Tailings Dam Failures, ARD, and Reclamation Activities

Slides:



Advertisements
Similar presentations
Weathering …continued.
Advertisements

Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
Timothy Townsend, PhD, PE Associate Professor
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
LEACHATE MANAGEMENT AND TREATMENT
TRP Chapter Chapter 6.3 Biological treatment.
Biological waste water treatment
Waste Water Treatment (Sewage Treatment)
Environment Engineering I
Part III Solid Waste Engineering
Acid Mine Drainage. Terms Acid Mine Drainage (AMD) –Water that is polluted from contact with mining activity Acid Rock Drainage (ARD) –Natural rock drainage.
Acid Mine Drainage Excercise H-ESD : Environmental and Sustainable Development Michael Staudt, GTK.
Summitville Gold Mine Disaster
By: Audella Eid Advisor: Dr. R. Zurayk Constructed Wetlands for Wastewater treatment.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
Section 1: Water Resources
Phytotechnologies for Environmental Restoration and Management Micah Beard, M.S. Shaw Environmental, Inc.
Wetlands for Acid Mine and Livestock Drainage Treatment By: Gabe Jenkins April 18 th 2005.
Acid Mine Drainage. Mining & the Environment Mine overburden & waste soils (mine tailings) are waste products generated by the mining industry. When these.
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
Introduction to ACID ROCK DRAINAGE Oxidation of sulphides exposed to water and oxygen in waste rock piles or mine workings Oxidation of pyrite by oxygen.
Acid Mine Drainage: From Formation to Remediation CE Aquatic Chemistry Julie Giardina Dominike Merle.
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
Monday, 10/12/2007, SERBIA Prevention of Contamination from Mining & Metallurgical Industries in Serbia Strategic Plan for Prevention of Contamination.
An Introduction to Acid Mine Drainage by George Mitchell and Tim Craddock.
Acid Lakes from Lignite Mines Dan Henderson. Lignite  Brown/soft coal.  Used for steam electric power generation.  Mined in open pits.  Production.
Open-pit Mining By Jessica Paddy. What Is open-pit mining? The process of extracting rocks and minerals through an open pit or hole in surface of the.
Designing an Internal Corrosion Program NACE Eastern Area Conference Roy D. Fultineer Jr.
Mining. By 1852, mining operations were well under way on the American River near Sacramento.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Reverse Osmosis Feed Treatment, Biofouling, and Membrane Cleaning
Logo L u c k y P e n n y The presentation will begin shortly…
Formation and Treatment
Subsurface drainage – Investigations
Environmental Chemistry Chapter 16: Wastes, Soils, and Sediments Copyright © 2012 by DBS.
Seasonal Changes in Biogeochemistry of a Natural Wetland Receiving Drainage from an Abandoned Mine Diane McKnight and Eric August – University of Colorado.
Tailings and Waste Rock Management Alternatives Study
Mining And its environmental impact. What determines the type of mining? Underground v.s. Surface Mining v.s. Solution Underground v.s. Surface Mining.
Acid Mine Drainage. Yellow boy in a stream receiving acid drainage from surface coal mining. An Enviromental problem in coal- Mining region Degrades water.
Exploitation of Lithosphere Resources Minerals and Energy.
The Formation of Abandoned Mine Drainage The Definition and Causation of Abandoned Mine Drainage Lessons Prepared by Trout Unlimited With Funds from Pennsylvania.
Chapter 5 Weathering and Soil
Source waters and flow paths in an alpine catchment, Colorado, Front Range, United States Fengjing Liu, Mark W. Williams, and Nel Caine 2004.
Environmental Toolbox. Technical Module Introduction.
Tracking Groundwater Contamination
SOME RECENT ADVANCES IN PASSIVE TREATMENT OF MINED DRAINAGE Arthur W. Rose Pennsylvania State University.
Acid Mine Drainage H-ESD : Environmental and Sustainable Development Michael Staudt, GTK.
Soil Composition Fertilizer. Soil  Loose covering on the ground containing a mixture of organic matter, minerals and moisture.
Sustainable development and the environment Remediation.
Adel Sharif University of Surrey
Welcome to the Presentation of Plasma Based HNO3 Manufacturing Plant.
Water Distribution. The Water Cycle Water is essential to life on Earth. Humans can live for more than month without food, but we can live for only a.
WaterSection 1 Water Resources Water is essential to life on Earth. Humans can live for more than month without food, but we can live for only a few days.
GO C3Analyze and Evaluate Mechanisms Affecting the Distribution of Potentially Harmful Substances within an Environment. Transport of Materials Through.
I. Mineral Resources: Concentration of naturally occurring solid, liquid or gaseous material that can be extracted and processed from earth’s crust at.
Prepared by: Pn. Hairul Nazirah Abdul Halim
Acid mine drainage Mateo Transueo. What causes it……... ► Acid mine drainage (AMD) is the drainage produced from mines containing sulfide minerals which.
Water Chapter 11. Water Resources Section 11.1 Water is essential to life on Earth. Humans can live for more than month without food, but we can live.
WaterSection 1 Section 1: Water Resources Preview Classroom Catalyst Objectives Water Resources The Water Cycle Global Water Distribution Surface Water.
Tailings Dam Stability
Conventional Sewage Treatment Plants:
Common method of solid waste disposal.
Attached Growth Biological WW treatment Systems
Lecture (8): liquid wastes treatment (primary, vital, advanced).
And its environmental impact
Groundwater Basics.
Numfon Eaktasang ,Ph.D Thammasat University
Abandoned uranium mine
Mining and Mineral Resources
Presentation transcript:

Tailings Dam Failures, ARD, and Reclamation Activities John A Meech Professor of Mining Engineering The University of British Columbia Email: cerm3dir@mining.ubc.ca

