US Fleet Forces Explosive Ordnance Disposal Group Two BOLD ALLIGATOR 2014 (BA14) TOCEX AAR 06 Aug 2014 UNCLASSIFIED Overall Classification: UNCLASSIFIED//FOUO/REL.

Slides:



Advertisements
Similar presentations
SCO 3 Crewing Optimization As-Is Processes January 9, 2006
Advertisements

MONITORING OF SUBGRANTEES
Tips to a Successful Monitoring Visit
Program Management Office (PMO) Design
Roadmap for Sourcing Decision Review Board (DRB)
Staging Area Set Up and Operation Workshop Refer to Field Operations Guide, Chapter 5 NERT College Disaster Operations.
Incident Command System
US Fleet Forces Explosive Ordnance Disposal Group Two BOLD ALLIGATOR 2014 (BA14) TOCEX AAR 07 Aug 2014 UNCLASSIFIED Overall Classification: UNCLASSIFIED//FOUO/REL.
More CMM Part Two : Details.
November 17, 2009 Sunflower Project Monthly Conversion Meeting – November.
Join the conference call by dialing the conference number in your Invitation or Reminder s. Please put your phone on mute. Please stand by! The webinar.
25 TAC Quality Assurance in a licensed ASC
“Who’s In Charge?” “THE COMMAND SECTION”. The Incident/Unified Commander Incident/Unified Commander(s) provides direction and guidance through:  Key.
IS-100 Intro. to Incident Command System
People First Manual Timesheet Training Guide Section 1
1CUL.PPT Last Revised: 10 June 2005 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
4 Incident Command System. 4 Objectives (1 of 2) Describe the characteristics of the incident command system (ICS). Explain the organization of the ICS.
 SOPs are often called the ‘bible’ for your daily operation and as such should bring consistency to the actions of your team.  SOPs tend to fall into.
Leaders Manage Meetings
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
UNCLASSIFIED / FOR ADVISOR USE ONLY Lance Armbruster Contractor (p.1) The Working Group – An Overview Mr. Lance Armbruster, G7 Mentor.
Property Custodian Meeting July 10, Review of USM Internal Auditor Findings  Excerpt from the USM Internal Auditors report dated May 31, 2012:
Unit Introduction and Overview
Visual 7.1 Common Responsibilities Version 2.0 Unit 7: Common Responsibilities.
Battle Staff Up-Date Briefing Overview. Battle Staff Up-Date Brief Overview Order of brief Current situation up-date Intelligence summary Mission (s)
Security Baseline. Definition A preliminary assessment of a newly implemented system Serves as a starting point to measure changes in configurations and.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
From Research Prototype to Production
IS-700.A: National Incident Management System, An Introduction
The Incident Command System
MORDT SEA training. MARINE CORPS MOBILIZATION COMMAND Mobilization Operational Deployment Readiness Test MISSION: –Provide Quality Forces to the Gaining.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
2010 Test Security 2011 Campus Test Coordinator Training Test Security January 26, 2011 Freeport Intermediate school.
MyFloridaMarketPlace CRB Meeting
NAVAL CORRESPONDENCE Topic TERMINAL OBJECTIVES 31.0 Identify the proper format and purpose of Naval Correspondence to include the use of Standard.
1GENES.ppt Last Revised: 11 JUN 99 General Emergency Services Incident Command System Developed as part of the National Emergency Services Curriculum Project.
