Empowered lives. Resilient nations. Khan Younis Waste Water Treatment Plant 1 / KY WWTP.

Slides:



Advertisements
Similar presentations
Decentralised Wastewater Management
Advertisements

“Upgrading the collection and wastewater treatment system in Ploiesti City”
IPN-ISRAEL WATER WEEK (I2W2)
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
Sustainable Management of Scarce Resources in the Coastal Zone SMART ICA3 – Kick-off Meeting CEDARE, Cairo, 5-6 January, 2003 Case Study Jordan.
Institutional and Legal Plan for Wastewater Reuse in Palestine 1 Technical Assistance on Reuse of Wastewater and Storm Water Harvesting in the Gaza Strip.
Waste Water Recycling System- Effluent System D.Chakraborty.
Wastewater Treatment City of London. What is Wastewater? Water used in our communities and businesses leaves as wastewater to be treated and returned.
UWWT directive in Croatia – implementation and data availability
IMPROWARE – INNOVATIVE MEANS TO PROTECT WATER RESOURCES IN THE MEDITERRANEAN COASTAL ARE AS THROUGH RE-INJECTION OF TREATED WATER Bruxelles, 16 October,
Conceptual Design of a Wastewater Treatment Plant for the Municipality of Cotorro, Province of Havana, CUBA 2009 Association for the Study of the Cuban.
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Wastewater Collection Systems Teague Harris Pate Engineers, Inc. John Montgomery Municipal.
Where does the sludge go? grams per person per day Sludge handling/disposal accounts for 25-50% of the cost –Sludge treatment:- Convert organics.
W ATER Q UALITY OF W ADI A L -Z EIMAR U NDER THE D IRECTION OF D R. A BD A LFATTAH M ALLAH P REPARED B Y : N ASSER A BDULLAH A BU M OHSEN J AREH HASAN.
Fresh Water Historically limiting factor in arid regions World population more than doubled 2.3 billion  5.3 billion Per capita water use doubled.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Wastewater Treatment & Collection System Improvements.
Wastewater Treatment Plant
Wastewater generation
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Prioritization of Drinking Water and Wastewater Projects Project Application – Region 6.
Water Issues In India by Vijay Kumar Eppakayala. India on the globe.
Water Pollution G. Tyler Miller’s Living in the Environment 14 th Edition Chapter 22 G. Tyler Miller’s Living in the Environment 14 th Edition Chapter.
COUNTRY PAPER ON REUSE OF LOW QUALITY WATER IN EGYPT.
M.K. PANDEY/P. Jenssen Centralised –Decentralised transportation system.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
Water Crisis in Gaza Strip A study of the Impact of Middle East Conflict upon Water Quantity and Quality in Gaza Strip By: Ayman H. Afifi Islamic University.
04/12/04 Environmental Protection Agency/Lithuania OECD/Eurostat JQ Inland Waters Country presentation Lithuania Violeta Juozefaite.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
SANITATION SYSTEMS AND ENVIRONMENTAL PROTECTION ACTIVITIES IN ISTANBUL CITY SANITATION SYSTEMS AND ENVIRONMENTAL PROTECTION ACTIVITIES IN ISTANBUL CITY.
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Water Treatment Chapter 11. Sewage Treatment Rationale More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement.
Tammy Klemens & Darla Topp, Kent State University Stark Campus, North Canton, Ohio, USA What’s the Stink About Sewage?
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
THE RHONE RIVER BASIN Alex Houston February 23, 2012.
1 «Existing situation, plans and policies for the wastewater reuse in agriculture in Cyprus, Jordan and Palestine» KONSTANTINOS MOUSTAKAS NTUA PhD Candidate.
Water Pollution. Types and Sources of Water Pollution  #1 problem - Eroded soils  Organic wastes, disease-causing agents  Chemicals, nutrients  Radioactive.
FreshwaterJeopardy $100 $200 $300 $400 $500 $100$100$100 $200 $300 $400 $500 Freshwater Systems and Resources How We Use Water Quantity of Freshwater Freshwater.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Sewage Infrastructure Development in Israel The water Authority The Sewerage Infrastructure Development Administration.
WATER TEST REVIEW.  What percent of our planet is water?
Chirstchurch: Pipelines. Earthquake Concerns on Underground Pipes Wave propagation Permanent ground deformation Liquefaction Can lead to pipe leakage.
C ONNECTION OF POPULATION TO PUBLIC WATER SUPPLY Jana Jankova Desk officer of Department of State Administration of Water Management and River Basin Ministry.
January 28, A new power station, privately owned, is established in the Gaza Strip The Israel Electric Company receives a concession.
Preserving The Upper San Pedro River Basin Presented to: The Upper San Pedro Partnership Executive Committee October 7, 2009.
Water Pollution Based on presentation from manskopf.com, Environmnaental Science Course Introduction to Environmental Health Eric Amster MD, MPH.
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Wastewater treatment development in Budapest (with special regard to GEF project in NBWWTP)
Faecal Sludge Management (FSM)
CTC 450 Review Open Channel Flow (Manning’s Equation)
Analysis of Qabalan, Water Network , Design of Wastewater
Manchester’s CSO Program: A Look Behind and a Look Ahead
UNDP-GEF Project on Lake Tanganyika Best Practices and Challenges
Sewage collection system of the Dan Region
Summary Water is a renewable resource that circulates continually between the atmosphere and the Earth’s surface. The energy for the hydrologic cycle is.
CTC 450 Review Open Channel Flow (Manning’s Equation)
Living in the Environment
Graduation project report II Supervisor: Dr. Anan Jayousi
Treated Effluent Reuse / Discharge Practices in Larnaca and Limassol
Wastewater collection and treatment plant system for al Yamon
Sanitation Study and Wastewater Network System AL Tayba Village
COX’S BAZAR,BANGLADESH. SEWAGE TREATMENT PLANT INTRODUCTION  Sewage treatment is the process of removing contaminants from waste water and household.
Presentation transcript:

