CERN-GREECE INDUSTRY DAY 31/03/2014 – NCSR “Demokritos” Athens A. Dallocchio – Engineering Department.

Slides:



Advertisements
Similar presentations
JE&GR COMPANY DEFENSE PROGRAM PRESENTATION by Primož Jelševar, project manager.
Advertisements

CETEC SENAI Mission: Technological Solutions for the Industry Challenges Total area (m 2 ): Built area (m 2 ): Technical depts.:11 Laboratories:54.
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
X Meeting of the Future Linear Colliders Spanish Network10-Feb-2014 Enrique Calvo Alamillo.
ORT-E A turn-key Engineering Based Manufacturer and systems integrator. Oak Ridge Tool Engineering, Inc. Oak Ridge Tool Engineering, Inc. Engineering Systems.
Process and Product Engineering Markets: Liquid Food Industry Pharma and Medical Industry Scientific Research Aerospace Industry CATI-A Design Pro/E Design.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
Scana Materials Technology Centre. Established January 2007 as an independent company Based on the former laboratory of Scana Steel Stavanger Located.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Selection Criteria Properties Availability Cost Manufacturability
FNAL Target Related Capabilities PASI 2013 Working Group 1 P. Hurh (FNAL)
PRESENTED BY ILAMVAZHUTHI.C 1 Under the guidance of Mr.S.CHOKALINGAM M.E (Assistant professor) DEPARTMENT OF MECHANICAL ENGINEERING E.G.S.PILLAY ENGINEERING.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Selection Criteria Properties Availability Cost Manufacturability
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Welcome to CERN C. Paris University of Oxford / CERN Mechanical Groups Meeting 4th May 2010.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Catia Forum CAEC in short Organization Current composition of CAEC Sub-committees and Working groups CAEC in short Organization Current composition.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Doing business with CERN Anders Unnervik Ankara 5 October 2015.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Medical Device R&D / manufacturing in Mexico for worldwide markets Summary of Technical Capabilities ZIPTEK MEXICO SA DE CV.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
13 Nov Dimitris LOUKAS Name of the Institution : NCSR Demokritos Contact person: Dimitris LOUKAS
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
Technology Department CERN-GREECE INDUSTRY DAY Monday, 31 March 2014 TECHNOLOGY DEPARTENT 2 In the frame of the Accelerators & Technology Sector at CERN,
The company was founded in The main profile of our business is precision machining of metals and plastics and so the CNC turning, CNC milling, grinding.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Introduction.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
Doing business with CERN Anders Unnervik 20 May 2014.
Magnets Attilio Milanese Doing Business with CERN
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
The Outline of this presentation will be:
MMT Retreat Technical Services across ESS Peter Rådahl
Company Overview Founded in 1967 by George Moxlow Current ownership 100% by David & Renee Moxlow David has 50 years with the company - 34 years as president.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
I. Bergevoet - Training preparation
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
BRIEF CLIENTE | PROJECTO.
VENTILATION OF AD TARGET Kick off meeting
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Status of the Front End Test Stand April 2007.
MECHANICAL ENGINEERING OF ACCELERATOR COMPONENTS
Superconducting RF Crab Cavities
Maintenance at ALBA facility: Strategy for the conventional services
Company Overview Founded in 1967 by George S. Moxlow
HIE-ISOLDE contribution packages
STAP Central Technical Services: Manufacturing
Challenges and Deadlines for Production
Prepared For: Presented By: Date:
East Hall under construction
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

CERN-GREECE INDUSTRY DAY 31/03/2014 – NCSR “Demokritos” Athens A. Dallocchio – Engineering Department

Engineering Dept. Structure A. Dallocchio - 31/03/2014 Infrastructures Engineering Coordination Production

EN-MME: Mechanical & Materials Engineering Group A. Dallocchio - 31/03/2014 Engineering & Design Production Materials & Metrology  Design Office:  40 designers and engineers  CATIA / SmarTeam, ANSYS, LS-Dyna...  Experimental Mechanics Lab.  Mechanical workshop (4000 m 2 ):  50 technicians and engineers  CNC machining  Assembly & metal forming  Welding (TIG, MIG, electron beam, laser, vacuum brazing)  Technical Subcontracting Service  Material science consultancy:  metallurgical analyses, microscopy, mechanical tests  NDT: US, radiography, tomography  Metrology: 350 m 2 lab. equipped with CMM.

EN-MME Mandate: A. Dallocchio - 31/03/2014 Particle Beam Impact : comparison between simulation and experiment Beam The mandate of the MME group is to provide to the CERN community specific engineering solutions combining mechanical design, production facilities and material sciences. This group owns, maintains and develops the 30 years old know-how on the mechanical construction of beam accelerators and physics detectors.

Superconducting Magnets A. Dallocchio - 31/03/2014

Superconducting RF Cavities A. Dallocchio - 31/03/2014

Beam Lines A. Dallocchio - 31/03/2014

Warm RF Cavities A. Dallocchio - 31/03/2014

Vacuum Chambers CIRCA 2 mt. A. Dallocchio - 31/03/2014

MME Subcontracting Service: ~1000 contracts/year in close collaboration with FP Dept.

