2009 ENERGY BUYERS’ CONFERENCE: Guam Power Authority John J. Cruz, Jr. P.E. Oct. 25-27, 2009.

Slides:



Advertisements
Similar presentations
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
Advertisements

First Solar FuelSmart™: Powering Energy Security
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
CHANGES IN ELECTRIC GENERATION Generation vs. Demand: Demand growing 3% per year New Generation more difficult to build.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Guam Power Authority Presentation to the Pacific Power Association 14th Annual Conference & Trade Exhibition August 26, 2005 From Independent Power Producers.
GPA Renewable Energy Resource for Guam Power Authority
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
U.S. Energy Information Administration Independent Statistics & Analysis Annual Energy Outlook 2014 Early Release Reference Case AEO2014 Early.
GPA/GWA FINAL EIS 1 Presentation to the Guam Legislature On the DOD FEIS and Discussions to date August 23, 2010.
Floyd Shiroma, Director Fuels Infrastructure Division HAWAIIAN ELECTRIC COMPANY.
Content of the Presentation
SMALL SCALE LNG PROSPECTS
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Northeast and Mid-Atlantic States Regional Low Carbon Fuel Standard Newark Stakeholder Meeting October 27, 2009 Transportation Fuels Panel Liquid Fuels.
September 24, 2003Forester’s Co-Op Introduction and Overview of Washington Ridge Youth Conservation Camp Project - 3 year MOU & Team Building Biomass Fueled.
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
Understanding Ontario’s Electricity System
Resource and Energy.
Utility Rates Electric, Natural Gas, and Water. Electric Utility Different Utility Business Models – “IOU” – Investor Owned Utility Ultimately responsible.
EE 369 POWER SYSTEM ANALYSIS
POWER GENERATION TECHNOLOGIES
Electricity Supply in Alaska Frank Abegg, PE Fairbanks, Alaska April 2006 Frank Abegg, PE Fairbanks, Alaska April 2006.
Engineering Technology Division
LNG Technology.
California Transportation Fuel Trends in Historical Demand Joint Lead Commissioner Workshop on Transportation Energy Demand Forecasts June 24, 2015 Gordon.
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
Journées "Ports & Environnement” Clean Energy Management in Ports EFFORTS results Le Havre – March 10th, 2010.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
 400 new jobs  300% >90% ROI Greener  40MW SSE Ireland Better Energy Supply 600,000 gas and electricity customers Sustainability Making energy better.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
TRANSPORTATION MANAGEMENT
1 Emerging Renewables Program Solar Conference North State Renewable Energy Chico, CA March 10, 2005 BILL BLACKBURN Lead, Emerging Renewables Program California.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Endend /01 PPT10/03/99 Diesel business. endend What can the Diesel Business offer? Individual diesel engine packages up to 15 MW or Total diesel.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
WINTER PREPAREDNESS PLAN ALLIANT GAS. Alliant Gas is the propane gas company that operates as a regulated utility in the towns of Payson and.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
U.S. Energy Information Administration Independent Statistics & Analysis Natural Gas Markets: Recent Changes and Key Drivers for LDC Gas Forum.
Renewables and System Services Ann Scully.
Introduction Transportation is necessary to:
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
November 20, 2015 Challenges of Storage Development - Advanced Rail Energy Storage (ARES) Prepared for Bulk Storage Conference, Sacramento November 20,
1 Where Does Electricity Come From?. 2 Overview of Electricity.
Port Authority of Guam PB International PORT EXPANSION PLAN.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Giorgio Szegö Bucharest 27 th May, 2005 The Challenge of Electricity Storage.
Argentine Power Market Fuel Oil Use & Opportunities for the Future Central Puerto S.A. Fuel Oil / Energy Buyer’s Conference Miami, September 2000.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
A+ for Energy® Energy Educator Training Conferences Sponsored by BP, Presented in Partnership with The NEED Project and NREL The California Energy Story.
CCU Update integrated resource plan May 17, 2016
The Authority’s Response
SECRET.
Energy day July 3th, 2012.
Economic Operation of Power Systems
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
Closing the Biomass Power Cost-Price Gap
Presentation transcript:

