4.2 Student Book © 2004 Propane Education & Research Council Preparing and Installing Vapor Distribution System Components 4.2.

Slides:



Advertisements
Similar presentations
Compressed Gases Slide Show Notes
Advertisements

East Carolina University Compressed Gas Safety Training Program
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
29 CFR 1910 Subpart H Hazardous Materials Presenter Roberto Dickinson OSHA Training Institute Instructor.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
2.5 Student Book © 2004 Propane Education & Research Council 2.5 Operating a Truck, Tank Trailer or Tractor/Trailer to Deliver or Relocate ASME Tanks.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Designing and Installing Exterior Vapor Distribution Systems INTRODUCTION Course Overview and Objectives.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
2.3.6 Student Book © 2004 Propane Education & Research CouncilPage Performing a Walk-Around Inspection of the Transport After Loading Performing.
Transporting ASME, DOT Portable, and Intermodal (IM) Tanks
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
3.6 Student Book © 2004 Propane Education & Research Council 3.6 Performing Railcar Product Transfers.
4.1 Student Book © 2004 Propane Education & Research Council Layout, Design and Selection of a Vapor Distribution System 4.1.
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
MODULE 8 Cylinder Safety.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
2.3 Student Book © 2004 Propane Education & Research Council 2.3 Operating a Transport To Deliver Propane.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
BOBTAIL DELIVERY OPERATIONS Bobtail Delivery Operations 1.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Preparing Foundations for Cylinders & ASME Tanks
Placing Vapor Distribution Systems and Appliances into Operation MODULE 1 Course Introduction.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
MODULE 6 Vehicle Parking, Servicing, and Security.
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
4.2.3 Student Book © 2004 Propane Education & Research CouncilPage Transporting Materials of Trade To transport hazardous material as a material.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
Installing DOT/ICC Exchange or Stationary Cylinders
Learning Objective 3 Define the ratings in a portable fire extinguisher rating system.
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
East Carolina University Compressed Gas Safety Training Program
SAFE WORK INSTRUCTIONS
Presentation transcript:

4.2 Student Book © 2004 Propane Education & Research Council Preparing and Installing Vapor Distribution System Components 4.2

Consult local jurisdictions for applicable codes, standard and legal requirements This material is not an exhaustive treatment of the subject and does not preclude other procedures to enhance safe LP-gas operations This publication is not intended nor should it be construed to 1.Set forth procedures which are the general custom or practice in the propane industry 2.Establish the legal standards of care owed by propane distributors to their customers 3.Prevent the reader from using different methods to implement applicable codes, standards or legal require- ments. CETP Program Disclaimer

This training material was designed to be used as a resource only and does not replace federal, state, local, or company safety rules. The user of this material is solely responsible for the method of implementation. The Propane Education and Research Council, the National Propane Gas Association and Industrial Training Services, Inc. assume no liability for reliance on the contents of this training material. Issuance of this material is not intended to nor should it be construed as an undertaking to perform services on be- half of any party either for their protection or for the protection of third parties. CETP Program Disclaimer

4.2 Student Book © 2004 Propane Education & Research Council Learning Aids—These margin notes are provided to help you identify sources, take precautions, or give guidance on your job. Symbols Warning: Important precaution that you should always remember when performing the identified task. Tools: This task requires special tools or procedures. PPE: This is a task that requires personal protection equipment. Paper Work or Forms: This task should be documented on your company’s forms for compliance or legal reasons. Safety Procedure: For your safety special precautions and safety guidelines apply to this task or operation of equipment. Company S.O.P. : Follow your company’s Standard Operating Practices (or Procedures). If you’re not sure of your company’s policy, check with your supervisor.

Electrical Hazard: This task involves an electrical hazard. Lockout and Tagout procedures must be followed. Explosive/Fire Hazard: This task involves a fire or explosion hazard. Use appropriate precautions. Lockout and Tagout procedures may apply. Technical Tips: This technique may be very useful as you do a task. Technical Tip The National Fire Protection Association: References to sections of the LP-Gas Codes and Standards. NFPA 54 Or NFPA 58 U.S. Department of Transportation: DOT has regulatory authority, both interstate and intrastate, over the transportation of hazardous materials. References to Title 49, Code of Federal Regulations. Department of Labor: (OSHA) administers federal employee safety and health regulations. 4.2 Student Book © 2004 Propane Education & Research Council