Communications in the Face of Crisis Lesley Bruinton Tuscaloosa City Schools.
Continuity of Operations Planning (COOP) for Community Colleges Welcome Introductions Administration Agenda Classroom Decorum Participant-Instructor.
Guest Cycle A division of the flow of business through a hotel that identifies the physical contacts and financial exchanges between guests and hotel employees.
U.S. General Services Administration FTS2001 Transition Baseline Inventory Tool Adam Lesser GSA Networx Transition Team (Booz Allen Hamilton) October 25,
1 UNCLASSIFIED CMOC Organization & Training. 2 UNCLASSIFIED Agenda CMOC Structure CMOC Watch Cycle Training Overview Daily Training & Exercises Schedule.
Visual 6.1 Incident Resource Management Unit 5: Incident Resource Management.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Leaders Training Program, JRTC TOC OPERATIONS. Leaders Training Program, JRTC CONSIDERATIONS DON’T BE TOO AUSTERE. MUST HAVE SUFFICIENT ROOM AND PEOPLE.
Subjects covered in this module include: I200-SL Module 6 Responsibilities Associated with ICS Assignments Module 6 Responsibilities Associated with.
Prepare and Issue the Coalition / Combined Task Force OPORD Multinational Planning Augmentation Team (MPAT) Purpose References Discuss the process of preparing.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Intro to Staff Organizations
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
Northeast Colorado All Hazards Region 1 Mass Casualty Incident Plan Training Section 8 – Roles & Responsibilities.
Chapter 12 Implementation and Maintenance
The Office Procedures and Technology Chapter 7 Time and Workstation Management Copyright 2003 by South-Western, a division of Thomson Learning.
UNCLASSIFIED Crisis Action Planning 01 January 2006 CTF Operation Order UNCLASSIFIED ing.
Webinar will start in a few moments Hosting Your Own CCO Examinations – Part 1: Written Exams Committed to Quality, Integrity and Fairness in Testing Since.
1 Procurement Operations Division (POD) Guidance for Telework and Work Schedules February 2016.
COOP Continuity of Operations. COOP COOP is “Good Business Practice” Ensure that county and state agencies can maintain and continue operations Ensure.
Finance and Administration Developed Using The CAP-USAF Pamphlet 12 and CAP ES materials 6/7/2016NESA 2012 phm1.
Getting Started Preparing Providers, Staff and Systems for Improving Care with Call Simplified.
ACS ACTIVATION. The first section of this presentation describes the initial activities of the ACS Staff. The second section describes the initial activities.
A School of the Bruin Leaders’ Academy – Pilot Aug 2014.
Module 3 Organization Overview Module 3 Organization Overview Subjects to be covered in this module include: Terminology Terminology Organizational structure.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Patrolling and Patrol Bases
MULTI- CASUALTY INCIDENTS GLENDALE FIRE DEPARTMENT ANNUAL TRAINING MARIANNE NEWBY.
Strategic National Stockpile Points of Dispensing (PODs)
Protection of Minors Program Coordinators Refresher Session
Module 3 Organization Overview
HART Technologies Process Overview
Presentation transcript:

