Proposed Significant Additions and Changes for the 2010 CLRP Public Comment Release April 15, 2010 National Capital Region Transportation Planning Board.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion Board Retreat February 7, 2012.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 An Overview of the Regions Financially Constrained Long-Range Transportation Plan John Swanson, Principal Transportation Planner September 20, 2011 Fairfax.
1 Item 11, Presentation to the TPB, September 15, 2010.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Titusville to Edgewater Bike Loop PD&E Study
THE 2012 FINANCIALLY CONSTRAINED LONG-RANGE TRANSPORTATION PLAN (CLRP) AND THE FY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Transportation Planning.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Significant Additions and Changes to the 2013 Update to the CLRP Item #11 January 23, 2013.
Significant Additions and Changes to the 2014 Update to the CLRP Access for All Advisory Committee July 24, 2014.
1 Overview of the CLRP The Financially Constrained Long-Range Transportation Plan TPB Citizens Advisory Committee March 10, 2005.
CITY OF LEANDER June 10, 2013 Williamson County Bond Projects Requests.
THE 2014 FINANCIALLY CONSTRAINED LONG-RANGE TRANSPORTATION PLAN (CLRP) AND THE FY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Public Forum – July.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
LMC, Bethesda Maps 01/21/ LMC, Bethesda Maps 01/21/ Lockheed Martin Headquarters 6801 Democracy Center 6901 ROCK SPRING DR OLD GEORGETOWN.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
County of Fairfax, Virginia Department of Transportation 1 January 2015 Service Change Route 929 – Centreville Rd Buses will serve Park Center Drive and.
1 The 2010 Financially Constrained Long-Range Transportation Plan And FY Transportation Improvement Program TPB Technical Committee November.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
1 Regional Priority Bus Projects List Steve Yaffe, Arlington County December 17, 2008 TPB Regional Bus Subcommittee Presented to the Transportation Planning.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
1 Draft Regional Priority Projects List Steve Yaffe, Arlington County November 20, 2008 TPB Regional Bus Subcommittee Presented to the TPB Access For All.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Transportation leadership you can trust. prepared for National Capital Region Transportation Planning Board presented by Arlee Reno, Cambridge Systematics.
1 Michael Eichler Department of Transportation Planning Presentation to the TPB Technical Committee January 8, 2009 CLRP Aspirations Scenario Preliminary.
1 Briefing on the Round 8.0 Cooperative Forecasts Robert E. Griffiths Technical Services Director Department of Transportation Planning TPB Technical Committee.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Scenario Study Task Force September 17, 2008 Progress.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
Proposed Significant Additions and Changes for the 2010 CLRP As Approved by the TPB on May 19, 2010 National Capital Region Transportation Planning Board.
Regional Priority Bus Transit Conference June 24, 2009.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
What is Transportation Outlook 2035? Long-range transportation plan for the Baltimore region Updated every 4 years Includes major capital projects from.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
The Main Street Bike Lane Project LADOT Bike Program.
Transportation/Land-Use Connections Program FY 2014 Project Recommendations July 17, 2013 Sarah Crawford Department of Transportation Planning.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
1 What If… The Washington Region Grew Differently? Results to Date of The TPB Regional Mobility and Accessibility Study February 8, 2006.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
County of Fairfax, Virginia Transportation Priorities Plan Future Updates 1 Ray Johnson and Tom Biesiadny Fairfax County Department of Transportation Board.
September 19, 2012 Transportation Planning Board 2012 Activity Center Update Sophie Mintier, COG/DCPS Staff.
1 Briefing on the Round 8.0 Cooperative Forecasts Paul DesJardin Department of Community Planning and Services COG Board of Directors Meeting November.
The Regional Big Picture Preparing to Conduct Outreach For the 2010 Constrained Long-Range Plan Presentation to the TPB Access for All Advisory Committee.
COG/TPB Transportation Analysis Zone (TAZ) Update Project Robert E. Griffiths Presentation to the TPB Scenario Study Task Force April 16, 2008.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
County of Fairfax, Virginia Policy on Level of Service in Activity Centers Board Transportation Committee December 17, 2013 Department of Transportation.
CPPJ Meeting January 27, 2014 Project Team. Lake Charles MPO - Calcasieu Parish Chapters: 1.Introduction and Transportation Planning Process 2.Regional.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
ROUND 9.0 COOPERATIVE FORECASTS OF FUTURE GROWTH Paul DesJardin COG Director of Community Planning and Services COG Board of Directors March 9, 2016 Agenda.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Local Government Roundtable Session Arlington, Virginia
Interstate 15 North Phase 4
DATA Transportation 101 Project Status March 20, 2002
Col. Pike Multimodal: About the Project
Responsibilities and FUNDING
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Presentation transcript:

Proposed Significant Additions and Changes for the 2010 CLRP Public Comment Release April 15, 2010 National Capital Region Transportation Planning Board Financially Constrained Long-Range Transportation Plan

2 Significant Additions to the 2010 Update to the CLRP 1.DC Streetcar Project 2.Bike Lane Pilot Project 3.St. Elizabeth’s Campus Access Improvements 4.Glover Park Street-scaping/ Wisconsin Ave. Reconfiguration