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 1 When propane cylinders are received at the bulk plant, they must be inspected to determine their fitness for service, requalification, re-filling, storage for future transportation, or for condemnation and scrapping. In this module you will learn to identify: (1)Regulations pertaining to processing cylinders that have been in service (2)Processes for receiving and examining cylinders at the bulk plant (3)procedures for processing new cylinders received at the bulk plant (4)procedures for preparing and loading propane cylinders on the delivery vehicle Preparing DOT/ICC Cylinders for Transportation and Installation 4.2.1

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 1 Regulations for Cylinders That Have Been in Service No person may fill a cylinder overdue for periodic requalification with a hazardous material and then offer it for transportation. Before each filling of a cylinder, the person filling the cylinder must visually inspect the outside of the cylinder. A cylinder that has a crack or leak, is bulged, has a defective valve or a leaking or defective pressure relief device, or bears evidence of physical abuse, fire or heat damage, or detrimental rusting or corrosion, may not be filled and offered for transportation.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 1 Regulations for Cylinders That Have Been in Service NFPA 58, LP-Gas Code, requires that cylinders must be filled, continued in service, and transported in compliance with DOT regulations. Further, any cylinder that is due for requalification must not be refilled until it is requalified using requalification methods prescribed by DOT A cylinder with an expired requalification date shall not be refilled until it is requalified by the methods prescribed in DOT regulations. NFPA NFPA

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 2 Processes for Receiving and Examining Cylinders When cylinders are received at the bulk plant, whether they are new cylinders or ones that have been in service and picked up for refilling, they must be properly processed for storage or future transportation to customer sites After or during unloading at the bulk plant each cylinder should be inspected to determine fitness for continued service. The first item to check is its due date for requalification.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 2 Processes for Receiving and Examining Cylinders Checking Requalification Due Date Figure 2. DOT Cylinder Requalification Periods Letter After Year Stamp Requalification Method Next Requalification Due (years) NoneVolumetric Expansion Test12 SProof Pressure Test7 E External Visual Inspection (CGA Inspection Method) 5

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 2 Processes for Receiving and Examining Cylinders Checking Requalification Due Date A DOT cylinder marked 10 01E is due for requalification before or during October The cylinder may require requalification before its due date if it is damaged or subjected to physical abuse, excessive corrosion or heat. Cylinders that have been exposed to fire must be immediately removed from service. Steel cylinders should be designated as “REJECTED”. Only cylinder manufacturers or DOT approved repair facilities may requalify steel cylinders, while aluminum cylinders must be condemned and scrapped.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 2 Processes for Receiving and Examining Cylinders Checking Requalification Due Date Figure 3. Cylinder Requalification Stamp

4.2.1 Student Book © 2004 Propane Education & Research Council Processes for Receiving and Examining Cylinders Checking Requalification Due Date DOT Approved Cylinder Requalification Stamps V E V10001 V E Valid for 5 years from the date Valid for 5, 7 or 12 years from the date, depending on the meaning of “ x ” Valid for 5 years from the date

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 3 Processes for Receiving and Examining Cylinders Determining Fitness for Continued Service Cylinder valve protection should always be in place. Exchange cylinders that require a valve cap for protection should have caps secured in place at all times except when the cylinder is on scales during filling, or when the cap is removed for valve inspection or cylinder evacuation. The valve cap should only be removed when the cylinder is on a level surface or secured to a cylinder inverter or other stable structure.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 3 Processes for Receiving and Examining Cylinders Determining Fitness for Continued Service Figure 4. Cylinder Valve Protection Devices

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 3 Processes for Receiving and Examining Cylinders Determining Fitness for Continued Service Cylinder Inspection Tag If valve or fitting replacement is indicated, the cylinder should be marked for proper disposition using a tag or suitable marker, then moved to an area designated for cylinders requiring valve replacement. If requalification is required, this condition should be marked as well and the cylinder moved to a designated area for that purpose.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 4 Processes for Receiving and Examining Cylinders Determining Fitness for Continued Service Figure 5. Processing Cylinders At a Bulk Plant

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 4 Processes for Receiving and Examining Cylinders Safety Considerations for Storing and Processing Cylinders Figure 5 illustrates considerations for cylinder handling, storage, and processing. Directing Relief Valves Away From Adjacent Cylinders

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 4 Processes for Receiving and Examining Cylinders Safety Considerations for Storing and Processing Cylinders 1.Cylinders should be arranged so that any cylinder can be accessed in the event of a service valve or other leak. 2.Proper valve protection should be maintained at all times. 3.Consideration should be given to cylinder movement through the various handling processes from unloading through loading. 4.Efforts should be made to position cylinders so that cylinder relief valve discharges are not directed at the service valves of adjacent cylinders.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 5 Processes for Receiving and Examining Cylinders Checking for Proper Cylinder Labeling Figure 6. DOT Shipping Label Combination DOT Shipping Label, NFPA 704 Style “OSHA Label” & Customer Information Label

