellent job following the Corrective Action Plan as it was submitted.  The two bridges had different issues in their ride quality, but after the grinding, both improved significantly.  The only area where a ‘bump’ didn’t seem permanently removed were the pressure relief joints, but even those were improved. We found great results where asphalt, old or new meets the newly placed concrete pavement/approach.” “The subcontractors I’ve worked with and bridge contractors have been very good about learning the spec and using it. I have been closely reviewing plans and looking at their execution. No horror stories in our District. I think we’re getting a much better product than we used to with old smoothness specs..” “6 bridges were blanket ground, 12 were spot ground.” “ For the most part the grinding plans have been followed, however we had an issue on a project with the grinding sub initially not agreeing or wanting to implement the plan as approved. However, they ended up following the plan. I think it would be good for you to point out to OCA that on this project we were able to run the profiles on the passes that were done by the grinding sub that was not per the action plan, and the roughness got worse. When it was followed the thresholds were met.    A comment that I have in defense of the note, is that I think that initial construction of the bridge decks is getting better in regards to accuracy and workmanship with the asphalt, expansion joints, approach slabs, etc. As you are aware it’s never really been the bridge deck that causes the problem. The bid-well finishing machine is what it is. The issue has always been the various transitions. And I think that the data would support more times than not it’s in the asphalt.” “All required grinding was performed to within tolerances specified in PN555 as closely as possible.  There was an instance where the required grinding would have ground into the top of the metal expansion joint.  This area was ground as much as possible without damaging the expansion joint.” “The Spec. determined amount of grinding required and they followed those measurements to meet the requirements.”

Proposal Note 555 Surface Smoothness for Bridges & Approaches Responses concerning PN 555 from Districts Have the Districts received any feedback from the public concerning projects that have this proposal note? Many Districts have and the response has been positive Comments; “I personally live in the town with the deck that had grinding on it, and have received many compliments on the nice ride.  This blanket grind was a success. On another bridge, I have received some concerns about the ride from ODOT people, but no feedback from the public.” “We did receive some feedback with a very pleased travel public after completion of the project. Some of this could be attributed to the atrocious condition the bridge decks were in prior to the project beginning.” “None received” “ We have received some positive comments about how well they ride.”  “ No feedback from the public that I am aware of.” “Although we have not heard specifically from the traveling public, we believe strongly that it is a positive from a PR standpoint. “ “Sorry, I have not heard of any feedback from the public.  We usually only get feedback when the deck aren’t smooth!”  “Yes we have gotten good public feedback, notably at meetings, with city officials, county engineers, etc, but I think the general public is noticing. The bridges ride awesome after they are ground. “ “We have not received any feedback in form of emails or letters, but have received verbal comments regarding the smoothness of the bridge transitions.” “I’ve had great feedback on the ride of the bridges”  ”No feedback or comments from the public”

Proposal Note 555 Surface Smoothness for Bridges & Approaches The amount of time that it takes to do this at the end of a job and whether or not this is being considered in the establishment of a closure period or the overall completion date? Logistics of sawing grooves, applying pavement markings, opening to traffic. Asphalt pavement? Another subcontractor? Concrete or asphalt on approach slabs? New approach slab details with sleeper slabs and pressure relief joints. Phase construction, open over winter, etc. Making final PN 555 requirements a “Punch List” vs. “Substantial Completion” item Reduce rush on Corrective Action Plan development Ease scheduling of CAP work Brian will address further.

Proposal Note 555 Surface Smoothness for Bridges & Approaches Things we found 2013-2014 7 day review period. Industry wants to profile, grind & re-profile all in the same day Corrective Work Plan does not contain sufficient detail for proper analysis Conflicting grooves when re-grooving is necessary Grinder operator reluctant to follow 3rd party approved plan

Proposal Note 555 Surface Smoothness for Bridges & Approaches Initial Use of PN 555 Greater success when agency, prime and sub contractor(s) work together and are responsible for how their part contributes to the whole Special mention at pre-bid meeting Special mention at pre-con meeting Avoid surprises/reactionary mode toward end of project completion

Proposal Note 555 Surface Smoothness for Bridges & Approaches Using International Roughness Index & ProVAL IRI/ProVAL methods were familiar to paving industry, just different IRI thresholds for the same analysis methods IRI/ProVAL was relatively unknown to the bridge construction community

Proposal Note 555 Surface Smoothness for Bridges & Approaches Using International Roughness Index & ProVAL Difference: Corrective Action for roughness violations Generally straightforward/simple for pavements More complicated/more constraints for bridges Reinforcing Steel Cover in Bridge Deck Longer Wavelength Roughness Content Significant Slope Breaks Skews and generally more road geometry