Outline Tailings Dam Construction Methods Tailings Dam Failures Reclamation of Dams, Waste Piles, and Sites Britannia Beach and the Millennium Plug Project Atmospheric Risks at the Sullivan Mine Acid Rock Drainage – what is it? ARD Control Methods Microbiology of ARD

Issues Stability of dam structures Use borrowed coarse material Cyclone tailings to extract coarse fraction Control pond water level so ground water does not enter the structure (phreatic surface) - Use barge/pump system - Use a tunnel/overflow tower system

Water-Retention Type Dam Steven G. Vick, 1983. Planning, Design, and Analysis of Tailings Dams, John Wiley & Sons, New York, pp. 369, ISBN 0-471-89829-5 [The textbook on the subject! A reprint was published in 1990 by BiTech Publishers Ltd., Richmond B.C., Canada (ISBN 0-921095-12-0)

Sequentially-built Tailings Dams Each lift requires more material – 1,3,5,7, etc.) Each lift requires more material – 1,2,3,4, etc.)

Sequentially-built Tailings Dams

Sequencing of Up-steam Tailing Dam Lifts

Phreatic Surface in Upstream Dams kL = permeability at the edge of the pond water at the slimes zone k0 = permeability at the spigot point (dam crest) kF = permeability of foundation kh / kv = anisotropy ratio (horizontal vs. vertical)

Ring Dike Construction - Kalgoorlie

Valley Deposit - HVC

Cross-Valley Plan View CROSS VALLEY IMPOUNDMENT - SINGLE AND MULTIPLE (Extracted from Vick, 1983. Planning, Design, and Analysis of Tailings Dams)

Side-Hill and Valley-Bottom Plan Views SIDE-HILL and VALLEY-BOTTOM IMPOUNDMENT - SINGLE AND MULTIPLE (Extracted from Vick, 1983. Planning, Design, and Analysis of Tailings Dams)

In-Pit Storage

Underground Storage Hydraulic sand Cemented fill Paste backfill Cycloned tailings sand (coarse fraction) Cemented fill Required to fill void space and create strength Paste backfill All tailings dewatered to 60-65% solids Dry rock fill With and without cement

Paste Backfill - Lisheen Mine, Ireland Backfill plant with deep cone thickener

Hazards for Tailings Dam Stability Two Major Hazards: Excessive increase in level of pond water on impoundment Operational error during filling Natural events (thunderstorms and/or flood inflow) Beach width between the water and dam crest becomes too small Phreatic surface rises in the dam and leads to collapse Liquefaction during an earthquake Tailings may change physical properties under seismic stress Cyclic stresses can lead to liquefaction Highly susceptible due to low bulk density and high saturation Hazards are not theoretical Many tailings dam failures prove the theories over and over again. Recent example - Harmony gold mine tailings dam in South Africa (Feb. 1994) after heavy rainstorm - village completely buried - 17 people killed

Water Balance in a Tailings Dam

Up-steam Tailing Dam Typical Failure

Up-steam Tailing Dam Piping Failure

Up-steam Tailing Dam Failure too rapid rise - must be < 15 m/year

Up-steam Tailing Dam Failure over-topping

Up-steam Tailing Dam Failure liquifaction

Up-steam Tailing Dam Failure slope stability

Comparison of Surface Impoundment Types Water Retention Upstream Downstream Centerline Mill Tailings Requirements Suitable for any type of tailings 40-60% sand in tailings. Low feed pulp density to enhance size segregation Sands or low-plasticity slimes Discharge Requirements Any discharge procedure suitable Peripheral discharge and well-controlled beach necessary Varies according to design details Peripheral discharge and nominal beach necessary Water Storage Suitability Good Not suitable for significant water storage Not so good for permanent storage. Temporary flood storage adequate with proper design

Comparison of Surface Impoundment Types Water Retention Upstream Downstream Centerline Seismic Resistance Good Poor in high seismic areas Acceptable Raising Rate Restrictions Entire embankment constructed initially 4.5 - 9 m/yr desirable. > 15 m/yr is hazardous. None Height restrictions for individual lifts may apply Embankment Fill Requirements Natural soil borrow Natural soil, sand tailings, or mine waste Sand tailings or mine waste if production rates are sufficient, or Natural soil Sand tailings or mine waste if production rates are sufficient, or Natural soil Relative Embankment Cost High Low Moderate

Tailings Dam Failures From 1968 to August 2009 - 149 documented failures worldwide 3,500 tailings dams exist around the world 25,000 to 48,000 large water storage dams exist around the world. Tailings dam failures closely match water storage dam failures So, failure frequency is far higher (an order of magnitude). Since 2001, the failure rate is roughly one every 8 months. 85% of incidents were Active tailings dams / 15% Abandoned dams 76% of incidents were Upstream construction methods 56% of incidents were dams greater than 30 m in height M. Rico, G. Benito, A.R. Salgueiro, A. Díez-Herrero, H.G. Pereira, 2010. Reported tailings dam failures. A review of the European incidents in a worldwide context.

20th Century Tailings Dam Failures

Ten Causes of Failure ________________________________________________ Type of Failure Number % Unusual Rainfall 36 24.5 Seismic Liquefaction 21 14.3 Poor Management Operation 15 10.2 Structural Failure 13 8.8 Piping/Seepage 10 6.8 Foundation Failure 9 6.1 Overtopping 9 6.1 Slope Instability 7 4.8 Mine Subsidence 3 2.0 Snow melt 2 1.4 Unknown 22 15.0 _________________________________________________ TOTAL 147 100.0

Dam Failures due to Management Issues Poor beach management Faulty maintenance of drainage structures Inappropriate dam procedures rapid dam growth Heavy machinery on top of unstable dam

Real-Time Monitoring of Tailings Dams Piezo-electric gauges Pore pressures at depth Both horizontal and vertical directions Control of barge pumps Controllable CCD cameras On top of dam structure Along all diversion ditches Water levels in all collection ditches/drains

Piezo-electric Gauges Basis of piezoelectric effect: - crystals under compressive loading generate an electric charge directly proportional to force applied.