MME Subcontracting Service: what kind of company are we looking for? SectorMain productsAvailable tecnology UHV-XHV (Vacuum) Vacuum chamber; Flanges TIG welding; EB welding; Vacuum Brazing UHV-XHV (Vacuum) Bellows;TIG welding; EB welding; General machiningFrame (construction steel, stainless steel and aluminium) Welding (at least 3 meter long) Milling Painting Precision machining (+/- 0.02) Machined parts (construction steel, stainless steel and aluminium; Cu alloys) Milling, turning, grinding (500x500x500mm) Sheet metal formingCutting (laser, water, plasma) Welding Bending CeramicAluminium Oxide Zirconium Oxide Silicon Carbide Silicon Nitride Machining Surface treatment MachiningExotic materials (tantalum, tungsten,molybdenum, carbon) Milling, turning, grinding A. Dallocchio - 31/03/2014

Thank you for your attention

MME Workshop A. Dallocchio - 31/03/2014

CONTACT PROBE MACHINE Ferranti Olivetti Leitz Infinity OPTICAL PROBE MACHINE Wegu Mahr PORTABLE 3D MEASURING ARM Romer ROUGHNESS – TOPOGRAPHY – PROFILE MITUTOYO SJ 301 (Portable) MITUTOYO FORMTRACER SV-C3100 H4 NON-CONTACT INTERFEROMETRY VEECO NT 3300 OTHER MEASURES Linear measurements, straightness, flatness, squareness, … PROFILE PROJECTOR BATY R770 MME Metrology A. Dallocchio - 31/03/2014

Scanning Electron Microscopy LEICA STEREOSCAN 360 LEO (Zeiss) 430 Optical Microscopy LEICA Q600 (Quantimet) Image Processing LEICA MZ 16 Stereomicroscope Mechanical Testing UTS 200, Tensile Testing at room temp. UTS 200, Tensile Testing at 1.9 K. Macro Hardness testing Micro hardness testing Siemens D-5000 X-RayDiffractometer Non-destructive Testing Ultrasonic Test (USIP) USN60 USOUND (immersion) Radiography Ultrasonic swinger device MME Metallurgy A. Dallocchio - 31/03/2014

CERN Procurement Guidelines Requests up to 1 kCHF 1 bid by Technical Officer Purchase Requisition (DAI) Requests between 1 and 5 kCHF 1 written bid by Technical Officer Purchase Requisition (DAI) Validated by Procurement Officer Requests between 5 and 10 kCHF Price enquiry by Technical Officer or Procurement Officer Minimum of 3 bids requested Purchase Requisition (DAI) made to the lowest compliant bidderPurchase Requisition (DAI) Requests between 10 and 50 kCHF Technical specification provided by Technical Officer Price enquiry made by Procurement Officer 3 to 5 bids requested Purchase Requisition (DAI) made to the lowest compliant bidderPurchase Requisition (DAI) Requests between 50 and 200 kCHF Departmental Request Price enquiry by Procurement Officer 3 to 5 bids requested Purchase Requisition (DAI) made to the lowest compliant bidderPurchase Requisition (DAI) Requests between 200 and 750 kCHF Departmental Request Market Survey followed by Invitation to Tender Requests above 750 kCHF Departmental Request Market Survey followed by Invitation to Tender Finance Committee approval A. Dallocchio - 31/03/2014

EN- CV: Cooling & Ventilation Hydraulic Systems: Water cooling: particle accelerators, experimental facilities, calculation centers, labs… Water distribution & special firefight water line Air cooling and air conditioning systems: CERN-wide including underground installation. Pneumatic distribution lines.

EN-CV Water consumption equivalent to a city of 45’000 people 10% consumption of the Canton de GENEVE Water consumption equivalent to a city of 45’000 people 10% consumption of the Canton de GENEVE 22Cooling Towers (450 MW) 35Cold Water station 6-12 o C (73 MW) 150Cooling station (water, demineralized water, C 3 F 8, C 6 F 14 ) 800 kmPiping 5'400 m 3 /hWater distribution

EN-EL : Electrical power distribution Year Consumption1.2 TWh P max200 MW

EN-EL : on-going projects 3 Ottobre 2013F. Bertinelli - CERN Dipartimento Engineering SPS cables upgrade Potenza 3.3/18/66 kV Controlli  90 km divided in 7 km sectors 20

EL : progetti futuri 3 Ottobre 2013F. Bertinelli - CERN Dipartimento Engineering Consolidation of the protection system for the 66 kV distribution 21

EN-HE : trasport & handling Management of the complete logistic for transport & handling CERN- wide Design, purchase, operation and maintenance of all transport & handling machines. 3 Ottobre 2013F. Bertinelli - CERN Dipartimento Engineering 22

HE : industrial vehicles  30 elevators (diesel) +150 electrical elevators  100 platforms  1000 manual handling machines  60 trucks for special transport  180 electrical trolleys TOTAL : 1500 machines (Value 25 M€)