Proposal Note 555 Surface Smoothness for Bridges & Approaches Using International Roughness Index & ProVAL Get your certified profiler operators and grinding community highly familiar with using ProVAL to develop acceptable Corrective Action Plans (CAP) on the front end of implementing the specification ProVAL’s Smoothness Assurance Module Proper Diamond Grinding Simulation Techniques/procedures to develop CAP Requires practice and OJE – provide coaching/assistance

Proposal Note 555 Surface Smoothness for Bridges & Approaches Using International Roughness Index & ProVAL 2014 new business model: District IRI & ProVAL Specialists 1 or 2 people from each District Construct. Dept. Formed User Group that meets periodically Resource for all construction projects in their District with IRI specs Consistency & Uniformity in District & State Quicker CAP approval Ensure you have an expert(s) to turn to

Proposal Note 555 Surface Smoothness for Bridges & Approaches Using International Roughness Index & ProVAL For the 2015 Construction Season: PN 555 update Supplement 1112 Better data submittal guidance CAP details Examples and templates Statewide Input from District Specialists

Proposal Note 555 Surface Smoothness for Bridges & Approaches Using International Roughness Index & ProVAL

Proposal Note 555 Surface Smoothness for Bridges & Approaches Using International Roughness Index & ProVAL

Proposal Note 555 Surface Smoothness for Bridges & Approaches Diamond Grinding & Corrective Action Plans Can’t grind through steel armor Ensure sufficient reinforcing cover Can’t go too deep on adjacent surface course Ensure the Plan developed is what’s executed in the field! Not following the plan = not meeting IRI criteria

Proposal Note 555 Surface Smoothness Proposal Note 555 Surface Smoothness for Bridges & Approaches Diamond Grinding & Corrective Action Plans Asking a grinder operator to grind to a plan rather than use their experience, seat of the pants, naked eye. Operators are becoming increasingly comfortable with profiler technology and software predictions

Proposal Note 555 Surface Smoothness Proposal Note 555 Surface Smoothness for Bridges & Approaches Diamond Grinding & Corrective Action Plans All grinders can fix many problems however some bridges may require a specific grinder Long features such as camber issues may require a long machine while short deep dips or slope breaks may require short machine

Proposal Note 555 Surface Smoothness Proposal Note 555 Surface Smoothness for Bridges & Approaches Diamond Grinding & Corrective Action Plans Wherever possible, grind before deck grooving Phased projects require grooving if traffic is on bridge through winter We may explore other texturing alternatives in these cases 511.17 will not allow interim coarse broom finish on bridge deck work when opened to traffic over winter If the different stages or phases of the bridge deck work occur within one construction season, any stage opened to traffic shall receive an interim coarse broom finish during placement, then saw the longitudinal grooves after the final stage. The interim broom finish will not be allowed as a surface texture when opened to traffic over a winter season. Saw longitudinal grooves in the deck prior to opening to traffic for a winter season.

Proposal Note 555 Surface Smoothness Proposal Note 555 Surface Smoothness for Bridges & Approaches Diamond Grinding & Corrective Action Plans Don’t correct the deck and approach slabs until surface pavement is in place High/low pavement or dips in entry exit pavement may cause you to grind into approach slab and possibly deck that didn’t have any spec violations on their own Bridge encounters built outside of the bounds of the general profile will not pass inertial profile PN 555 criteria

Proposal Note 555 Surface Smoothness Proposal Note 555 Surface Smoothness for Bridges & Approaches Diamond Grinding & Corrective Action Plans Grinding won’t fix everything! High steel armor False work collapse Significant roughness or issues with entry or exit pavement

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches High Steel Armor

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches False Work Issue

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches Entry & Exit Pavement Anomalies

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches Entry & Exit Pavement Anomalies

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches Entry & Exit Pavement Anomalies

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches Success –Localized Roughness LWP

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches Success –Localized Roughness RWP

Proposal Note 555 Surface Smoothness for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches Success –Overall Mean IRI (MRI)

Proposal Note 555 Surface Smoothness Proposal Note 555 Surface Smoothness for Bridges & Approaches Future Considerations on Specification Changes Alternative texturing to deck grooving for bridges that are opened to traffic during winter period Issues with re-establishing grooves. Matching, etc.

Proposal Note 555 Surface Smoothness. for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches The Big Lessons Learned Develop enough Owner Agency experts/specialists up front (OH DOT IRI & ProVAL Specialist Users Group) Prepare for PN 555 up front and early Coordinate with Agency, Prime, and subs to construct all parts of the bridge encounter in a more seamless fashion ProVAL has proven to be a reliable tool at generating predictable outcomes which are replicated in the field

Proposal Note 555 Surface Smoothness. for Bridges & Approaches Proposal Note 555 Surface Smoothness for Bridges & Approaches The Big Lessons Learned Get your local grinding community comfortable with & understanding ProVAL, Grinding Simulations, and CAPs Follow the (approved) CAP in the field that was developed in the office Try to avoid building features that can’t reasonably be diamond ground

QUESTIONS?