US Fleet Forces Explosive Ordnance Disposal Group Two BOLD ALLIGATOR 2014 (BA14) TOCEX AAR 06 Aug 2014 UNCLASSIFIED Overall Classification: UNCLASSIFIED//FOUO/REL TO USA,MNFA 1

US Fleet Forces Explosive Ordnance Disposal Group Two Manning Not present during TOCEX –PAO, JAG (no requirement this TOCEX) –COPS LCPO (Leave) –2 x FOPS O (Not available, not identified) –2 x BWC (Reserve, PG) –2 X N4 (Identified requirement during TOCEX) Additional Augments requirements identified –C2PC Team 5 pax (2 per watch plus senior enlisted) –Camp Mayor / Force protection Senior Enlisted or Warrant –ECP watch 4 pax (2 per watch) –Admin Enlisted YNC act as N1A –Additional Battle Watch Section 2

US Fleet Forces Explosive Ordnance Disposal Group Two Reporting / Training CCIRs not established Watch Turnover Procedures established Intel JQR need to be updated Basic Intelligence templates not built CUB Template Battle Rhythm Muster / PERSTEMPO Daily Input to HQ DIMS Tent inventory check list Pack out list CONOPS / OPORD 3 Chat/CENTRIX familiarization training

US Fleet Forces Explosive Ordnance Disposal Group Two Camp Lay Out TOCEX tent –From to (size of tent) –Rotating workstation 180 degrees –Printer location –Reconfigure N2 and CDRE space to reduce foot traffic in TOCEX Reduce structure by 1 x ______ and 1 X______ Optium placement of ECU –maximum distance from tents –TOCEX and Brief tent priorty for noice conservation –Fans facing away from tents 4

US Fleet Forces Explosive Ordnance Disposal Group Two Camp Lay Out TOCEX tent –From to (size of tent) –Rotating workstation 180 degrees –Printer location –Reconfigure N2 and CDRE space to reduce foot traffic in TOCEX Reduce structure by 1 x ______ and 1 X______ Optium placement of ECU –maximum distance from tents –TOCEX and Brief tent priorty for noice conservation –Fans facing away from tents 5

US Fleet Forces Explosive Ordnance Disposal Group Two Other 6 Travel order guidance established VGA switches for changing monitors Internal Comms (handhelds) Recompression chamber Ambulance

US Fleet Forces Explosive Ordnance Disposal Group Two Agenda Administration (N1) Intelligence (N2) Operations (N3) Battle Watch (BWO) Logistics (N4) Communications (N6) Training (N7) Medical (N9) 7

US Fleet Forces Explosive Ordnance Disposal Group Two Administration (N1) Topic 1.Admin Manning (2 pers for 5 subunits and ~900 NEF personnel) 2.Daily Muster/PERSTAT POA 3.MI&E (PMR vs CMR) 4.Travel requests, DTS orders and Battle Records for CTF/NEF pers Recommendation 1.Request 1-2 additional YN/PS (1 E6-E7 preferred) * Able to act as N1 where needed (SIQ, Watch, briefs, etc) * Secondary N1A (e.g. watch, rest, SIQ, etc) 2.Quickly establish muster/PERSTAT procedures and deadlines (use CTF 56 format) 3.Identify CMR vs PMR MI&E allowance by NECC 4.Establish NEF due dates for travel requests to NECC, DTS orders submission and Battle Records (Page 2, SGLI, no-fee passport) 8

US Fleet Forces Explosive Ordnance Disposal Group Two Intelligence (N2) EXEC 1.CCIRs not established Recommendation 1.Establish enduring CCIRs for use in multiple phases to drive PIR, IR, FFIR generation and to focus the TOC on meeting CDREs information requirements. 9

US Fleet Forces Explosive Ordnance Disposal Group Two Intelligence (N2) TOC 1.TOCEX Schedule a.TOCEX Schedule was not adhered too, mtgs were late, codes were not prepared 2.TOC Watches a.Standing of watches not required, i.Unable to establish T/O procedures ii.Practice Relief for Chow/Head 3.TOC Manning a.TOC not properly manned Recommendation 1.Establish TOCEX Director whom is responsible for maintaining SOE 2.Stand watches to practice all functions 3.Request 4x additional bodies from NECC (BW Phone/Cop) 10

US Fleet Forces Explosive Ordnance Disposal Group Two Intelligence (N2) INTEL 1.INTEL Watch JQR a.Intel Watch JQR out of date (2010) 2.INTEL Watch Turnover procedures a.Intel Watch turnover procedures have not been established 3.Basic Intelligence templates not built Recommendation 1.N2 to scrub JQR and tailor to a NEF ECH IV AFP 2.N2 to establish baseline turnover checklist 3.Build: CUB templates for Intel, Daily Intentions Message (DIMs) template, and RFI reporting procedures 11

US Fleet Forces Explosive Ordnance Disposal Group Two Intelligence (N2) COMMS 1.E-ICOP a.E-ICOP not functional 2.Comms Set-up a.Comms readiness was amazing, but can be improved to minimize excessive Delay in Comms being functional Recommendation 1.Include in SAR/GAR msg to ensure can be used in NETC2. 2.Establish a checklist to ensure all staff are on the same page and focused on having all systems and functions up (i.e., logins, distros built, bookmarks, share drives built, ability to post to share drive(s), OWA to NIPR, OWA to SIPR, receive s internal, receive s from external) 12

