Comparing New Building Pre-Construction and Post Occupancy Energy Models with Actual Performance 2014 CA Higher Education Sustainability Conference – Session.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

A CASE STUDY in actual energy conservation
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
NET ZERO STUDY ON A COMMUNITY COLLEGE By: Amanda OConnell Doenges.
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
Energy Sub-Metering for Measurement and Verification
Sustainability Advocates Program New Advocates Training April 7, 2009 ENERGY AT NYU.
Make the most of your energy Head Office – Case Study.
An Economical Analysis on Data Servers; Green vs. Regular Teddy Hsieh, Chris Davis, Christopher Perrenoud, Matt Nickeson, Shabnam Jahromi ETM 535-Winter.
Presenters: Bob Kilgore Matthew McReynolds Brenna Goode CHEMISTRY BUILDING RCX.
Energy Efficient Operations: Giving facility operators the tools to optimize building performance The B3 Energy Efficient Operations Manual Garrett Mosiman.
Objectives Finish with ducts and fans Define project topics.
ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Engineering III Building 40,000 gsf Completed 2002 Designed and constructed in two.
Plans for Commercial Building Benchmarking R&D in 2006 Martha Brook California Energy Commission PIER Buildings Program presented to the EPAC on December.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Sustainable IT at Stanford S T A N F O R D U N I V E R S I T Y S U S T A I N A B L E I T Page 1 Energy Efficiency Rebates & Sustainable IT Sustainable.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Class Project Report Sustainable Air Quality, EECE 449/549, Spring 2009 Washington University, St. Louis, MO The Energy Analysis and Carbon Footprint of.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Class Project Report Sustainable Air Quality, EECE 449/549, Spring 2009 Washington University, St. Louis, MO The Energy Analysis and Carbon Footprint of.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Overview of Data Center Energy Use Bill Tschudi, LBNL
1Managed by UT-Battelle for the Department of Energy David Carroll APPRISE National WAP Evaluation: Savings and Opportunities for Baseload Electric.
Objectives Analyze processes in AHU and buildings.
The Medical Office Building Kale Mullikin Mechanical Option Advisor: Donghyun Rim.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
Industrial Energy Engineering C4S March 27, 2008.
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Class Project Report Sustainable Air Quality, EECE 449/549, Spring 2009 Washington University, St. Louis, MO The Energy Analysis and Carbon Footprint of.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
INTERCONTINENTAL HOTELS GROUP Energy Star Audit.
Green Server Room Construction Primary concerns when building a server room is size and cooling. Size can be diminished with the use of virtual servers.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
The importance of process in high performance building design.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Straightforward Innovative Energy Savings Renovation In 2011 Harvard University completed a comprehensive interior renovation of the 105,000 square.
Oak Ridge National Laboratory
HEAT RECOVERY VENTILATION MAKING MONEY WITH SMALL COMMERCIAL RETROFITS
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
GVSU Case Study Analysis of HVAC filter using MERV 13 filter with low pressure drop design. 1.
The most exciting DDC control to be introduced in the last 30 years.
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
Lehigh Valley Heritage Center
Objectives Psychometrics Examples in AHUs.
TCU and the Presidents Climate Commitment:
Objectives Processes in Cooling towers and AHUs.
Presentation transcript:

Comparing New Building Pre-Construction and Post Occupancy Energy Models with Actual Performance 2014 CA Higher Education Sustainability Conference – Session 47 June 18, 2014 Gerry Hamilton

How Energy Models are Staged ■ Utilize Building Energy Models ■ Economic Model ■ Final Design Model ■ Evaluation Model Applied at different stages of the project. Permitting CDs Programming SDs DDs Turnover & Operation

Recently Completed “High Performance” Buildings ■ Lokey Stem Cell Research Building ■ Large Wet Lab ■ Knight Management Center ■ Multi building office / classroom facility ■ William H. Neukom Building ■ Simple office building

Lokey Stem Cell Research Building ■ Medical School lab/research building ■ Opened in Fall 2010 ■ 258,000 square feet ■ 380 VAV fumehoods ■ Zone level heating and cooling ■ Heat recovery on main air handler units

Lokey Stem Cell Research Building – Data

Lokey Stem Cell Research Building - Analysis Zone level heating + cooling is very effective Heat recovery system is more effective than modeled for this 100% outside air AHU system. The plug load for lab space used in the original load calculation is over estimated by a factor of three.

Lokey – Benchmark Comparisons

Knight Management Center ■ Stanford Graduate School of Business ■ Completed in 2011 ■ 387,510 square feet (eight buildings) ■ Includes: offices, classrooms, conference rooms, library, auditoria, and dining pavilion ■ LEED TM Platinum ■ Extensive submetering

Knight Management Center – Data

Knight Management Center – Analysis ■ Design operating hours were greatly exceeded ■ Could see high nighttime plug and lighting loads thanks to submetering ■ Utilized temporary occupancy sensors to verify ■ (Need an industry metric to account for space utilization) ■ Heating load under-estimated in model ■ Found a few RCx type measures through post occupancy energy modeling effort ■ Review of global heating setpoints ■ Schedule of several AHUs

Knight Center – Benchmark Comparisons EIA - US Energy Information Admin

William H. Neukom Building ■ Law School office building ■ Completed in 2011 ■ 65,000 square feet ■ VAV Reheat ■ Operable windows

Neukom Building – Data

Neukom Building – Data Analysis Model underestimates heating loads Model missed some electric loads Some outdoor lighting More emergency lighting than expected (runs 24/7) Power converter and battery backup for emergency lighting parasitic load

Neukom Building – Benchmark Comparisons EIA - US Energy Information Admin

Appendix