Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Construction Contracting
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Haywood County Procurement Process Overview. Prepared by Haywood County Finance Department Julie Davis, Finance Director Donna Woodruff, Purchasing Manager.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Marcy Mealy Procurement Specialist CDBG Program
CIVL202 Construction Engineering I
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
RFP Overview Alan A. Phillips, CPPB CTPM Texas Southern University Summer 2012.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
INTRODUCTION TO PUBLIC PROCUREMENT
Construction Engineering 221 Cost Estimating and Bidding.
Construction Contract Documents
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Key elements to putting together a successful, comprehensive bid RESPONSIBLE & RESPONSIVE BIDDING.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Construction Contracts and Project Delivery Methods
Public Procurement Procedure – Bidding Documents
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Walkthrough February 27 – Mar 3, 2006, Zagreb, ECA.
United Nations Procurement Division
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Specification & Quantities Estimating
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Chapter 2 Introduction to Construction Procedures
CONSTRUCTION CONTRACTS DOCUEMENTS
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Office of Procurement Services.  Vendor Application Website: 
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
Construction Management At Risk Process
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
Content of Tender Dossier - Instructions to Tenderers - Tenders
Award Management Services
Estimating Project Costs
Bidding Requirements Review Questions.
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
Request for Proposal & Proposal
Business Practices.
Manajemen Konstruksi Bidding & Award
United Nations Procurement Division
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Bidding Requirements ACT 380

Objective Provide an overview of the bidding process, including documents included in the bidding requirements

Major Topics O The Bidding Process O Bidding Documents O Types of Bids O Bid Security O Bidder Qualification Data O Invitation to Bid O Instructions to Bidders O Elements of a Bid Form O Information Available to Bidders O Preliminary Schedules

The Bidding Process (TBP) O A basic principle of the process is that all bidders receive identical consideration and bid on an identical basis O Owner –”Who will do this work for the least cost?” O Contractor – “I will do the work for $xxxxx” O See pg 6.11; Section 6.4 covers Bidding

(TBP) Bids vary because: O Product costs vary among different suppliers O Labor costs & time estimates vary O Prices vary from the subcontractors O Labor rates vary with skill & experience O Overhead costs vary with composition of work force O Profit varies with bidder & other work available

(TBP) Subcontractor Bids O The subdivision of work will be accomplished by subcontractors which will submit their bids to the prime bidder O The prime bidder will select the subcontractors on a competitive basis

(TBP) Plan Rooms O Sets of documents for use by suppliers or subcontractors should be available in sufficient numbers and centrally located O Often these documents are available at the A/E office

(TBP) Submission of Bids O Time & date are set when the bids are invited O Bids are typically delivered in a sealed envelope to the A/E’s or owner’s office O Sometimes public project owner’s supply self-addressed, identical opaque envelopes that MUST be used for submitting the bid

(TBP) Time Limit for Bidding O The scope & complexity of the project influence the length of time given for preparing bids O A simple project may only allow 2 weeks O Other factors: O Time needed to collect subcontractor bids O Urgency dictated by owner O Time for settlement of questions & discrepancies

(TBP) Time for Acceptance O Bidder should be allowed to withdraw a bid before deadline to receive all bids – if after his/her bid is accepted then only if the owner consents may they withdraw the bid

(TBP) Bid Depository O Several states use this on publicly funded projects – may be voluntary or mandatory O Developed to improve the quality of bids & to reduce potential unethical bidding practices O Significant units of work bid by subcontractors are deposited and either compared to the bids submitted by the contractor bids or “deposited” for these contractors to use as a reference

Bidding Documents (BD) O These documents provide the necessary information that enable bidders to comply, understand, and follow stipulated requirements of the project O Bid solicitation O Instructions to bidders O Information available to bidders O Bid forms & supplements O Addenda O Contract forms O Conditions of the contract O Specifications O Contract drawings