US Fleet Forces Explosive Ordnance Disposal Group Two Intelligence (N2) AT/FP 1.Force Protection Officer a.Lack of designated Force Protection Officer created tasking bleed to other codes. 2.ECP (Daytime) a.Personnel weren’t screened at a viable ECP creating security violation rich environment 3.Camp Watches (nighttime) a.Not pre-briefed on duties/expectations Recommendation 1.Designate FPO to run point with Landward Security element, maintain/train ECP. 2.RFF for 2-4 personnel to train and man the ECP. Give the rosters of cleared personnel, train to handle VIPs/LNO visits/Foreigners. Give them authority for patdowns and confiscate PED (i.e., phones) 3.Ensure that watches arrive on time and plan to remain onsite during their time period (forces chow discussion). Provide Watch/Roundschecklist (i.e., verify shred bags in place, verify fire extinguishers near generators still there, check in with N6, verify integrity of other tent flaps, clean, etc…) 13

US Fleet Forces Explosive Ordnance Disposal Group Two Intelligence (N2) CAMP 1.Tent Cleanliness a.Cleanliness lacking 2.Tent Basics a.Basic items required in most tents Recommendation 1.Each tent should address internally their cleaning standards and frequency. 2.Ensure each tent has a fire extinguisher, sledge hammer for EDP, and properly labeled shred bag 14

US Fleet Forces Explosive Ordnance Disposal Group Two Operations (N3) Manning Request Augments to make up aThree BW rotation(24hr ops) Requires BWC(03)/BWA(01/02)/BWS(E6/E7). Request an Operations Specialist team (geeks operators/radio operators), comprising of 4 OS’s to be placed on the three battle watches and a OSCS as Team lead. Title X functions OWA on SIPR SVTC Backup in case of total failure for more than a day…Bogue Field 15

US Fleet Forces Explosive Ordnance Disposal Group Two Battle Watch (BWO) Lessons learned (action) 1.TOC Manning: 2.Printer location: 3.Location of N2 and Triad work spaces IRT: 4.TOC Configuration: 5.A/C return line 6.Chat/CENTRIX familiarization training Lessons learned (supply) 1.General supplies ordered – status 2.VGA switches for changing monitors 3.classifications signs (UNCLASS,SECRET/NOFORN, CENTRIX) 4.Chairs suitable for 12 hour watches 16

US Fleet Forces Explosive Ordnance Disposal Group Two Logistics (N4) Facility and Logistic Infrastructure 1.Camp configuration to support consolidated footprint while recognizing OPSEC and ECU configuration a. ESU will provide alternate layout recommendation 2. Personnel Identification, to include numbers. a. Solidify personnel count IOT contract and request via Camp Lajeune services and This drives messing support and to identify any additional camp infrastructure needs 3. Internal Comms a.Working with N6 to identify acceptable hand-helds to support dispatch and physical security 4. Supplies identification a. Require comprehensive list from N codes to identify administrative supplies for BA. 17

US Fleet Forces Explosive Ordnance Disposal Group Two Communications (N6) N6 COMMUNICATIONS: Topic: Communications Requirements for Stability Operations Discussion: Discussion of the communications requirements needed for the CTF revolved around workspaces in the tent and did not provide what was needed to appropriately task subordinate units under the NEF on what communications they will be required to communicate on or over. Recommendation: Clearly identify systems that are needed to C2 units. This includes radio assets, NIPR/SIPR/CTX (if needed), COP applications (C2PC, AFATDS, etc…). This needs to be clearly identified between N3 and N6. 18

US Fleet Forces Explosive Ordnance Disposal Group Two Medical (N9) Topic 1.Talking point – Recompression chamber 2.Talking point – Ambulance 3.Talking point – SIPER access 4.Identify problems and speak to solutions; a.some areas areas of interest, i. personnel, logistics, space set-up, & plans for next tocex Recommendation 1.Action required 2.Action required 19