2009 ENERGY BUYERS’ CONFERENCE: Guam Power Authority John J. Cruz, Jr. P.E. Oct , 2009

Presenter JOHN CRUZ, JR., P.E. Manager of Strategic Planning & Operations Research Division Seven years at Hughes Aircraft Company  Radar System Engineer, Modes Leader B2 Program Began GPA career in 1991, with projects such as Long Range Transmission Planning and Integrated Resource Planning, IT Infrastructure, Power System Engineering Studies and SCADA/EMS1 BS Electrical Engineering, Gonzaga University Mathematics (BA); Business Minor Registered Professional Electrical (#1180, Guam) Guam Community College (Adjunct Faculty, Electronics)

Guam Largest, southernmost island of the Mariana archipelago Composed of volcanic material and limestone base seabed material from coral deposits 1,500 NM southeast of Tokyo 1,500 NM east of Manila 3,700 NM west-southwest of Honolulu 6,000 NM west of San Francisco Tropical Marine climate generally warm and humid with two seasons: Dry (December to June) and Rainy (July to November) Average rainfall inches

Guam Power Authority (GPA) Established in 1968, a public corporation and an enterprise fund of the Government of Guam.  Administered by the Consolidated Commission on Utilities  Regulated by the Guam Public Utilities Provides electrical power service throughout entire island  Supports Guam Waterworks Authority through operation and maintenance of 18 MW emergency generators for water and sewage pump stations

553 MW Installed Capacity System Peak (272/281.5) 29 Substations 663 miles of transmission and distribution lines $840 million assets $308 million 2007 Revenues Labor = 10% of Total Revenues Guam Power Authority (GPA)

Organizational Chart

Generation Sourcing MW Installed Capacity IPP – Independent Power Producers PMC – Performance Management Contractor

Generation Mix MW Installed Capacity MW peak 96% Reserve Margin

Generation Mix BASELOAD UNITS

Cabras 1&2 Power Plant Steam Turbine, 2 Units Nameplate Capacity: 66 MW each Location: Cabras-Piti Area, South-central Guam Primary Fuel : RFO Installed in 1974/1975 PMC

Cabras 3&4 Power Plant Slow-speed Diesel, 2 Units Nameplate Capacity: 39.3 MW each Location: Cabras-Piti Area, South-central Guam Primary Fuel : RFO Installed in 1995/1996 Commissioned in 1999 Currently handled by PMC PMC

MEC Power Plant Slow-speed Diesel, 2 Units Nameplate Capacity: 44.2 MW each Location: Cabras-Piti Area, South-central Guam Primary Fuel : RFO IPP Commissioned in 1999

Steam Turbine, 2 Units Nameplate Capacity: 26.5 MW each Location: Cabras-Piti Area, South-central Guam Primary Fuel : RFO Installed in 1971/1973Commissioned in 1999 IPP – Energy Conversion Agreement for Refurbishment Tanguisson Power Plant

Generation Mix CTs and Fast-Track Diesels UNITEquipment TypeMaximum Gross Capacity (MW)Fuel Oil Type TEMESCombustion Turbine40.0HSFO/LSFO Dededo CT 1Combustion Turbine23.0HSFO/LSFO Dededo CT 2Combustion Turbine22.0HSFO/LSFO Macheche CTCombustion Turbine22.0Diesel Yigo CTCombustion Turbine22.0Diesel Marbo CTCombustion Turbine16.0Diesel Tenjo Vista Unit 1Fast-Track Diesel4.4Diesel Tenjo Vista Unit 2Fast-Track Diesel4.4Diesel Tenjo Vista Unit 3Fast-Track Diesel4.4Diesel Tenjo Vista Unit 4Fast-Track Diesel4.4Diesel Tenjo Vista Unit 5Fast-Track Diesel4.4Diesel Tenjo Vista Unit 6Fast-Track Diesel4.4Diesel Manenggon Unit 1Fast-Track Diesel5.3Diesel Manenggon Unit 2Fast-Track Diesel5.3Diesel Talofofo Unit 1Fast-Track Diesel4.4Diesel Talofofo Unit 2Fast-Track Diesel4.4Diesel Dededo Diesel Unit 1Fast-Track Diesel2.5Diesel Dededo Diesel Unit 2Fast-Track Diesel2.5Diesel Dededo Diesel Unit 3Fast-Track Diesel2.5Diesel

