Welcome to the AQS Monitor Metadata Webinar Dec. 13, 2013 You are connected to the on-line portion of the webinar. The audio is being hosted via a phone.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Advertisements

METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
ICIS-NPDES Plugin Design Preview Webinar ICIS-NPDES Full Batch OpenNode2 Plugin Project Presented by Bill Rensmith Windsor Solutions, Inc. 3/15/2012.
Database Planning, Design, and Administration
1 PM NAAQS: Update on Coarse Particle Monitoring and Research Efforts Lydia Wegman, Office of Air Quality Planning & Standards, EPA Presentation at the.
1 State Records Center Searching and Requesting Inventory  Versatile web address:  Look for any new ‘Special.
Exceptional Events Elements of an Effective Demonstration Darren Palmer US EPA Region 4.
AQS Data Handling (Under the Hood) AQS Conference August 23, 2012 Robert Coats.
AQS & Monitoring. In This Section We Will Talk About Monitoring & AQS 2 In the field Before Monitoring QAPP – quality assurance project plan Annual monitoring.
What’s new in RADIUS 4.0 and NJDEP Online Technology for submission.
Presented by the EPA AQS Team. Agenda Introductions Housekeeping/Overview of GoToWebinar Presentation Q& A session – use Question box to submit your questions.
AQS Concepts. In This Section We Will Talk About AQS Concepts 2 AQS Background History AQS as part of a monitoring program Types of Information in AQS.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Mechanical Fitting Failure Reporting New DIMP Annual Report Requirements.
System for Award Management (SAM) ►Agency Roles Administrator Training ►Dial in information: / passcode: # July 10 th, 2012.
1 AQS Ambient Monitoring Topics AQS Conference August 20, 2008 David Lutz.
EPA Update- Bob Judge Maine Air Quality Monitoring Committee April 18, ) NAAQS schedule 2) Budget 3) Technical Systems Audit.
1 Johnson Nixon Ford Carter Reagan Bush Clinton Bush.
EPA Precursor Gas Training Workshop Precursor Gas Quality Assurance Implementation Dennis K. Mikel EPA Office of Air Quality Planning and Standards.
Objectives  Accessing and Navigating within AQS  Resources available on the AQS Website  AQS Support.
OCLC Online Computer Library Center CONTENTdm ® Digital Collection Management Software Ron Gardner, OCLC Digital Services Consultant ICOLC Meeting April.
AQS Web Quick Reference Guide Changing Raw Data Values Using Maintenance 1. From Main Menu, click Maintenance, Sample Values, Raw Data 2. Enter monitor.
N E This demonstration is intended to present how EPA proposes that the user will interact with the re- engineered Air Quality Subsystem. A small subset.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
XHTML Introductory1 Linking and Publishing Basic Web Pages Chapter 3.
AMP255 – Precision and Bias Data Report 2008 AQS Conference The AMP255 Precision and Bias Data Report August 22, 2008 Presented by Jonathan Miller EPA.
E X P E R I E N C E Y O U R A M E R I C A Management of Air Quality Monitoring Data Debbie Miller National Park Service U.S. Department of the Interior.
AQS Development and Enhancement Plans AQS Development and Enhancement Plans AQS CONFERENCE Jake Summers June 9, 2010.
Introduction to Standard Reports. Standard Reports 2 How to get information out of AQS Standard Reports Site / Monitor Metadata Detail Data Reports “
Timely Policy-Related Monitoring Issues 2013 NACAA Spring Meeting May 6-8, 2013 Richard A. “Chet” Wayland Air Quality Assessment Division U.S. EPA OAQPS.
NEI: National Emissions Inventory EMF: Emissions Modeling Framework Marc Houyoux Air Quality Data Summit 12 February 2008.
Descriptive Analysis Database Archive monitoring network locations, climate, emissions, wildfires, census, political, physical, and image databases Databases.
Proposed Revisions to Ambient Air Monitoring Regulations, and Proposed FY2007 Air Monitoring Guidance WESTAR Spring Business Meeting March 28, 2006.
Exceptional Events Meredith Kurpius US EPA Region 9.
Data Submittals to AQS Nate Herbst Southern Ute Indian Tribe.
U.S. General Services Administration Office of Governmentwide Policy GSA EXPO May 4, 2010 Lee Ellis U.S. General Services Administration Office of Governmentwide.
PM 2.5 Continuous FEMs; Update and Assessments For AMTAC April 12, 2011 Kate Hoag – US EPA, Region 9.
Regulatory Perspectives on Data Quality Nick Mangus US EPA / OAR / Air Quality System (AQS) Team for the Earth Science Information Partners July 13, 2011.
WESTAR National Air Monitoring Steering Committee Update Spring Business Meeting 2010 Denver, CO Bruce Louks, Idaho DEQ.
1 Air Quality System (AQS) Status and Plans Part 1: Nick Mangus US EPA Boring Infrastructure Stuff Part 2: Mike Matsko NJDEP (Representing AQDE Team) Interesting.
Feedback Loops Andrew McCarthy. Purpose of Feedback The primary reason for feedback control is to measure and compensate for the effect of disturbances.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
Transitioning to the ACE Platform Omari Wooden Assistant Division Chief, Trade Outreach and Regulations December 11, 2015.
Janice Lam Snyder, SMAQMD December 11, 2015
1 Batch Indexing, Enviromapper, Web Services, and GIS Tools Randy Hill, Kevin Christian US EPA OWOW/AWPD/MB November 28, 2007.
1 USDI - Bureau of Land Management: Air Resource Condition and Monitoring Needs Scott F. Archer, Senior Air Resource Specialist USDI - Bureau of Land Management.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
PM 2.5 Continuous FEMs; Update and Assessments For NESCAUM Monitoring Meeting April 29, 2011 Tim Hanley – US EPA, OAQPS 1.
TAS and TIP Swinomish Tribe and the Incremental Approach.
PM Methods Update and Network Design Presentation for WESTAR San Diego, CA September 2005 Peter Tsirigotis Director Emissions, Monitoring, and Analysis.
All EN Payments Call March 29, 2016 Ticket Program Manager Social Security’s Ticket to Work Program.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Annual Air Monitoring Data Certification and Concurrence Process 1.
Session 6: Reports.
NPDES Electronic Reporting Rule
Specialty Forms Webinar
Prepared By: Bobby Wan Microsoft Access Prepared By: Bobby Wan
December 21, 2017 Carmen Connect Webinar
Proposed Ozone Monitoring Revisions Ozone Season and Methods
PMcoarse , Monitoring Budgets, and AQI
FY19 Federal Grant Monitoring: Titles I, II, IV
Bulk Data Task Force Update Government Publishing Office
Leroy Williams GRIC DEQ Air Program
Exceptional and Natural Events Rulemaking
Fine Particulate Air Monitoring
Environmental & Energy Law
Multi-Sector General Permit: MSGP
New Users Guide to NetDMR
EPA FY2008 Air Monitoring Budget Guidance
Presentation transcript:

