Servicing Welch DRYFAST ULTRA Pump Models 2032

Slides:



Advertisements
Similar presentations
350, 350XL 1¼ - 2. Modification Overview Production of the 1¼ began in 2004 and is current. Production of the 1¼ began in 2004 and is current.
Advertisements

J.P. Langston Brake Retrofit
What is a fastener? A device to locate or hold parts
Waukesha Cherry-Burrell
Service Training PV Series 42 PVplus
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Rework Procedure for Wash Motor Pulley Change Model : Rosa & Rosa Plus Part Details & Tools required Sr NoPart DescriptionQtyTool used to replace old artworks.
A Manual for Repair and Maintenance Technicians 1ST STAGE.
Volvo 270 Outdrive R&R (for bellows replacement)
Yamaha oil pump rebuild
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
Calypso / Titan / Octopus 2nd Stage Regulator. Calypso / Titan 2 nd Stage New cosmetics, new cover Large, easy-to-grip venturi lever –Easy to find & access.
MyLock 644D Service Seminar.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
Model 12 Intek Horizontal OHV
What is a fastener? A device to locate or hold parts.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
CHAPTER 32 Disc Brake System.
Model 12 Intek Horizontal OHV Crankcase Disassembly and Assembly Lab #7.
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Small Engine Reassembly Briggs & Stratton OHV
March 19, ” Leg Valve Changeout. Required Tools and Materials 3” Wrench 9/16” Wrench 11/16 Wrench Seal Pick Clean hydraulic fluid.
PARKING BRAKE OPERATION, DIAGNOSIS, AND SERVICE
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
LAB #9 Valve Head replacement. Insert the valve. Make sure that the cap goes on the intake valve. Insert the springs. Insert the keeper.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Model 12 Intek Horizontal OHV
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
009 (M3) ½”-2” 009 (M3) ½”-2”. Modification Overview- 009  009 ¾-1” ( ) (1” ) ¾-1” ( ) (1” ) 1¼ -2” ( ) 1¼.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Ferrari Testarossa 1987 OS Giken Clutch Replacement Document Version
Shaft Replacement Standard Operating Procedure
”-10”.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
½”-10”.
Bilge Pump Service Project Model Service Kit
826YD 21/2”-10”.
830, 831 4”- 6”.
¾”-2”.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
909 3/4”-2”.
5000SS 21/2”- 6”.
909 21/2”-10”.
880V 21/2”-10”.
975 2½”-10”.
C400, C400N, C400Z 21/2”-10”.
4000CIV 21/2”-10”.
919 ¾”-2”.
M400, M400N, M400Z 21/2”-10”.
909 RPDA 21/2”-10”.
Replace Timing Belt 300 Hours.
Presentation transcript:

Servicing Welch DRYFAST ULTRA Pump Models 2032 Welch-Ilmvac Gardner Denver Thomas March 27, 2013

Dissassembly of Pump Caution: Obtain clearance from customers concerning chemicals and wear protective gloves and operate in a fume hood. Removing cover to reach internal pump Removing diaphragm(s) Removing exhaust valve(s) Removing intake valve(s)

1. Remove Inlet Fitting with 17 mm Wrench.

2. Remove 4 screws holding feet using 3.2 mm(1/8 in.) Allen Wrench.

3. Remove 2 screws with 2. 4 mm (3/32 in 3. Remove 2 screws with 2.4 mm (3/32 in.) Allen wrench and elevate cover.

4. Place cover on side and remove exhaust fitting with 17 mm wrench.

5. Remove 8 screws from heads loosening with 4 mm Allen wrench (Important: keep washers on screws).

6. Remove hose from barb and remove PTFE heads.

7. Remove diaphragm support ring and use span tool # 826801-16 to unscrew diaphragm turning counter-clockwise. Tool part no. 826801-16

8. Careful not to drop shims under diaphragm during final loosening of diaphragm by placing two fingers under diaphragm.

9. Carefully turn off the diaphragm from connecting rod assembly 9. Carefully turn off the diaphragm from connecting rod assembly. Shims are located between diaphragm and connecting rod assembly. Retain shims.

10. View of connecting rod assembly from which diaphragm is unthreaded.

11. Remove exhaust valves located under PTFE exhaust valve holder.

12. Take one bolt from head plate and tighten bolt into PTFE exhaust valve holder.

13. Grab hold of screw and head and lift out in smooth upward motion the PTFE exhaust valve holder.

14. The exhaust valve is visible after removing holder and the valve can be lift out of the PTFE head with your fingers.

15. On other side of head, there is an intake valve 15. On other side of head, there is an intake valve. To remove use a fine flat head screw driver to elevate intake valve, hold valve with fingers and using screw driver, ………….lift off intake valve from pin.

Inspection of disassembled parts

16. Cleaning parts and selecting good parts for reassembly and identifying damaged parts. Caution - Use protective gloves and operate in fume hood when chemicals present. Clean off PTFE head surfaces and diaphragms with cotton balls moistened with isopropyl alcohol (minimum of 91% alcohol). Check intake and exhaust valves if pliable. If stiff, replace. Stiff valves do not work properly. 3. Replace o-rings if damaged. 4. Replace diaphragms if damaged.

Reassembly Attach diaphragm(s) Insert exhaust valve(s) Insert intake valve(s) Attach PTFE heads Attach exhaust fitting Attach cover Attach intake fittings Test pump

17. Applying Loctite® 242 to thread on new diaphragm after putting on shims.

18. Position connecting rod assembly at its highest center position by turning fan until into position and attached diaphragm. Use tool 826801-16 to firmly tighten.

19. Install diaphragm base under diaphragm

20. Identify position of locating pin to line up other pin in same spot during tightening of the other diaphragm retainer.

21. After tightening diaphragm and retainer until pin lined up, rotate motor fan until both diaphragms are flat.

22. To re-attach intake valve, first install one end of intake valve on pin. Use finger to massage other end onto pin using lateral finger movements. Check for lateral movement of intake valve with small screw driver or finger.

23. Insert exhaust valve into PTFE head and position with small screw driver to move freely in slot.

24. Position exhaust holder in place, drop in alignment pin, and press holder into place.

25. Remove screw.

26. Attach hose to barb on PTFE head and lay down PTFE heads, intake valve side down, atop diaphragms.

27. Put on metal covers, install screws with washers finger tight in a crisscross pattern.

28. Use a torque wrench set at 2 28. Use a torque wrench set at 2.26 N·m and tighen bolts down in a crisscross pattern. Tighten each bolt to 2.26 N·m prior to tightening next bolt. Finish tightening bolts on one head before moving to next head

29. Install exhaust fitting.

30. Install cover by first positioning forward 30. Install cover by first positioning forward. Drop down cover by pulling back panel outward slightly. Don’t force on cover.

31. Insert inlet barb and tighten.

32. Insert screws into feet and tighten.

33. Insert and two screws on back panel. Leave pump for 6 hours to fully cure Loctite 242 before run the pump.

34. Plug in, attach hose to absolute vacuum gauge, turn on, and allow pump to warm-up prior to taking vacuum reading. Break-in Time to Maximum Vacuum Diaphragms not changed 60 minutes to 2 mbar* Two new diaphragms 24 hrs to reach 2 mbar* * Dependent on part condition.