Piezo-electric Gauges Strain gauge transducer with bridge circuit Charge is amplified into a proportional output voltage

Piezo-electric Gauges Piezoelectric sensors are small in construction Their high natural frequency is ideal for dynamic measurements. Virtually no displacement, as quartz gives mechatronic component with an electrical output signal. Sensitivity doesn't depend on size of quartz crystal

Spigot Discharge

Other Methods

Submarine Tailings Disposal Alpine lake disposal High alpine regions (no fish) Riverine disposal Banned except in Indonesia Deep Ocean disposal Kitsault and Island Copper

Sub-aqueous Tailings Disposal Options Impoundment Covered Dam Pit Filling Submarine

Factors affecting Submarine Disposal

Island Copper Site Reclamation After 20 years of operation, the Island Copper Mine began reclaiming its waste dumps in 1996. Tailings were discharged deep into the adjacent fjord known as Rupert Inlet.

Island Copper Pit Flooding Pit was flooded with sea water to create a Meromictic lake – 3 layers: Top – clean water; Middle – a reactor for surface ARD; Bottom – retain precipitated solids.

Island Copper Pit Flooding Pit was flooded with sea water to create a 3-layer meromictic lake: Top – clean water; Middle – a reactor for surface ARD; Bottom – retain precipitated solids.

Deep Sea Disposal of Tailings EZD – Euphotic depth UWD – Upwelling depth MLD – Mixed Layer depth Mill Mill EZD – Euphotic depth UWD – Upwelling depth MLD – Mixed Layer depth

Thickened Discharge Water drainage management is key http://technology.infomine.com/articles/1/1507/tailings.paste.thickened/paste.and.thickened.aspx

Dry Stack Tailings Anglo-American's La Coipa Mine in Chile http://www.tailings.info/index.htm

Dry Stack Tailings Anglo-American's La Coipa Mine in Chile

Dry Stack Tailings Deposition by trucking

Dry Stack Tailings Anglo-American's La Coipa Mine in Chile Dewatering tailings to a filtered wet (saturated) or dry (unsaturated) cake Must be transported by conveyor or truck Material is deposited, spread and compacted as unsaturated tailings pile Produces a stable deposit requiring no retention dam Typical moisture content is below 20% - several percent below saturation Combination of belt, drum, horizontal and vertical pressure plates and vacuum filtration systems

Dry Stack Tailings Advantages Dewatering tailings to a filtered wet (saturated) or dry (unsaturated) cake Must be transported by conveyor or truck Material is deposited, spread and compacted as unsaturated tailings pile Produces a stable deposit requiring no retention dam Typical moisture content is below 20% - several percent below saturation Combination of belt, drum, horizontal and vertical pressure plates and vacuum filtration systems

Dry Stack Tailings Disadvantages High capital and operating costs due to filtration Limited to low throughput operations (~20,000 tpd) Diversion systems to prevent inundation of stack Surface contour management to handle surface water Must prevent ponding and erosion of the stack No option to store water within a dry stack facility Sulfide oxidation creates high metal levels, low volumes Dust generation is problematic in arid climates Not suitable in high rainfall environment Seasonal fluctuations are important considerations

Co-Disposal of Waste & Tailings Co-mingling Tailings and coarse waste rock material transported independently Mixed together mechanically in storage facility or slurry-pumped Mixing promotes voids filling (mingling) to maximise density Co-placement Not mixed to form a single discharge stream Waste rock end dumped into tailings facility Waste rock used to create internal berms or retaining walls (sometimes) Co-deposition Similar to co-placement, but waste streams placed in layers Deposited tailings naturally enters voids in underlying rock End-dumping waste rock with tailings deposition down face prior to further end dumping

Dam Remediation Efforts By today's standards this dam is just too high for its design water flow and material properties. Built over many decades, a second dam was required to be built in the late 1990s to prevent water release (high As content).

Main dam of the Helmsdorf uranium mill tailings deposit, Oberrothenbach (Saxony)

Reparation Work

Stava Fluorite Mine Dam Failure, Italy 1985 Before After Tailings dam consisted of two basins built on a slope. Failure started with collapse of the up-slope basin. Inflow of released material caused over- topping and collapse of the lower basin. The resulting slurry wave travelled to Stava at a speed of 30 km/h; later it reached 90 km/h. Lives lost = 268 Damages = $133 x 106

Failure at Aznalcollar, Spain - 1998

Failure at Aznalcollar, Spain - 1998 Slab of soil beneath the dam slid ~1m towards Río Agrio. 2. The dam cracked and broke; the wall collapsed sweeping out the separation dam. 3. Between 5 to 7 million m3 contaminated water and slurry spilled through the gap. 4. The Río Agrio rose 3m, changing its course and eroding bed rock.

