Sandbagging Techniques

Slides:



Advertisements
Similar presentations
35 FOOT LADDER 3 PERSON.
Advertisements

National Guard Engineering Education. General Levee Information Levees are the most widely used method of flood control The most extensive levee systems.
Introduction This module defines the differences
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
Risk Management Department
Dump Point Safety Prepared by
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
DAMS.
North Idaho Emergency Services Academy. Objectives Types of fire service laddersTypes of fire service ladders Ladder termsLadder terms Ladder raising.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
Concrete
©1994 Quark Management Service 1 Flood Control Procedures.
Ladder Safety Training
Ladders Skill Drills.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
CONSTRUCTING A FIVE CABIN LATRINE
Produce Safety University Take-Home Training for Professional Standards 1 School Gardens.
Through funds made available from a 319 grant focused on water quality issues in the Spring River Watershed, plans for a demonstration Rain Garden were.
Pesticide Spills Prevent…Prepare…React. Consequences of Spills Loss of time and money Loss of time and money –Man hours spent on spill clean up –Disposal.
Railroad Safety For the Fire Investigator and Firefighter.
Intermediate SFFMA Objectives: – Hrs received.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
High Pressure Lifting Bags
Steps for cleaning up a chemical spill
Fall Hazards.
Intro to Concrete 18.0 & 19.0 Class notes.
Graphic Arts Safety Rules
Permit Process.
12 Ladders Skill Drills. 2 Objectives Perform one-, two-, three- and four-FF carries. Perform one-, two-, three- and four-FF raises. Tie the halyard.
Health & Safety Life Book AM ST p. 1 v.01 - Aug.18, 2011 Working at Height Portable Ladders Design Specifications The use of home made ladders.
Preparing Foundations for Cylinders & ASME Tanks
Copyright © Texas Education Agency, All rights reserved. Flexible Manufacturing Basic Safety 1.
Power Tool Safety Guidelines for Construction Trades Students.
By: Rick Ayers Yates County Soil & Water Conservation District
BUILDING STRONG SM Portland District Flood Damage Reduction Making Stormwater Management Systems Reduce Flood Damages D. Leslie Miller, P.E. Flood Preparedness.
DAMS Dept. Of Civil Engineering
Ventilation Skill Drills.
Duncan Flood Event – Lessons Learned Public Safety Department.
SAFETY IN THE LABORATORY 1-Don`t eat, smoke or drink inside the laboratory. 2-Don`t put any thing in your mouth such as pens, fingers…. 3-Don`t take.
Chapter 2: Total Hydrostatic Force on Surfaces
Marshall has a sandbox in the shape of a square prism, as shown below. The height of the sandbox is 10 inches. If Marshall fills the sandbox with sand.
Produce Safety 1 School Gardens. Objectives At the end of this training session, participants will be able to: 1.Identify appropriate practices for site.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
COFFERDAMS.
HYDROLOGY & WATER RESOURCES ENGINEERING TYPES OF SPILLWAYS
Procedure for Pedestrian Operated Mowers (Rotary and Cylinder) (Revision 1 – 23rd November 2010) Toolbox Talk.
Concrete Concrete Cement Sand Gravel Water.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Flood Control Procedures
Foundation – jay Desai.
Substructure Groundworks - Hazards
Board Replacement for Floating Floors
Shop Orientation and Procedures
Flexible Manufacturing
B.V.Patel Institute of Technology-Diploma studies
CASE: SOIL BUNDS IN PAKISTAN
Fall Hazards.
Flood: Build a Stronger Plinth
Lesson Seven: Flood Works Monitoring
Fall Hazards.
Ladders Standard 29 CFR Part
Fall Hazards.
Presentation transcript:

Sandbagging Techniques US Army Corps of Engineers

Kansas City District Participation Sandbag demonstrations and training classes are put on by flood engineers each year at the request of local communities.

A Steadfast Flood Fighting Tool Sandbags are used to: Prevent overtopping of levees Direct a river’s flow Construct ring dikes around boils Weight down saturated levee back slopes Anchor plastic sheeting and straw bales Build buttresses on back slopes and toes of levees

A Steadfast Flood Fighting Tool Sandbags are used to: Prevent overtopping of levees Direct a river’s flow Construct ring dikes around boils Weight down saturated levee back slopes Anchor plastic sheeting and straw bales Build buttresses on back slopes and toes of levees

Sandbag Construction Treated burlap sacks are preferred by Seattle District. 14 inches wide, 24 inches long. Fill two-thirds full (untied). Use tied bags (filled slightly fuller) to hold plastic sheeting or straw bales in place.