(BD) Cross-Reference of Requirements O Basic principle of stating things only ONCE in construction documents applies here as well O e.g., Bid Security is referred to in the Bid Solicitation, but detailed requirements are found in Instructions to Bidders & Supplementary Instructions to Bidders O Correct way to document is “as indicated in the [location of primary reference]”

Types of Bids O Stipulated Sum – usually requested on architectural type of projects O Cost-Plus Fee O Guaranteed Maximum Price O Unit Price – usually used for civil type projects O Combined Bid – work divided into phases

Bid Security (BSec) O This guarantees if a bid is accepted, the bidder will enter into a formal agreement w/ the owner (typically days from opening of bids) O Selected bidder will furnish required construction performance & payment bonds – once done, they receive security back and are now considered the CONTRACTOR O Purpose of the security is to compensate the owner for damages incurred if selected bidder doesn’t accept contract award O If selected bidder accepts award, unsuccessful bidders receive their security back

BSec O Details should address: O Required amount of security (stipulated sum or %) O Form of security (cash, certified check, money order, bid bond) O Length of time security will be retained O Description of conditions under which security will be returned to unsuccessful bidders O Description of conditions under which bid security will be forfeited

Bidder’s Qualifications O Owners may require bidders to provide information related to their physical & financial ability to do the work O AIA Document A305 (Contractor’s Qualification Statement) may be used O Qualification information is CONFIDENTIAL

Bid Solicitation O Invitation to Bid – contain only pertinent data that will help bidders decide if they are qualified to submit a bid O See sample on page 5.8; fig 5.2-A O For public projects --- published as a legal notice in designated publications or newspapers O In private work the owner may send to a select few qualified bidders

Basic Information of Bid Invitation/Advertisement O Project Identification O Description of Work O Type of Bid O Time of Completion O Bid Opening O Examination and Procurement of Documents O Bid Security O Bidder’s Qualifications O Owner’s Right to Reject Bids O Laws & Regulations – nondiscrimination in employment/wages laws

Instruction to Bidders (ItB) O Provide more detail than the Invitation to Bid O Basic information includes: O Documents – where available, cost, return policy O Examination of Documents, Site & Local Conditions O Interpretations During Bidding –who to send inquiries to; how replies will be provided (formatted as Addenda); time limits

ItB O Substitutions of Products – list acceptable products or manufacturers O Type of Bid O Preparation of Bid – forms to use & the number of copies; required signatures O Bid Security Information O Performance & Payment Bond—in public projects it is typical that each are equal to 100 % of the contract sum

ItB O Subcontractor Listing O Identification & Submittal of Bid O Modification or Withdrawal of Bid O Disqualification of Bidders O Applicable Laws – list federal, state, & local O Licensing of contractors for special requirements O Permits for special construction O Exemption from sales tax, if applicable O Local labor agreements

ItB O Pre-bid Meeting – location, time, who can attend, if attendance is mandatory O Liquidated damages O Opening of Bids O Evaluation & Consideration of Bids – owner’s right to reject all bids O Execution of Contract

Bid Form (BF) O Prepared by bidder & submitted to the owner O Blank spaces are filled in by the bidder & he/she signs (if corporation—their seal included) O Bid form is bound into the project manual O See figure 5.2-C on pg 5.14 Note: this example does not include everything that could be included in a Bid Form

Elements of a Bid Form (EBF) O Project identification O Name/Address of party to whom bid is directed O Entity submitting bid O Acknowledgements –owner has right to reject bids; bidder will enter into agreement if accepted; bidder examined site & is familiar with laws

EBF O Amount of time for the bids to be held open O Identification of addenda O Prices O Alternatives O Allowances – cash & quantity O Combined bids O Completion date O Liquidated damages O Supplements (Attachments) non-collusion affidavit O Closing

Information Available to Bidders O When provided…not part of the contract documents O Often includes information related to subsurface, geotechnical reports, hazardous material reports, descriptions of the site or existing buildings, and property survey information

Preliminary Schedules O When provided, is included as advisory data only O Not part of the contract documents O Does not replace requirements for submission of a final schedule by the contractor