Los Frailes tailing dam failure, 1998

Los Frailes tailing dam failure, 1998

Reclamation and Revegetation

20 cm of organic soil over leached material Reclamation at Igarapé Bahia Mine in the Carajás Region, Amazon, Brazil 20 cm of organic soil over leached material

Mines Operate in Sensitive Regions Waste Dump Reclamation, Igarape Bahia Mine, Carajas, Brazilian Amazon

Mining Protects the Environment Installing a Heap Leach Liner in Chile

Mining Repairs its Past Problems Rio Algom's Reclamation Operation at the Poirier Mine Tailing Dam in Northern Quebec

Mine Site Reclamation and Closure BHP's Beenup Titanium Minerals mine at closure in early 1999 - W. Australia BHP's Beenup Titanium Minerals mine after final revegetation and reclamation

The Britannia Mine Reclamation Project

UBC at Britannia Beach Britannia Mine

UBC at Britannia Beach Britannia Beach UBC-CERM3 has been involved at Britannia Beach since 2001 when we installed a plug inside the 2200 Level tunnel to create a research facility. This plug had the “spin-off” benefit of eliminating all pollution flowing into Britannia Creek and the surface waters of Howe Sound.

Reclamation Issues in 2001 Acid mine drainage from tunnels (620 m3/hr) About 800 kg of Cu & Zn discharged per day Over 10,000 tonnes of metal since closure Groundwater contamination on the Fan Potential impacts on aquatic life Waste dumps and stockpiles Tailings at bottom of Howe Sound Sealing abandoned adits, demolition of derelict buildings (public safety issues)

Groundwater discharge < 5% of the flow 2-3% of the copper 3-4% of the zinc 4100 Level effluent 50-80% of the flow 30-55% of the copper 60-75% of the zinc 2200 Level effluent 20-50% of the flow 45-70% of the copper 25-40% of the zinc Plug the 2200 Adit Build a Treatment Plant Reclaim pits and waste dumps

Cutaway View of the Mine Workings

Cutaway View of the Mine Workings

Jane Creek after confluence of 2200 level effluent Britannia Mine – October 2000

Millennium Plug Research Project Pollution Plume – pre 2001

Millennium Plug Research Project Pollution Plume – pre 2001

Outcome – September 2011 Return of Adult Pink Salmon to Britannia Creek Numerous Media Reports

The Sullivan Mine Reclamation Failure

Reclamation Activities at Sullivan Mine 1998 - mine closed after 92 years 2000 – site reclamation on waste dumps (Number 1 Shaft and North dumps) 2004 - ditch was partially covered when the dump toe was extended 70m 2005 - 1m of glacial till was placed over the dump surface and the ditch Reduce water percolation Restrict air infiltration Slow rate of oxidation Monthly sampling to monitor flowrate and contaminant levels

Sampling Shed

Sullivan Mine Accident – May 15-17, 2006 Four people lost consciousness and died after entering the sampling shed Douglas Erickson, 48, a contractor Robert Newcombe, 49, Teck employee Kim Weitzel, 44, a paramedic Shawn Currier, 21, a paramedic Reason: lack of oxygen Immediately after the accident, O2 level in sump was ~2% & CO2 was ~7% Shed used regularly with no problem and effluent flow was previously open channel Reasonable to conclude shed was not a confined space at that time Shed was used 1 week before tragedy Oct. 2006, accident was identified as being Other mines were warned immediately by B.C. Chief Inspector of Mines to treat all sampling sheds as confined spaces "unprecedented in the history of mining"

Contributing Factors to the Accident During Summer of 2005 Dump & drainage ditch were covered to limit air/water infiltration and prevent human exposure to ARD O2-depleted effluent now isolated from the atmosphere Air in shed now directly connected to "bad" air in dump Prior use showed no problem (1 week before) False sense of security (9 years without any problem) Shed was safe before the ditch became a drain Design change created dangerous hazard Atmospheric conditions play a major role Temperature & pressure affect gas flowrate and direction

Contributing Factors to the Accident Before covering, ARD effluent was not O2-depleted O2-depleted out of dump, but contact with air restores O2 level After covering, ARD effluent was O2-depleted O2-depleted out of dump, and no contact with air until shed Possible mechanism O2 removal from static air in the shed by O2-depleted effluent Before O2 transfer In ditch After O2 transfer In shed

Breathing Waste Dump August 2006 - dump was instrumented Measure air velocity and gas composition in shed and pipe Temperatures below ~10°C- the dump "inhales“ (positive flow) Temperature above ~10°C- the dump "exhales“ (negative flow) May 13-17, 2006 - Increase in temperature / decrease in pressure DANGEROUS SAFE DANGEROUS

Temperature during week of the accident 5 10 15 20 25 5/1/2006 5/6/2006 5/11/2006 5/16/2006 5/21/2006 5/26/2006 5/31/2006 Temperature (oC) Daily average air temperature at Cranbrook airport in May 2006. Monitoring station was entered safely on May 8, 2006.

Gas Velocity vs. Outside Temperature

Cyclical Changes in Risk For a Confined Structure near dump toe Seasonal Variations Safe in winter / Dangerous in summer In Summer, minimum night temperature may lie above maximum dump temperature Dump blows toxic gas all the time - deadly. In Winter, maximum day temperature may lie below maximum dump temperature Dump will suck in air all the time - safe

Cyclical Changes in Risk For a Confined Structure near dump toe Diurnal Variations Safe at night / Dangerous in day time Outside temperature cycles from hot to cool Dump may transition from blowing to sucking if maximum dump temperature lies between maximum day and minimum night temperature In Spring – transition from Safe all the time to Dangerous in day In Fall – transition from Dangerous all the time to Safe at night

Summer Conditions Daily Atmospheric Temperatures Temperature 30 20 10 -10 -20 Daily Atmospheric Temperatures Maximum Internal Dump Temperature Temperature Time of Day

Fall Conditions Daily Atmospheric Temperatures Temperature 30 20 10 -10 -20 Daily Atmospheric Temperatures Maximum Internal Dump Temperature Temperature Time of Day

Winter Conditions Daily Atmospheric Temperatures Temperature 30 20 10 -10 -20 Daily Atmospheric Temperatures Maximum Internal Dump Temperature Temperature Time of Day