Empowered lives. Resilient nations. Khan Younis Waste Water Treatment Plant 1 / KY WWTP

Empowered lives. Resilient nations. Gaza Strip Khan Younis Governorate 2 / KY WWTP

KY City is the second largest city in the Gaza Strip, Total Population 195,000 capita. Brief Background 30,000 cesspits exist, Evacuated weekly or monthly costing ≈ USD/month Empowered lives. Resilient nations. 90% of water wells in KY don’t meet WHO quality standards. 3 / KY WWTP KY Governorate consists of 7 Municipalities; Total Population 295, 000 capita.

In 2004 UNDP &PWA provided design for a WW collection system in KY as part of USD 7.8 M storm water project. Currently around 60% of population is sewer connected. Empowered lives. Resilient nations. Brief Background 4 / KY WWTP Nitrate levels in water wells: 220 mg/L in average. 458 mg/L in few wells. 50 mg/L as WHO Std. Raw sewage collected in temporary lagoons.

Block-G streets Al Balad streets Dire Sewerage Status Empowered lives. Resilient nations. 5 / KY WWTP Al Katiba Area

Zo’rob Area Dire Sewerage Status Empowered lives. Resilient nations. Al Aqad Area Al Sagali Area Al Amal Neighborhood 6 / KY WWTP

Al Qatatwa Neighborhood Lagoon Al Majadlah Neighborhood Lagoon Empowered lives. Resilient nations. 7 / KY WWTP Al Amal Neighborhood Lagoon Al Mawasi Western Lagoons Dire Sewerage Status

Sea Outfall Khan Younis Summer Beach Empowered lives. Resilient nations. Dire Sewerage Status Around 12,000 m3/day of Partially treated sewage discharged to the Mediterranean Sea. 8 / KY WWTP

Impacts on Population Health In a Al- Mawasi area, water analysis of agricultural water wells showed high and serious biological contamination. Some samples showed that the Fecal coli-form and Total coli-form are too numerous to count; 4,800 cases of water born diseases were admitted in UNRWA clinics in The prevalence of water born diseases such as, diarrheas, dysenteries, salmoellosis, hepatitis A, typhoid, guardian and amoeba histolytica in Khan Younis city is considered to be one of the highest among the Gaza Strip. Prevalence of Methemoglobinemia Blue Babies; Empowered lives. Resilient nations. 9 / KY WWTP