Welcome to the AQS Monitor Metadata Webinar Dec. 13, 2013 You are connected to the on-line portion of the webinar. The audio is being hosted via a phone line: conf code # (Please mute your phone line) We will be taking questions via the on-line Questions box, and having a Q&A time at the webinar.

Agenda Monitor Types – History – Mapping to new metadata elements Monitor Method New Batch Transactions Demo Questions and Answers Dec. 13, 20122

Monitor Types – History Dec. 13, Monitor Types SLAMS Special Purpose Tribal Monitors IndustrialOther Federal Network Affiliations IMPROVE Trends Speciation Supplemental Spec. NATTSNCorePAMS Unofficial PAMS Other Information Non- Regulatory Index SiteQA collocated Legacy Monitor Types OtherNAMSWHOWMO

Metadata Changes/New Metadata Monitor Type: Only administrative classification Monitor Network Affiliation: Network / Program for monitor (e.g. NCORE, PAMS) Monitor NAAQS Exclusion: Replaces non- regulatory type Monitor Collocation Period: Use instead of “QA Collocated” monitor type Dec. 13, 20124

New Monitor Types SLAMS: State or Local air monitoring stations for parameters (pollutants and/or meteorological data) addressed by 40 CFR Part 58. TRIBAL MONITORS: Air monitoring stations operating under the authority of a Federally recognized tribal agency for parameters addressed by 40 CFR Part 58. SPECIAL PURPOSE: A monitor that an agency has designated as “Special Purpose” in its annual monitoring network plan for parameters addressed by 40 CFR Part 58. INDUSTRIAL: A monitor that is operated by a private industry entity rather than under the control of a State, Local, or Tribal government. EPA: A monitor that is operated by EPA or an EPA contractor for parameters addressed by 40 CFR Part 58. NON-EPA FEDERAL: A monitor operated by another Federal agency for parameters addressed by 40 CFR Part 58. SPM-OTHER: A monitor for a parameter not addressed by 40 CFR Part 58. (i.e. It will not be allowed for criteria pollutants or other parameters associated with a monitoring network such as NCORE, PAMS or NATTS.) Note: After the change, a monitor will only be allowed to have a single monitor type on any specific day. Dec. 13, 20125

Monitor Method A new metadata element has been created for Monitor Method; this new element identifies the monitor’s Method of Collection and Analysis for a specified period of time. Dec. 13, 20126

New Batch Transactions MM – Monitor Method MN – Monitor Network Affiliation MO – Primary Monitor Period MX – Monitor NAAQS Exclusion See Monitor-Metadata_Transactions.pdf Monitor-Metadata_Transactions.pdf Note: Each transaction has a corresponding Maintain Form Tab. Dec. 13, 20127

Transition Monitor Types converted to new elements on Dec. 7, 2013 Software to manage new metadata deployed on Dec. 7, 2013 Metadata submitted with old Monitor Type will be automatically converted for 1 year EPA will work with submitters to move recent data with multiple methods to separate POCs Early in 2014 AQS will generate an error if Raw Data Submitted with wrong method. Dec. 13, 20128

Demo Submitting new metadata file New Correct Forms New Maintain Monitor Form Tabs Updated Site and Monitor Description Reports Dec. 13, 20129

Question and answer time Dec. 13,