Spring Conditions Daily Atmospheric Temperatures Temperature 30 20 10 -10 -20 Daily Atmospheric Temperatures Maximum Internal Dump Temperature Temperature Time of Day

Cyclical Changes in Risk For a Confined Structure near dump toe Decadal Variations Safe(r) when maximum dump temperature has reached its long-term maximum value Dangerous when transitioning up or down Conceptual Period Boundaries: 0 - 10 years Initial period with rising danger 10 - 60 years Maximum danger - extremely hazardous 60 - 80 years Danger transitions from hazardous to problem 80 - 150 years Constant reduced danger – dump temp > max. outside temp. 150 - 170 years Rapid increase in risk - internal temp goes below max. outside temp. 170 - 180 years Maximum danger returns - extremely hazardous 180 - 190 years Danger transitions from hazardous to safe (pore gas O2 levels rise) 190 – onward Site is now safe - no O2-depleted gas generated or emitted

Decadal Variation in Risk Assessment Estimated Maximum Dump Temperature Maximum Outside Temperature Risk of a Confined Space Accident

Summer Conditions – transition to safe Dump reaches maximum temperature after 60-80 years Perhaps sooner with highly reactive dumps 30 20 10 -10 -20 Daily Atmospheric Temperatures Maximum Internal Dump Temperature Temperature Time of Day

Reference Dumps 1. White’s Dump at the Rum Jungle mine (U) in Australia (Harries and Ritchie, 1980, 1983, 1986, 1987; Ritchie, 2003) 2. Sugar Shack South Dump at Questa Mine (Mo) in New Mexico (Wels et al. 2003; Lefebvre et al., 2001a, 2001b & 2002; Shaw et al., 2002 Robertson GeoConsultants Inc., 2001) 3. South Waste Dump at the Doyon Mine (Au) in Quebec (Wels et al. 2003) 4. Nordhalde Dump at the Ronnenburg Mine (U) in Germany (Wels et al. 2003; Smolensky et al. 1999) 5. Aitik Mine dump (Cu) in Sweden (Stromberg and Bawart, 1999; Stromberg & Bawart, 1994; Ritchie, 2003; Takala et al., 2001) 6. Number One Shaft Waste Dump at the Sullivan mine (Pb/Zn) (Lahmira et al., 2009)

Test Dumps 1. Main Waste Dump at Equity Silver Mine (Au/Cu/Ag) in British Columbia (Aziz and Ferguson, 1997; Lin, 2010) 2. West Lyell Dump at Mt. Lyell Mine (Cu) in Tasmania (Garvie et al. 1997) 3. North Dump at the Sullivan mine (Pb/Zn) (Lahmira et al., 2009; Dawson et al., 2009)

Validation of the Model Dump Site Estimated Internal Temperature Reported Internal Temperature Nordhalde 10-15 14 Doyon 40 45 Sugar Shack South > 40 Aitik Mine 2-6 3 White’s Dump (1 year after cover) 44 Number One Shaft 10 -15 12 Equity Silver Main 52 West Lyell 35-40 38 (Max) Sullivan North 30-35 33 Nordhalde, Doyon, Sugar Shack S., Aitik, White’s, and Number One Shaft dumps are reference input cases North Dump, West Lyell, and Equity Silver Main are test cases

Overall Results for all 9 dumps Time of Year DoB in High Gas Velocity at dump toe Degree of Belief in High Risk Value Assessment Cover Value "high" reactivity Gas Generation in Summer Gas Emission via pathway Gas Confinement Human Exposure Nordhalde Summer 88% 60% Neg. Small 100% 63% 90 100 0.53 Marginal Hazard January Pos. Big 66% 18% L 0.19 Problem Doyon 0% Pos. Big 43% ML 15% L 0.14 Sugar Shack 74% 23% ML 0.15 Aitik 5% Neg. Big 66% MH 76% ML 0.38 Significant Neg. VS 20% MH 37% MH 0.21 White’s Pos. VS 27% ML 0.33 No. 1 Shaft 89% 69% Neg. VB 0.90 Hazardous May 80% 0.65 Main Equity Silver 71% 46% MH 18% 0.16 Pos. VB 35% MH West Lyell 94% 21% M North Pos VS 0.31 * L = low ML = medium-low M = medium MH = medium-high A fuzzy term other than "high" was used because the related DoB in "high" = 0. Note: Risk Value for May at No. 1 Shaft dump calculated at 0.65, yet we know with full certainty the accident occurred. This poor correlation reflects fluctuations each day in May. A value of 0.65 causes AFRA to recommend caution.

Note: confined structure on top of the dump Sampling Shed

ARD

Dealing with Reactive Tailings Two major types each creating a third issue Acid Rock Drainage (ARD) Cyanide ARD leads to dissolution of Heavy Metals Cyanide forms complex metallic ions Metallic pollution (Al, Cu, Cd, Co, Fe, Mn, Pb, Zn) Arsenic and/or selenium

What is ARD and how do we deal with it? Impact first reported in 1556 by Agricola in De Re Metallica Yet the term Acid Rock Drainage wasn’t coined until 1970 Significant work by NRCan (MEND Program) and Canadian companies developed innovative techniques to handle this ubiquitous problem ARD requires sulphides, water, and air (and bacteria) Minerals are the source of sulphur and iron Air is the source of oxygen Water is the transfer medium for oxygen from air to rock Bacteria catalyze the reaction of Fe+2 to Fe+3

How long does ARD last? ROCK

Generation of ARD from pyrite ARD from surface coal mine in Missouri Iron hydroxide (yellow boy) precipitates as pH rises from downstream dilution Problem can last for decades Photo Credit: D. Hardesty, USGS Columbia Environmental Research Center