Children Traps Al Qatatwa Neighborhood Lagoon Doha 3 years 11/1/2011 Shatha 4 years 25/12/2010 Empowered lives. Resilient nations. Wisam 5 years & Malak 3 years 6/12/ / KY WWTP

Empowered lives. Resilient nations. Therefore KY WWTP Project is considered: A Strategic Environmental and Infrastructural Project & a Vital Need for Khan Younis Residents 11 / KY WWTP

 Protect public health and improve the environmental conditions of Khan Younis residents;  Control pollution of the coastal aquifer and protect the limited water resources;  Provide new water source of treated waste water by recharging 9.7 MCM/year into aquifer. Irrigation scheme will be developed with PWA and MoA; Project Objectives Empowered lives. Resilient nations. 12 / KY WWTP  Improve socio-economic conditions and promote dignified livelihoods of Khan Younis residents.

Palestinian Water Authority (PWA) Coastal Municipalities Water Utility (CMWU) Khan Younis Municipality (KYM) Counterparts Empowered lives. Resilient nations. 13 / KY WWTP

 The strategic plan is to design and construct an Extendable WWTP with effluent capacity for the year 2025;  It will be constructed in two phases;  First phase will hold influent for the year 2018; with total flow of 26,600 m3/d.  Second phase will hold influent for the year 2025; with total flow of 44,900 m3/d. Strategy of the Khan Younis Treatment Plant Empowered lives. Resilient nations. 14 / KY WWTP

376,000 direct beneficiaries, Phase II ,000 direct beneficiaries, Phase I 2018 Beneficiaries Empowered lives. Resilient nations. 15 / KY WWTP

 Detailed design of an extendable KY WWTP; (Completed)  Construction of KY WWTP, Phase I;  Construction of the Infiltration Basins.  Construction of Effluent and Emergency Pressure Pipeline from KY WWP eastern site to the infiltration basins and to the sea of 18.6 km length.  Conducting Construction Supervision.  One Year Operation after Commissioning. KY WWTP Project Main Components Empowered lives. Resilient nations. 16 / KY WWTP

KY WWTP Main Components Emergency Pressure Line KY WWTP Permanent Site. Proposed Extension Area for Phase II Al Fukhari Proposed Infiltration Area Moraj Proposed Infiltration Area- Second Alterative. Al-Amal Existing Temporary Waste Water Lagoon “ Storm Water Lagoon” Temporary Waste Water Western Lagoon. Pump Station 8 Pump Station 3 Pump Station 2 17 / KY WWTP

Parameter(Unit) Required quality Design Outfall Secondary treatment Tertiary treatment BODmg/l<20<25<20In any case Suspended solids, SS mg/l<30 <15In any case Total nitrogenmg/l<25 In any case Ammonium nitrogen, NH4-N mg/l<10Infiltration mg/l<50Irrigation Nitrate nitrogen, NO3-N mg/l<15Infiltration mg/l<50Irrigation Pathogens (*)no./100 mlNil In any case NematodesEggs/L≤1 In any case Faecal Coliform CFU/100 ml <200Infiltration CFU/100 ml <200Irrigation Treated Waste Water Quality Requirements Empowered lives. Resilient nations. 18 / KY WWTP

Empowered lives. Resilient nations.  Based on the Detailed Design Report; USD M are needed to construct, manage and effectively operate KY WWTP, Phase I.  Total additional fund required to implement and construct a functional KY WWTP, Phase I, is amounting USD M.  Cost Breakdown of KY WWTP components is available in the following table; Additional Fund Required 19 / KY WWTP

