TM MODELS MD & HD OPTIONS 1-800-285-7227. New Features 300-335HP Tier III Cat® C-7 Turbo-Diesel Engine Direct Drive Augers Kar-Tech Radio Controls Genuine.

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

Soil Erosion.
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Timothy Townsend, PhD, PE Associate Professor
Taylor Creek Park Rehabilitation Project. Taylor Creek Park Rehabilitation In July 2012 a significant storm event caused significant damage in Taylor.
Earth and Rockfill Dams
1 Floodplain Management SESSION 7 Stream Systems on Dynamic Earth Floodplain Management Principles & Practice Prepared By Donald R. Reichmuth, PhD.
Bringing Marginal Land Into Production Don Day Extension Associate - Energy.
Sedimentation Lesson five: Reducing Sedimentation.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Earth Disturbance Programs  Chapter 102 –Erosion Control & NPDES Permits  Chapter 105-General Permits  Dirt & Gravel Roads Program.
Env 247 Overview of Stormwater Management March 1, 2011.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
How Many People Can the Earth Support?
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Factors that Influence Erosion
A West Hills backyard landslide before pin piles. The pin pile applications of Pro Landscape, Inc.
Caltrans District 5 Landscape Architecture Department.
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Brozelco Capabilities Power Distribution and Control.
Erosion Control on Construction Sites David Athey, PE Deputy Public Works Director, Engineering City of Atascadero.
1 Class Exercise  Soil Stabilization  Sediment Controls  Verify the contractors calculations for the quantity of material need to stabilize a Disturbed.
PIT MANAGEMENT Why? Technical Standards Branch CEA PRESENTATION Revised Feb14 Bruce Blue.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
February Chagrin Loam Proposed Method of Management French Drain Vertical “Pit” Drains ~2 Feet Wide 10 Feet Deep 120 Feet Long 1 Foot 8 Inches.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
TRENCHLESS TECHNOLOGIES Submitted By:- Kamaldeep Gupta C-3.
Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1.
11-8 Using the Pythagorean Theorem
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
LAND JUDGING. Land Classification The Soil Conservation Service uses a classification system to describe the capability of the soils to produce crops.
x-int: (1,0) y-int: (0,-2)x-int: none y-int: (0,-4)x-int: (-3,0) y-int: (0,9) x-int: (4,0) y-int: (0,2) x-int: (3,0) y-int: (0,-5)x-int: (-7,0) y-int:
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
FRAMING SEMINARS 2012 PRESENTED BY KW ENGINEERING 1.
ROCK KOSHKONONG LAKE DISTRICT Lake Dredging Project.
What is Erosion and Sedimentation ? Bill Laflamme CPESC, Office of the Commissioner MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air,
2015 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting April 23, 2015.
UNIT I RETAINING WALLS.
This house sits on the top of a hill that is covered with loose soil and rocks. The new owners of this house have some concerns about their property. What.
4) Waves the force of waves striking the shoreline break rock into smaller pieces (abrasion). The smaller pieces are then carried away by the waves.
Nonfarm Erosion Control
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Soil Conservation.
Introduction to Land Evaluation Basic Soil Science AFNR-BAS-6: Describe soil formation and management and assess its relevance to plant/animal production.
Erosion and Sediment Control Overview MPCA NPDES Construction Stormwater Permit Engineering Day, 4/16/2012 Br 862, CSAH 16 over East Swan River.
View of well and location from the northern slope. According to a company representative, the location size has not been reduced because the well still.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Retaining Wall Construction Building A Timber Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Management for Agricultural Land Uses Unit 2 Chapter 20 Lesson 4.
Soil Improvement.
Storm Water Drainage Analysis for Harris County (Crosby, TX)
Storm Water Pollution Prevention Plan Development
8.4 Trigonometry- Part II Inverse Trigonometric Ratios *To find the measure of angles if you know the sine, cosine, or tangent of an angle. *Use inverse.
EAG346-Sem II 2014/2015 Lesson 2.
Slope of a Line (6.1).
Success Stories DEPT. OF TRANSPORTATION
Soil Conservation.
Elasticity Examples.
البزل Drainage ا.م.د. حياوي ويوه الجوذري.
Soil Conservation to save soil..
Pavement materials: Soil
Soil Conservation Conservation - to save.
Kastanis- Existing Conditions
Earth and Rock fill Dams
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Presentation transcript:

TM MODELS MD & HD OPTIONS

New Features HP Tier III Cat® C-7 Turbo-Diesel Engine Direct Drive Augers Kar-Tech Radio Controls Genuine Parker Parts Program for Hydraulic Hoses & Fittings Backed by a 2-Year Limited Warranty

Testing…. 3/4-inch Round Rock

Testing…. Soil blown through combination hose and hard pipe

Testing…. 100 Feet Vertical

Applications….Instead of slash burning, coarse grind waste wood and apply on slopes

Applications….Highway Projects 1500 ton of No. 57 stone blown in with hose & hard pipe Blown in vertically 12’, down another 15’, and horizontally 160’.

Applications….Erosion Control EcoBlanket® 13 acre slope stabilization

Applications….Erosion Control EcoBerm® Often replaces silt fence

Applications….Erosion Control EcoBlanket® New Home Construction

Applications….Erosion Control EcoBerm®Injected with Seed for Permanent Sediment Control

Applications….Erosion Control Test Plot for Oregon Dept. of Transportation EcoBlanket®Injected with Seed EcoBerm® at top & bottom of slope

Applications….Athletic Fields Baseball Field “After” picture is 2 weeks after Terraseeding™

Applications….Athletic Fields Football Field “After” picture is 2 weeks after topdressing injected with seed

Applications Into Rooftop PlantersCovering Drainage Pipe

Erosion Control Highways EcoBerm® Mine Reclamation Athletic Fields Terraseeding™ Rooftop Terraces Long Range Pneumatic Backfill High Volume EcoBlanket® Remote Access

EXPAND YOUR POSSIBILITIES Express Blower™ and Terraseeding™ are trademarks and the Express Blower™ design logo is a registered trademark of Express Blower, Inc. EcoBerm® and EcoBlanket® are registered trademarks of Rexius, Inc. Special thanks to Ground Tech, Inc. and Eco Pro, Inc. for use of project pictures