The Colours of ARD

How long does ARD last? - Forever! Corta Atalaya, Rio Tinto, Spain - abandoned pyritic open pit Rio Tinto in Spain – 2 millennium after mining

Is it only Mining that causes ARD? Blood Falls at Taylor Glacier, Antarctica

Acid Rock Drainage – Metal Leaching ARD Formed by atmospheric oxidation (i.e., water, oxygen, and carbon dioxide) of the common Fe-S minerals pyrite and pyrrhotite in the presence of bacteria Thiobacillus ferrooxidans, T. acidophilus, and T. thiooxidans ML Acid (H2SO4) leads to dissolution of metals and subsequent pollution of aquatic environments

Basic Chemistry of ARD (from FeS2) Basic Issues behind the Chemistry: Equilibrium of Ferrous-Ferric Ions Presence of Bacteria (Thiobacillus ferrooxidans) Must have an initial source of oxygen (i.e., air) Must have a way to transfer electrons (i.e., water)

ARD Reactions Ferrous Sulphate formed by Abiotic Oxidation (slow): 2FeS2 + 2H2O + 7O2 = 2FeSO4 + 2H2SO4 Bacterial Oxidation of Ferrous Sulphate (T. ferrooxidans): 4FeSO4 + O2 + 2H2SO4 = 2Fe2(SO4) 3 + 2H2O Ferric Sulphate is Reduced and Pyrite Oxidized by these reactions: Fe2(SO4)3 + FeS2 = 3FeSO4 + 2S 2S + 6Fe2(SO4)3 + 8H2O = 12FeSO4 + 8H2SO4 Elemental Sulphur Oxidation (T. thiooxidans): 2S + 3O2 + 2H2O = 2H2SO4 Acid dissolves metals into solution meaning ARD is virtually always accompanied by high metal levels discharged into the environment.

Bacteria are Essential Thiobacilli from bacterial generator (no flagella) - left (x 5,000) - centre (x 20,000) Thiobacilli grown on ferrous iron (flagella) - right (x 5,000) Formation of Bio-films can lead to long delay in onset of ARD (7-10 years) from Le Roux, N.W., et al., 1974. Bacterial Oxidation of Pyrite, Proc. 10th International Mineral Processing Congress, Institution of Mining and Metallurgy, London, 1051-1066.)

Bacteria and Metal Leaching For substantial metal mobilization, the following conditions must be present: Ferric iron for rapid sulphide oxidation T. ferrooxidans and O2 for Fe+2 to Fe+3 oxidation pH compatible with T. ferrooxidans, typically pH 1.5 - 4.5

* ORP = Oxidation Reduction Potential (REDOX) Role of Bacteria T. ferrooxidans acts to oxidize ferrous to ferric iron (Fe+2 to Fe+3) The ionic reaction is: 4Fe+2 + O2 + 4H+ = Fe+3 + 2H2O Fe+3 is a very powerful oxidizing agent With Fe+3:Fe+2 ratio of only 1:106, ORP (Eh) > +0.4v * General reaction of Fe+3 with base metal sulphides is: MS + nFe+3 = M+n + S + nFe+2 Base metal sulphides react slowly with H2SO4 alone * ORP = Oxidation Reduction Potential (REDOX)

Metal Leaching – Influence of ORP (Eh or REDOX) and Bacteria Malouf, E.E. and Prater, J.D. (1961), Role of Bacteria in the Alteration of Sulphide, J. Metals, NY, 13, p353-356. Garrels, R.M. and Christ, C.L. (1965), Solutions, Minerals and Equilibria, Harper & Row, New York, 216-222.

Stages in ARD Generation (note the lag time)

Control of ARD Removal of one essential component (sulfide, air, or water): Waste Segregation and Blending Blend-in neutralizing potential (NP) rock to yield pH 7.0 Base additives Add limestone to buffer acid reactions Liners, Covers, and Caps Water covers are the most effective Soil, clay, and synthetic covers (geomembranes) minimize water and air infiltration

Control of ARD Bactericides Collection and treatment of contaminants Chemicals that reduce/kill bacteria (T. ferrooxidans) Effective, but costly, and “bugs” mutate Collection and treatment of contaminants Active or Passive treatment Active treatment - high-density lime sludge Passive treatment in constructed wetlands Bioremediation (micro-organisms) Remove metals directly Introduce viruses against the bacteria

Active Treatment Most effective Most expensive All effluent processed in a treatment plant May require processing for decades

High-Density Sludge Water Treatment Plant WTP at Britannia Mine Site Howe Sound, British Columbia Capital Cost = ~ $12.0M Operating Costs = ~ $ 1.5M/year

HDS Plant – Process Flow Diagram Sludge/Lime Mix Tank Lime Reactor Clarifier Effluent Overflow Sludge disposal Sludge Recycle Lime Tank Flocculants Tanks Recycle Water Lime Paste Acidic Feed Water Air This a simplified process flow diagram for the HDS process at Britannia Beach . Starting on the left, lime slurry is combined with recycled sludge in a small mix tanks This lime/sludge mixture overflows to a rapid mix tank where it combines with the acidic feed. Lime dosage to the lime/sludge mix tank is controlled by pH at the rapid mix tank overflow. The rapid mix tank overflows to a lime reactor. Oxidation and precipitation reactions are carried out in this reactor. Iron and manganese are oxidized using air to assist the process by co-precipitating other elements as well such as arsenic. Flocculant is added to the lime reactor O/F prior to flocculation in the clarifier feed-well . The clarifier separates treated effluent from the sludge. The sludge is pumped back to the lime/sludge mix tank to complete the process. Clarifier overflows to a recycle water tank (not shown), which provides water for flocculant dilution, flushing and dilution of the recycle and sludge transfer systems. Excess sludge at a density of 20 to 25 wt% solids is sent for filtering to a cake that is about 35%solids (like toothpaste). 119