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 5 Processes for Receiving and Examining Cylinders Checking for Proper Cylinder Labeling A consumer information label must be applied to all portable refillable LP-gas cylinders of 100 lb. LP-gas capacity or less not filled on-site. The label shall include information on the potential hazards of LP- gas. NFPA 58

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 5 Processing New Cylinders New DOT cylinders should be inspected to be sure that they are not damaged and are approved for propane.  DOT and NFPA 58 required markings  Proper Valve Protection (neck ring or cap)  Proper Foot Ring Attachment  Motor Fuel Cylinders  Stationary Cylinders

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 6 Processing New Cylinders Purging New Cylinders Before liquid propane is introduced into new cylinders it is necessary to purge them of air. Some cylinder manufacturers pre-purge new cylinders before they are shipped, by removing air using a vacuum pump. To determine if a cylinder has been vacuum purged, a POL test gauge block fitted with a negative/positive pressure gauge and plugged outlet should be used. Figure 7. Pre-Purging Pressure Test Block

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 7 Processing New Cylinders Purging New Cylinders If a new cylinder is not pre-purged by the manufacturer, or has been open to the atmosphere, it must be properly purged of air, and then charged with propane vapor before it is filled with liquid propane. Figure 9. New Cylinder Air Purging Pump

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 7 Processing New Cylinders Purging New Cylinders Note: Follow manufacturer’s operating instructions. WARNING: Purge pumps must be used only on new cylinders which have NEVER contained any flammable substance.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 8 Processing New Cylinders Purging New Cylinders Figure 10. Purging with Propane Vapor

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 8 Processing New Cylinders Purging New Cylinders By alternately opening valves 1 and 2 five times, charging the cylinder with propane vapor to 15 psig, each time allowing the gas/air mixture to vent until the cylinder pressure reaches atmospheric pressure, the cylinder will be purged of air and ready for liquid filling. A final vapor charge of 15 psig should be retained in the cylinder before introducing liquid propane.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 8 Preparing & Loading Propane Cylinders on the Delivery Vehicle When delivering propane cylinders to residential or industrial customers, the driver is responsible for the delivery vehicle and for transporting cylinders safely and efficiently. This involves the use of various kinds of equipment designed to lift the cylinders onto and off of the delivery vehicle and to secure them while being transported.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 9 Preparing & Loading Propane Cylinders on the Delivery Vehicle Protection of Cylinder Valves and Fittings – The transportation of cylinders must incorporate protection against physical damage to the cylinder valves and fittings while in transit. A cylinder must have its valves protected by one of the following methods Securely attached metal caps The valve is recessed into the cylinder or otherwise protected [valve collars] According to NFPA 58, cylinders of 45-pound propane capacity or less must have a plug, cap, or an approved quick closing coupling in place on or in the service valve when the cylinder is not connected for use.

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 10 Loading and Securing the Cylinder Cargo – Cylinders shall be fastened securely in a position to minimize the possibility of movement, tipping, or physical damage related to each other or to the supporting structure, while in transit. Cylinders containing Class 2 (gases) materials must be securely restrained in an upright position, loaded in racks… and securely attached to the motor vehicle to prevent the cylinders from being shifted, overturned or ejected from the vehicle under normal transportation conditions. A cylinder containing a Class 2 material may be loaded in a horizontal position when the cylinder is designed so that the inlet… to the… pressure relief device is located in the vapor space of the cylinder. Preparing & Loading Propane Cylinders on the Delivery Vehicle

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 10 Preparing & Loading Propane Cylinders on the Delivery Vehicle Loading and Securing the Cylinder Cargo Figure 10. Cylinders Secured Vertically Figure 11. Secured Horizontally with Relief Valves at Top (Vapor Space)

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 10 Shipping Papers If permanent shipping papers are used, the date and number of cylinders loaded at the beginning of the delivery route must be recorded on the permanent shipping paper (typically with a wax pencil marker).

4.2.1 Student Book © 2004 Propane Education & Research CouncilPage 11 Shipping Papers Front Side Reverse Side Figure 3. Shipping Paper for Cylinder Delivery Vehicles

4.2.1 Student Book © 2004 Propane Education & Research Council Time to See If You Got the Key Points of This Module… Complete the Review on pages 12 & 13. See if you are ready for the Certification Exam by checking off the performance criteria on pages 14 & 15.