TEMES Power Plant Combustion Turbine Unit Nameplate Capacity: 40 MW Location: Cabras-Piti Area, South-central Guam Primary Fuel : Diesel Fuel Oil Installed in 1998 IPP

Fast-Track Diesel Plants Plants located in Southern Guam, Utilized mainly as Peak-load Units Tenjo Vista Power Plant – 26.4 MW capacity  Fuel Delivered via Pipeline  Plant is located beside Shell Guam, Inc. Fuel Facility Talofofo Plant – 8.8 MW  Fuel delivered via tanker truck (as needed) Manenggon Plant – 10.6 MW  Fuel delivered via tanker truck (as needed) PRIMARY FUEL : DIESEL  Tenjo Vista – 0.3% Sulfur requirement  All other plants – 0.5% Sulfur requirement

TENJO POWER PLANT TALOFOFO POWER PLANT MANENGGON POWER PLANT

Combustion Turbine Plants Plants located in Northern Guam, utilized mainly as Peak-load Units Dededo CT #1 Plant – 23 MW capacity Dededo CT#2 Plant – 22 MW capacity Yigo CT, Macheche CT Plants – 22 MW each Marbo CT Plant – 16 MW Fuel delivered via tanker truck (as needed) PRIMARY FUEL : Diesel Fuel Oil, 0.5% Sulfur

DEDEDO CT 1 & 2 YIGO CT POWER PLANT MACHECHE CT POWER PLANT

Baseload Plants Fast-Track Diesel Units CT Units

Energy Production (Thermal) KWH per Year

Energy Production (Thermal) KWH per Year, per Plant Type

Fuel Consumption in Thousand Barrels

Fuel Delivery RFO No. 6 Consumption estimates:  Approximately 8,000 bbls/day  Approximately 3 Million bbls/year Delivered via ocean freight petro-shipping vessels chartered by off-island supplier  Delivery Cycle = Days  Split-cargo combination of LSFO and HSFO  Total Cargo Quantity (est.) = 240,000 to 300,000 bbls/shipment

Fuel Delivery Ship is accommodated at the F-1 Dock Facility managed and operated by Shell Guam, Inc.  Maximum LOA: 237 meters  Maximum breadth: 45 meters  Maximum vessel draft alongside: 14.8 meters  Maximum displacement: 120,000 tons RFO transported to shoretanks via a 24-inch diameter pipeline (Shell B-Line)  GPA Fuel Farm Facility in Piti  Shell Tank farm Facility in Agat

Fuel Delivery Scheme RFO is transferred from ship to fuel farm via pipeline

RFO is delivered via Shipment every month.  RFO is delivered from Ship to Fuel Farm through the 24-inch pipeline  Third-party certified petroleum testing laboratory tests and inspects shipment RFO is delivered to the different Baseload Plants via Pipeline  12-inch diameter pipeline from Tank 1934 & 1935 to Main Transfer Pump Station (MTPS)  6-inch diameter pipeline from MTPS to Cabras and MEC plants  8-inch diameter pipeline from MTPS to Tanguisson Plant Diesel is delivered via:  Pipeline for the TEMES and TENJO VISTA Plants  Tanker Truck for all other Fast-Track Diesel and CT Plants Fuel Delivery and Issuance