Sludge Disposal Sludge Disposal by truck – cost = ~$40/tonne Other options Manufacture bricks by blending sludge with clay or pumice Use low-temperature process with organic resins Use high-temperature process to harden into a ceramic Examine opportunities to recover Cu and Zn From the effluent prior to HDS From the sludge by leaching 120

So Reduction Process Schematic H2S Nutrients BIOREACTOR (So Reduction) Sulphur Electron donor Cu Precip Zn CuS ZnS Treated Water Contaminated Drainage Metals, SO4 Soda Ash or Lime BioteQ After R.W. Lawrence, BioteQ

SRB Plant – Major Equipment Copper Product Zinc Product ARD Bioreactor So e- donor Lamellar Clarifier Filter Press Gas-Liquid Contactor To Lime Plant or Discharge BioteQ After R.W. Lawrence, BioteQ

(projected settling area SRB Plant Layout: ~100m2 GAS-LIQUID CONTACTOR BIOREACTOR 1.8 m LAMELLA CLARIFIER (projected settling area 150 m2) 5.9 m 3.1 m 2.4 m FILTER-PRESSES 0.8 m x 3 m W x L REAGENT PREP AREA Cu -CONC STORAGE 8 m MCC DOOR TRUCK Zn -CONC 7 m BLOWERS SCRUBBER BioteQ After R.W. Lawrence, BioteQ

Production Summary Flow Feed Water Discharge Water Cu Concentrate 14,880 m3/d – average over 12 months Feed Water [mg/L] 18.0 Cu, 20.0 Zn, 0.1 Cd Discharge Water [mg/L] 0.05 Cu, 0.01 Zn, 0.01 Cd Cu Concentrate 187.0 tonnes per year contained copper 51.1% Cu, 2.1% Zn, 0.24% Fe, 33.1% S Zn Concentrate 185.5 tonnes per year contained zinc 52.4% Zn, 1.5% Cu, 0.3% Cd, 0.8% Fe, 27.1% S Additional Benefits Lime Savings $64,000 per year (32%) Sludge Reduction 340-450 tonnes per year (15-20%)

Commercial Scale Plants

Chemistry of SRB Process for Metal Recovery Sulphate reduced by organic compounds: SO4= + CH3COOH + 2 H+ = HS- + 2 HCO3- + 3 H+ 1. Sulphide ions precipitate metal sulphides: HS- + M2+ = MS↓ + H+ 2. S= + M2+ → MS↓ 3. Equilibrium of H2S H2S(g) = H2S(s) = HS- + H+ = S= + 2H+ 4. http://www.telusplanet.net/public/jcarroll/ION.HTM

Pumice rock – extremely light

Brick Veneer Cladding - examples NRC Process Evaluation - http://www.nrc-cnrc.gc.ca/eng/ibp/irc/ci/volume-4-n4-7.html Canyon Stone - http://www.canyonstonecanada.com

Passive Treatment Technologies Name Description Function Selected References Aerobic wetlands Shallow wetlands Emergent vegetation Fe and Mn oxidation, Co-precipitation of Metals, Sorption on Biomass Eger and Wagner, 2003 USDA and EPA, 2000 Open limestone channels Acidic water flows over limestone, or other alkali Alkalinity addition Al, Fe, Mn oxide precipitation Ziemkewicz et al., 1997 Anoxic limestone drains Water flows through limestone channel under anoxic conditions Alkali addition; Fe Precipitation; Limestone Armouring Prevention Watzlaf et al., 2000 Anaerobic wetlands Subsurface wetland, isolated from air by water or material Alkali addition; Sulphate Reduction; Precipitation of metal sulfides; Sorption on Vegetation Brenner, 2001 Successive Alkalinity Producing Systems Vertical flow systems drain through limestone layers & anaerobic organic matter Alkalinity addition; Sulphate Reduction Metal Precipitation Kepler and McCleary,1994 Zipper and Jage, 2001 Sulfate-Reducing Bioreactors Collected water in anoxic chamber containing organic matter and SRBs Alkalinity addition; Sulphate reduction; Metal Precipitation Gusek, 2002 Permeable Reactive Barriers Intercepted groundwater flows through permeable barrier containing reactive material Alkalinity addition; Sulphate reduction; Metal Precipitation and Sorption Benner et al., 1997 US DOE, 1998 Amendments Materials added to ARD sources or holding areas Alkalinity addition; Sulfate reduction; Metal Precipitation; Sorption; Chelation; Revegetation Chaney et al., 2000 Limited to low effluent flowrates

Covers

Liners, Covers, and Caps Liners used to prevent seepage form the dam Covers used to inhibit influx of water and air Caps used to seal dam entirely Expensive materials and installation Must be installed with great care Biggest issue – degradation over time

Factors affecting Soil Cover Performance International Network for Acid Prevention, 2003. Evaluation of Long-term Performance of Dry Cover Systems, Final Report. O’Kane Consultants Inc., (Eds.), Report No. 684-02.

Geomembranes Plastics (polyethylene (PE) High density poly. (HDPE) Chlorinated poly. (CPE) Chloro-sulphonated poly. (DuPont HYPALON) polyvinyl chloride (PVC) Low-density poly. (LLDPE) Geosynthetic clay liners (GCL) Geomembranes impregnated with bitumen After Meer, S.R. and C.H. Benson, 2007. Hydraulic conductivity of geosynthetic clay liners exhumed from landfill final covers. J. Geotech. and Geoenviron. Eng., 133(5):550-563.