Fill Materials Sand is by far the best material for filling and shaping bags. Silt, clay or gravels may be used if necessary. Alternatives: - Straw bales - Concrete Jersey Barriers - Ecology Blocks

Correct Filling Procedures A two- or three-person operation. Use proper lifting techniques. Form a 1-1/2 inch collar and empty a No.2 shovel of material into bag. Use gloves to protect hands and fill bag two-thirds full. Haste makes waste.

Correct Filling Procedures A two- or three-person operation. Use proper lifting techniques. Form a 1-1/2 inch collar and empty a No.2 shovel of material into bag. Use gloves to protect hands and fill bag two-thirds full. Haste makes waste.

Correct Filling Procedures (Cont.) Consider vehicle transportation and access to the flood site when bags are filled at a distant location. Specialized filling equipment is commercially available for large scale operations.

Proper Placement Remove debris from area. Place bags lengthwise and parallel to direction of flow with the open end facing upstream. Fill low spots first and start at the downstream end and 1 foot landward from river.

Proper Placement Remove debris from area. Place bags lengthwise and parallel to direction of flow with the open end facing upstream. Fill low spots first and start at the downstream end and 1 foot landward from river.

Proper Placement (cont.) Fold the open end of the bag under the filled portion. Place succeeding bags tightly against and partially over- lapping the previous one. Offset adjacent rows by one-half bag length. Compact and shape by walking on each bag.

Proper Placement (cont.) Fold the open end of the bag under the filled portion. Place succeeding bags tightly against and partially over- lapping the previous one. Offset adjacent rows by one-half bag length. Compact and shape by walking on each bag.

Single Stack Placement Use single stacked placement where there is no streamflow velocity or danger from floating debris. Generally not recommended to be above three courses or layers. Can be used as a barricade to protect structures.

Pyramid Placement Method Use to increase the height of sandbag protection. Place equal number of rows on the bottom as there are vertical rows. When the water is 1 foot below the top of the levee and predicted to rise 3 more feet, construct a 2-1/2 foot sandbag structure.

Pyramid Placement Method Use to increase the height of sandbag protection. Place equal number of rows on the bottom as there are vertical rows. When the water is 1 foot below the top of the levee and predicted to rise 3 more feet, construct a 2-1/2 foot sandbag structure.

Pyramid Placement Method (Cont.) Use this rule of thumb in determining dimensions of the pyramid: 1 bag in length equals about 1 foot 3 bags in width equal about 2-1/2 feet 3 bags in height equal about 1 foot

Typical Pyramid Sandbag Placement

Ringing Sand Boil Method Water seepage through the levee foundation or embank- ment can create a sand boil. Build ring dikes around a boil only when soil is being transported. There should be a minimum 2- to 3- foot radius from the center of the boil to the inside edge of the ring dike.

Ringing Sand Boil Method (cont.) Do not stop the flow as this will cause the boil to pop up somewhere else. Build an overflow section to allow clear water to exit ring dike. Continue raising ring dike until water runs clean.

Ringing Sand Boil Method (cont.) Do not stop the flow as this will cause the boil to pop up somewhere else. Build an overflow section to allow clear water to exit ring dike. Continue raising ring dike until water runs clean.

Ringing Sand Boils

Safety Tips Tip #1: Use proper lifting techniques. Tip #2: Use work gloves and avoid contact with eyes and mouth. Tip #3: Wear adequate layered clothing and wear boots

Safety Tips Tip #1: Use proper lifting techniques. Tip #2: Use work gloves and avoid contact with eyes and mouth. Tip #3: Wear adequate layered clothing and wear boots

Safety Tips Tip #4: Use caution around heavy equipment operators. Tip #5: Wear with reflective material for night work.

Safety Tips Tip #4: Use caution around heavy equipment operators. Tip #5: Wear with reflective material for night work.

U.S. Army Corps of Engineer Policy The Corps stocks sandbags to supplement state & local supplies Coordinate requests for sandbags with State Emergency Management Office. Locals are responsible for removal and cleanup. Corps flood engineers can provide technical assistance during sandbag operations

Make sure you study the Corps’ latest brochure on proper procedures and tips on sandbag techniques.

For More Information US Army Corps of Engineers For more information on sandbag training see the Corps Sandbag Techniques brochure online at: www.nwk.usace.army.mil/flood2007 US Army Corps of Engineers