Fuel Storage 30 – 60 days RFO Reserve Fuel Storage Capacity  RFO: 1,125,800 BBLS ( 47,283,672 Gallons)  Diesel: 38,681 BBLS (1,624,729 Gallons) Bulk Storage Ownership  2 Owned by GPA  3 Leased from Shell All Plant Storage Tanks and Diesel Storage Tanks owned by GPA Management Contract for operations of Fuel Bulk Storage Facility

Fuel Storage Facilities Bulk Storage CapacityPumpable Inventory BBLGALBBLGAL RFO BULK STORAGE 1,006,00042,252,000905,40038,026,800 RFO PLANT STORAGE 83,8003,519,60075,4203,167,640 TOTAL RFO INVENTORY CAPACITY 1,089, ,82041,194,440 TOTAL DIESEL INVENTORY CAPACITY 38,6811,624,72930,9451,299,783 HSFO = 680,000 bbls LSFO = 326,000 bbls

GPA’s Fuel Farm Piti Fuel Farm Bulk Storage Tank (Tank 1934 & 1935)

Fuel Specifications -RFO High Sulfur Fuel Oil, 2.00%S Max / Low Sulfur Fuel Oil, 1.19%S Max CharacteristicsLimitsASTM Test Sulfur, Wt%, Max HSFO / LSFO2.00 / 1.19D-4294 Pour Point, Maximum70 ºF or 21 ºCD-97 Flash Point, Minimum150 ºF or 66 ºCD-93 Fire Point, Deg. F., Minimum200ºF or 94ºCD-92 Viscosity, SSU at 100 Deg F., Max./Min.1500 / 600D-445 Sediment by extraction, Wt. % Max.0.50D-473 Water by Distillation, Vol. % Max.0.50D-95 Vanadium Content, PPM, Max.80D-5708 Gross Heating Value, Guaranteed MBTU per barrel5.9D-240 Aluminum Plus Silicon PPM Maximum (Individual results to be reported separately) 80D-5184 Ash Content, Wt. %, Max.0.10D-482 Carbon Residue, Wt. % Conradson,Maximum15D-4530 Gravity, Deg API at 60 Degrees F, Min / Max14.0 / 23.0D-287 Total Sediment – accelerated, % mass, max0.15ISO Compatibility a) Cleanliness Ratio, max2ASTM D-4740 b) Compatibility Ratio, max2

Fuel Specifications - Diesel DIESEL – For Fuel Deliveries to Baseloads, TEMES, CTs, Water Systems Generators and Fast Tracks CharacteristicsSpecification LimitsTest methods GRAVITYAPI at 60 ºF, Min./Max.32-42D-1298 FLASH POINT, PMCC deg. F.140 MIND-93 SULFUR CONTENT, Wt. %0.50 MAXD-129 temp.Clear & brightVISUAL POUR POINT, Deg. F.50 MAXD-97 CETANE Index Number (Calc.)48 MIN.D-976 WATER & SEDIMENTS by centrifuge, Volume % MAXD-1798 CARBON RESIDUE 10% Bottom, Wt. % MAXD-189 CORROSION, Copper Strip, 212 deg. F.ASTM No. 2 MAXD-130 ASH CONTENT, Wt. %,0.005 MAXD-482 NEUTRALIZATION Number, Total Acid Number, mg KOH/gm sample MAXD-974 COLOR, ASTM Color3.0 MAX.D Guaranteed Heating Value, MMBTU/bbl5.9000D-240 Metals, PPMBaird AE

Fuel Specifications - Diesel DIESEL – For Fuel Deliveries to Tenjo Vista Diesel Plant CharacteristicsSpecification LimitsTest methods GRAVITYAPI at 60 ºF, Min./Max.32-42D-1298 FLASH POINT, PMCC deg. F.140 MIND-93 SULFUR CONTENT, Wt. %0.30 MAXD-129 temp.Clear & brightVISUAL POUR POINT, Deg. F.50 MAXD-97 CETANE Index Number (Calc.)48 MIN.D-976 WATER & SEDIMENTS by centrifuge, Volume % MAXD-1798 CARBON RESIDUE 10% Bottom, Wt. % MAXD-189 CORROSION, Copper Strip, 212 deg. F.ASTM No. 2 MAXD-130 ASH CONTENT, Wt. %,0.005 MAXD-482 NEUTRALIZATION Number, Total Acid Number, mg KOH/gm sample MAXD-974 COLOR, ASTM Color3.0 MAX.D Guaranteed Heating Value, MMBTU/bbl5.9000D-240 Metals, PPMBaird AE

