NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.

Slides:



Advertisements
Similar presentations
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Advertisements

Planning, optimization and regulatory issues
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
Sistan & Balouchestan Electric Power Distribution Company
Distributed Intelligence Provides Self-Healing for the Grid
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
On Load Tap Changing Transformer Paralleling Simulation and Control.
Distribution Management System Implementation at Florida Power & Light
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Presented by: Vidyalankar Nidamarthy.
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
VMware vCenter Server Module 4.
Supervisory Systems.
FTP. SMS based FTP Introduction Existing System Proposed Solution Block Diagram Hardware and Software Features Benefits Future Scope Conclusion.
Bentley Electric Solution Overview Agenda Product FrameWork Electric Solutions Bentley Electric Expert Designer.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Abstract Load balancing in the cloud computing environment has an important impact on the performance. Good load balancing makes cloud computing more.
Chapter-4 Windows 2000 Professional Win2K Professional provides a very usable interface and was designed for use in the desktop PC. Microsoft server system.

1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
1 AMI’s place in the future AMI is THE key enabler for the future smart grid The ‘intelligent grid’ is not intelligent without AMI Customers are not empowered.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
1. Windows Vista Enterprise And Mid-Market User Scenarios 2. Customer Profiling And Segmentation Tools 3. Windows Vista Business Value And Infrastructure.
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
Power Line Carrier Communication based Automated Meter Reading System
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Author Vilcahuaman.Melendez Country PE Session V – Block 2 – Question 23 Barcelona May THREE-PHASE DISTRIBUTION POWER FLOW WITH A GEOGRAPHIC.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
EZee iCafe System. Contents Introduction Current Scenario Proposed Solution Architecture / Block Diagram Hardware / Software Requirements Features Benefits.
Author name Country ID Session X – Block Y – Question Z Barcelona May Geographic information system (GIS) and their role in power utility.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Northwest Power and Conservation Council 1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009.
KEM_Cespedes_A1 Colombia Session 3 – Block 1 Barcelona May ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN.
Model-Centric Smart Grid for Big Data
Nelson Kagan BR Session 4 – Block 3 – Planning – Paper #66 Barcelona May Technical Assessment for the Installation of Dispersed Generation.
1 © 2013 Eaton. All Rights Reserved. Distribution Network Planning Daniel Desrosiers, P. Eng Engineering Consulting Services.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
© 2015 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton software.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
HARDWARE AND SOFTWARE. What is hardware? Hardware is any physical component of a computer system. Without any hardware, your computer would not exist,
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Dated: 17 February 2016 Instructor :Kashif Mehmood.
Smart Grid Big Data: Automating Analysis of Distribution Systems Steve Pascoe Manager Business Development E&O - NISC.
Configuring SQL Server for a successful SharePoint Server Deployment Haaron Gonzalez Solution Architect & Consultant Microsoft MVP SharePoint Server
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
© 2015 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton software.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
This is a photographic template – your photograph should fit precisely within this rectangle. © 2016 Eaton. All rights reserved. Eaton software tools xSpider.
Announcements Please read Chapter 6
Agenda TSOG 8th November
CHAPTER 6 SPECIAL TRANSFORMERS Electrical Machines.
Overhead Distribution Systems
the CERN Electrical network protection system
Distribution Feeder Voltage Regulation and Control
Design of Electric Power Systems and Utilities
DEC System Voltage Planning - June 2018
Utilizing the ring operation mode of MV distribution feeders
CIM in a Triple-Store Database for Distribution Power Flow
Prepared by: Ismael K. Saeed
Presentation transcript:

NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited

AGENDA Critical Success Factors for Utility GIS Architecture Power Utility Applications in GIS Information in GIS Network Analysis Tools CYMEDIST CYMEDIST Requirement Network Analysis in CYMEDIST using GIS data GIS-CYMEDIST Interface CYMEDIST Demo

CRITICAL SUCCESS FACTORS FOR UTILITY Maintain Reliable Power Supply Optimize Cost of Supply Regulatory Compliance Achieved by Proper Energy Billing and Accounting Proper Asset Management Proper Network Analysis & Planning With the help of Spatial Asset Information - GIS

GIS Architecture

Power Utility Applications in GIS Network Analysis Single Line Diagram (SLD) Load Flow Analysis (Voltage drop/ Loading) Contingency Analysis Switching Optimization Capacitor Placement Reliability Analysis Electrical Design Manager Work Order Processing SAG Calculation BoQ preparation Other Energy Auditing Asset Management

INFORMATION IN GIS Information on Road

Information on a Sub-station

Information on a HV line

Information on a Transformer

Network Analysis Tools The network Analysis is carried out by using – The Network topology and data from IS Computerized Analysis Tool The Network tools available – Cyme Dist SYNERGEE CALPOS WIND MIL NEPLAN POWER (Hitachi) POWERNET (Global)

CYMEDIST Primary Distribution System Analysis tool Capability to perform several type of analysis like- Balanced or unbalanced on three-phase Two-phase and single-phase systems All above with radial, looped or meshed configurations. Voltage drop and power flow analysis. Fault calculations Optimal capacitor placement and sizing. Load balancing load allocation/estimation. Switching Optimization Reliability Analysis

CYMEDIST REQUIREMENT For Dedicated Users : A PC with P-IV Processor 20 Gb HDD Minimum 128 MB RAM 17” Color Monitor Window-98 or higher CYMEDIST Software CD CYMEDIST Hardware License key GIS Data File of Network For Web Users in GIS: PC with normal configuration Web Browser CYMEDIST Interface with GIS

NETWORK ANALYSIS IN ‘CYME’ USING GIS DATA GIS Core -Network Connectivity - Network Asset details CYME -Voltage Drop Analysis - Capacitor Placement -Short Circuit Analysis - Load Allocation - Service Restoration - Reliability Analysis - Contingency Analysis Access Network data from GIS DB Network Analysis in GIS Compatible Format- Dw/ mif

GIS Core -Network Connectivity - Network Asset details CYME -Voltage Drop Analysis - Capacitor Placement -Short Circuit Analysis - Load Allocation - Service Restoration - Reliability Analysis - Contingency Analysis Access Cyme Algorithms DB Network Analysis in GIS GIS - CYME INTERFACE

CYMEDIST – Details and Demo Network Modeling Load Flow Analysis Contingency Analysis Tie Point Optimization Reliability Analysis Capacitor Placement

Network Modeling Import GIS Data Modeling Load flow Analysis: Input the Loading Conditions Find Voltage Drop in all elements Find Loading (both active/ reactive loads) Find Technical Losses Contingency Analysis: Study impact of Single Outage on the System Find optimize Switching Plan to restore max. load Demo

Tie Point / Switching Optimization : Help determining optimum feeder configuration to minimize losses Improve voltage regulation Based on user defined thresholds- Suggest Closing/ Opening of existing switches Suggest addition of new switches Reliability Analysis: Run the scenario to the impact of Distribution Automation can be evaluated The system indices such as SAIFI, SAIDI, ENS can be evaluated

Thank You