Geo-Membranes: Benefits and Disadvantages Low permeability High cost Relatively easy to install Cost depends on distance from supplier to site Resistant to chemical and bacterial attack Limited design life - 50 to 100 years Requires proper bedding and protective cover Geotechnical instability on steep slopes Vulnerabilities include: - Sun light (UV breakdown) - Puncture by surface traffic - Cracking and creasing - Seam difficulties - Uplift pressure from fluid or gases - Degradation by cation exchange with GCLs - Settlement of underlaid materials - Thermal expansion and contraction After Meer, S.R. and C.H. Benson, 2007. Hydraulic conductivity of geosynthetic clay liners exhumed from landfill final covers. J. Geotech. and Geoenviron. Eng., 133(5):550-563.

Field Monitoring of a Waste Pile Cover MEND, 2004. Design, construction and performance monitoring of cover systems for waste rock and tailings. Report 2.21.4, O’Kane Consultants Inc., (Eds.), Natural Resources Canada.

Covers and Climate Types Wickland, B.E., Wilson, G.W., Wijewickreme, D., and B. Klein, 2006. Design and evaluation of mixtures of mine waste rock and tailings. Canadian Geotechnical Journal, 43:928-945.

Sub-aqueous Tailings Disposal Options Impoundment Covered Dam Pit Filling Submarine

Factors affecting Submarine Disposal

Microbiology of ARD

Microbiological Aspects of ARD Bacteria form films on sulfide surfaces Reaction rate accelerates up to 108 times T. ferrooxidans/L. ferrooxidans considered responsible for catalytic behaviour Microbial makeup is controlled by site environment Microbes not well-studied or understood

Microbiological Aspects of ARD Thiobacillus ferrooxidans http://www.mines.edu/fs_home/jhoran/ch126/thiobaci.htm Leptospirillum ferrooxidans http://microbewiki.kenyon.edu/index.php/Leptospirillum

Microbiological Aspects of ARD Key organisms (T. & L. ferrooxidans) >> global significance Physiological and genetic aspects well studied Microbial diversity specific to site environment Recent advances on structural dynamics of communities Biofilms on sulfide surfaces play a key role Bacteriophage impact negatively on bacterial populations

ARD Mitigation with Bacteriophage Novel approach to ARD control Isolate phage that infect ARD-generating “bugs” Create deadly mixture of viruses to control microbial ARD communities with biology New and unexplored cross-disciplinary field

Microbiological Aspects of ARD Structure of microbial communities

Microbiological Aspects of ARD Biogeographic distribution of key microbes

Microbiological Aspects of ARD Diversity revealed by molecular methods

Microbiological Aspects of ARD Fluorescent micrographs (FISH) of active phage

Bacteriophage Viruses that infect bacterial cells Intracellular parasites – do not generate energy or synthesize proteins by themselves Infection results in death, if phage is virulent Temperate phages kill only a small fraction of cells and cause infected host to mutate

Bacteriophage – friend or foe Many shapes and sizes Phage are very small, (20-200 nm in diameter) Some phage break down biofilm matrix to infect "protected" cells Photo credits: ICTV Database www.ncbi.nlm.nih.gov/ICTVdb

Bacteriophage – friend or foe T4 bacteriophage attacking an E. Coli bacterium

Bacteriophage – an ARD solution? Like lunar landers, bacteriophage attach to the microbial cell wall and inject their DNA for replication Cell Wall

Bacteriophage - an ARD Solution? Photomicrographs of T4 bacteriophage for E. Coli

Bacteriophage - an ARD Solution? The Lytic Cycle leads to the death of the host The Lysogenic Cycle leads to mutation of the host

ARD Mitigation with Phage Inject phage into a dump/dam Coat surfaces with phage-containing biofilm Phage will control microbial population, not eliminate it Phage for ARD-microbes do exist – why do they become dormant at low pH?

Biofilms and Quorum Sensing Complex association of cells with an exo-polysaccharide matrix Adhere strongly to sulfide surface or grow deep within pores and cracks Play integral role in composition & stability of microbial communities

Biofilms and Quorum-Sensing Biofilms - bacterial colonies living in a kind of social order Biofilms form on: 1.  wet solid surfaces 2.  soft tissue surfaces in living organisms 3.  liquid-air and liquid/solid interfaces ARD-relevant locations: rock surfaces in marine or freshwater environments

Progression of Biofilms Evolution from Planktonic Behaviour to a Biofilm REVERSIBLE ADSORPTION OF BACTERIA (seconds) IRREVERSIBLE ATTACHMENT OF BACTERIA (sec - min) GROWTH & DIVISION OF BACTERIA (hours - days) EXOPOLYMER PRODUCTION & BIOFILM FORMATION (hours - days) ATTACHMENT OF OTHER ORGANISMS TO BIOFILM (days - months)

Benefits of Biofilms for Microbes

Common Example of a Biofilm Dental Plaque Stained with Gram's Iodine

Bio-Films and Quorum-Sensing Gene expression regulated by cell density changes Q-S bacteria release signal molecules (auto-inducers) Auto-inducer concentration increases with cell density At threshold concentration, gene expression changes Q-S communication regulates many physiologies: - symbiosis - virulence - competence - conjugation - antibiotic production - Programmed Cell Death (PCD) - sporulation - biofilm formation

Bio-Films and Quorum-Sensing Big Question? Can we use Q-S knowledge to get microbes in a bio-film to “commit suicide” without creating new side-effect problems?

Conclusions Tailings Dam Construction must be done with care and knowledge about the tailing material, about the foundation material – both physical and chemical factors are important Every 8 months, a tailings dam fails somewhere in the world Downstream methods are safest Reactive Tailings require additional care and concern for ARD and Metal Leaching Cyanide Tailings also generate metal pollution Confined Space issues may exist with ARD wastes Microbiology is a new approach receiving attention

Questions?