GPA has a contract for the Management of the Fuel Bulk Storage Facility (Fuel Farm)  Contractor is responsible for managing the fuel farm, receiving fuel supply, and delivering fuel supply to the different power plants  Third-party certified petroleum testing laboratory tests fuel Bid for the management and operations of the bulk storage facility is in progress  New contract shall include the management of GPA’s fuel pipelines  Focus on reducing inventory losses and maintenance of GPA facilities Fuel Bulk Storage Facility

GPA’s Key Fuel Suppliers Off-island Supplier  Contract with a Singapore-based RFO Supplier  Currently contracted to BP Singapore, PTE Ltd. On-island Suppliers  On-island supplier for Diesel Fuel Oil (0.5% and 0.3% Sulfur)  Current contracted to Shell, Guam Inc.  New Bid in process

Current Supplier: BP Singapore, PTE Ltd. 3 Years (February 01, 2007 to January 01, 2010) w/ 2 Years Extension Option Quantity = Close to 3 Million BBLS per year Pricing = Market + Fixed Premium  Market Price = Average of previous month’s posting Delivery Details (Spot/term, FOB delivered, etc.) RFO Supply Contract

Pricing = Market + Fixed Premium  Market = Average of previous month’s posting New Contracts shall be awarded on December 2009  Supply of 0.5% Sulfur Diesel Fuel Supply except Tenjo  Supply of 0.3% Sulfur Diesel Fuel Supply for Tenjo Vista Power Plant Includes options for:  Various delivery methods (tanker truck, pipeline)  Adopting 500 PPM Diesel Fuel *pending manufacturer’s recommendations on compatibility, specification limits for fuel characteristics Diesel Fuel Oil Supply

GPA’s Integrated Resource Plan Identifies key assumptions specific to future electric needs on Guam  Viable resource and demand side technologies  Load and Fuel forecasts  Environmental Impact and Constraints Uses a licensed resource expansion optimization tool (STRATEGIST) for modeling framework Incorporates a Stakeholder Process

Demand Forecast

Demand Forecast (continued)

Load Forecasts

GPA created an Integrated Resource Plan (IRP) which addresses Fuel Diversification and Renewable Energy Requirements (PL 29-62) by Recommending: Acquisition of renewable resources to offset the high price of fuel, and Conversion of existing plants to use Liquefied Natural Gas as an additional measure to lower impact of petroleum volatility and lower fuel expenses. GPA has initiated the acquisition for renewable resources (Wind, Solar, Hydro, Biomass, Geothermal, OTEC, Wave). Moving Forward

Phase 1 of Renewable Bid in final stages of procurement  Projects > 5MW and up to 40 MW (for Phase I)  Commissioning Period within 36 Months  Commercially viable with min. 1 year of performance data  RFP for Wind Monitoring in progress  Pilot project for 1 MW Wind Turbine in progress Phase 2 of Renewable Bid to be announced by Second Quarter of 2010 Moving Forward

Future Fuel Demand Outlook

Expected increase in demand due to military build-up  Increase in use of Diesel-fired Units  Conversion of Diesel-fired Units to LNG/CNG  Utilization of Renewable Energy Resources such as Wind Power, Geothermal, Solar and others Use of HSFO and LSFO dependent on weather conditions  GPA continuously improves on its operations to maximize efficiency of the units  Improvements on HSFO and LSFO consumption monitoring and forecasting  Research on-going regarding additional fuel storage facilities

Shift to 500 PPM Diesel Fuel Oil (0.05% Sulfur)  Current issue is to determine the impact of using 500 PPM Diesel to each plant equipment Future Fuel Quality Outlook