3 Add three segments of DC’s planned Streetcar network. The streetcars will operate in mixed traffic and will run every 10 minutes. 1.DC Streetcar Project a)Martin Luther King, Jr. Ave. SE Howard Rd. to Good Hope Rd. (0.5 miles, Complete 2012) b)H Street/Benning Road NE Union Station to Oklahoma Ave. (2 miles, Complete 2012) c)Benning Road NE Oklahoma Ave. to 45th St./ Benning Road Metro Station (1.8 miles, Complete 2015) Length:4.5 miles Complete:2015 Cost:$183.8 million (Capital) $4.8 million per year (Operating) Source:General obligation bonds, FTA/Urban Circulator Program Capital Grant

4 2.Bike Lane Pilot Project Add barrier-protected bike lanes on five streets. One or more traffic lanes will be removed to make room for the bike lanes: a)9th St. NW Constitution Ave. to K St. (0.7 mile) b)15th St. NW Constitution Ave. to W St. (2 miles) c)L St. NW 11th St. to 25th St. (1.3 miles) d)M St. NW 15th St. to 29th St. (1 mile) e)Pennsylvania Ave. NW 3rd St. to 14th St. (1 mile) Length:6 miles, total Complete:2010 Cost:$1.2 million Source:Local funding Pilot project – not tested for conformity

5 3.St. Elizabeth’s Campus Access Improvements Proposed improvements to accommodate increased traffic expected when DHS moves to St. Elizabeth’s Hospital campus: a)Reconfigure I-295/Malcolm X Ave. SE Interchange b)Construct a new 3-lane access road to the West Campus, parallel to I-295 from Firth Sterling Ave. to Malcolm X Ave. c)Reconstruct Martin Luther King, Jr. Ave. SE from Pomoroy Rd. to Milwaukee Pl. to add a 5th lane d)Construct a 2-lane extension of 13th Street SE from Congress Heights Metro Station to Pecan St. e)Reconstruct and reconfigure Pecan and Sycamore Streets to accommodate bus/transit Complete:2016 Cost:$158.2 million Source:Federal funding

6 4.Glover Park Streetscaping/Wisconsin Ave. Reconfiguration Wisconsin Ave. NW 34 th St. to Garfield St. Reconfigure from 6 lanes to 4 lanes with a continuous center left-turn lane. Reduce congestion/confusion associated with multiple left turn movements Traffic calming and pedestrian safety Streetscaping Complete:2011 Cost:$4.7 million Source:General obligation bonds

7 Significant Changes, Delays and Deletions Projects delayed 10 years or more: MD 4, construct interchange at Westphalia Rd MD 201 Kenilworth Ave., widen from Rittenhouse Rd. to Pontiac St MD 2/4, construct 3 lanes from MD 765 to MD 2/4 at Lusby (Calvert County) Maryland Projects removed from the CLRP: I-95/495 interchange at Greenbelt Metro US 29 Columbia Pike, upgrade from Sligo Creek Pkwy to Howard Co line US 301, upgrade and widen from north of Mount Oak Road to US 50 Middlebrook Road, widen to 6 lanes from MD 355 to M-83 M-83 (Mid-County Hwy Ext), construct 4/6 lanes from MD 27 to Montgomery Village Ave Father Hurley Blvd, construct 4 lanes from Wisteria to Germantown Rd.

8 Significant Changes, Delays and Deletions VA 411, Tri-County Parkway Construct 4 lanes from VA 234 at I-66 to US 50MD 4, construct interchange at Westphalia Rd. The limits of this project were previously defined from VA 234 to the Loudoun County line. VDOT is proposing to extend the project from the Loudoun County line to US 50. Length: 4 miles Complete:2035 Virginia

9 Significant Changes, Delays and Deletions Projects delayed 10 years or more: US 1, bus right turn lanes from VA 235 N to I VA 7/US 15 Bypass, widen to 6 lanes from VA 7 W to US 15 S US 15 (James Madison Highway), widen to 4 lanes from US 29 to I VA 234 (Manassas Bypass), widen/upgrade to 6 lanes from VA 234 (South of Manassas) to I Tri-County Parkway, construct 4 lanes from I-66 to US VA 7, widen to 8 lanes from Dulles Toll Rd to I VA 7 Bypass, widen/upgrade to 6 lanes from US 15 S to VA 7/US 15 E Virginia Projects removed from the CLRP: I-95, construct interchange at VA 7900 (Franconia-Springfield Pkwy) US 1, widen to 6 lanes from Stafford Co line to Joplin Rd VA 7, widen to 6 lanes from Rt 9 to Market St US 15 (James Madison Hwy), widen to 4 lanes from VA 234 to Loudoun Co line VA 28 (Centreville Road), widen to 6 lanes from NCL Manassas Park to Old Centreville Rd US 50, widen to 8 lanes from I-66 to WCL Fairfax City VA 7100 (Fairfax Co Pkwy), widen to 6 lanes from VA 636 to VA 640 VA 7100 (Fairfax Co Pkwy HOV), construct 2 lanes from VA 640 to VA 7900

10 Public Comment Period April 15 – May 16, 2010 Comment online at TPB scheduled to approve on May 19