Project Activities GoJKuwait Fund/IDBTotal Budget 1 Constructing Main Steel Pressure Pipeline from Existing Terminal PS # 8 to KY WWTP 530, Providing the Detailed Design for the Construction of KY WWTP 1,100, Constructing KY WWTP, Phase I 11,920,00015,633,74527,553,745 4 Constructing the Effluent and Emergency Pressure Pipelines to Infiltration Basins and Sea Outfall 08,677,130 5 Constructing the Infiltration Basins (implemented by CMWU) 07,498,523 6 Constructing the Main Electrical Power Supply Line to KY WWTP, Phase I 0603,416 7 Carrying out the Pre-Contract Services and Construction Supervision for the Construction of KY WWTP, Phase I 03,058,000 8 Carrying out One Year of Operation After Commissioning of KY WWTP, Phase I 02,727,120 9 Capacity development for CMWU at implementation and operation Stages 0763, Direct Implementation Cost 181,4812,387,9532,569,434 Sub-Total13,731,48141,349,72655,081,207 Total GMS (GoJ 8% - Kuwait Fund/IDB 7%)1,098,5192,894,4813,993,000 Total 14,830,000 44,244,20759,074,207 KY WWTP, Phase I - Detailed Cost Estimate Empowered lives. Resilient nations.

Project Activities GoJKuwait Fund/IDBTotal Budget 1 Constructing Main Steel Pressure Pipeline from Existing Terminal PS # 8 to KY WWTP 530, Providing the Detailed Design for the Construction of KY WWTP 1,100, Constructing KY WWTP, Phase I 11,920,00015,633,74527,553,745 4 Constructing the Effluent and Emergency Pressure Pipelines to Infiltration Basins and Sea Outfall 08,677,130 5 Constructing the Infiltration Basins Basins (implemented by CMWU) Constructing the Main Electrical Power Supply Line to KY WWTP, Phase I 0603,416 7 Carrying out the Pre-Contract Services and Construction Supervision for the Construction of KY WWTP, Phase I 03,058,000 8 Carrying out One Year of Operation After Commissioning of KY WWTP, Phase I 02,727,120 9 Capacity development for CMWU at implementation and operation Stages 0763, Direct Implementation Cost 181,4812,167,8652,349,346 Sub-Total 13,731,48133,631,11647,362,597 Total GMS (GoJ 8% - Kuwait Fund/IDB 7%) 1,098,5192,354,1783,452,697 Total 14,830,00035,985,29450,815,294 KY WWTP, Phase I - Detailed Cost Estimate UNDP Intervention Empowered lives. Resilient nations.

 Main inlet gravity and pressure pipeline implemented in 2006;  Detailed Design completed in Dec. 2010, and approved by PWA and CMWU;  EIA was conducted and approved by EQA;  Tender Documents delivered and ready to launch the Construction stage. Project Progress (Funded by GoJ) Empowered lives. Resilient nations. 22 / KY WWTP

 The project will be implemented by UNDP/PAPP in close cooperation with PWA, CMWU and KY M;  Construction phase is planned to be completed within three years ending in first quarter 2016, provided starting November 2012;  Construction supervision will be performed by a JV of international & local consultant;  One year operation after Commissioning will be carried out to transfer Knowledge and proper codes of Practice, Project will be handed over to CMWU in first Quarter Implementation Plan Empowered lives. Resilient nations. 23 / KY WWTP

Expected Outputs Q2Q2 Q1Q1 Q4Q4 Q3Q3 Q2Q2 Q1Q1 Q4Q4 Q3Q3 Q2Q2 Q1Q1 Q4Q4 Q3Q3 Q2Q2 Q1Q1 Q4Q4 Q3Q3 Q2Q2 Q1Q1 Q4Q4 Q3Q3 Pre Contract Services by a JV of international and local consultant 1 Prequalification of International and Local Contractors 2 Construction Supervision Assignment by a JV of international and local consultant 3 Tendering & Construction of KY WWTP 4 Tendering & Construction of Effluent and Emergency Pipeline 5 Tendering & Construction of Infiltration Basins. 6 Tendering & Construction of Electrical Power Supply Works. 7 One Year Operation After Commissioning 8 Tentative Workplan Empowered lives. Resilient nations. 24 / KY WWTP Press for detail

 Close coordination between all parties.  Project management team.  Construction supervision team. Empowered lives. Resilient nations. Implementation Needs  Land availability for the infiltration basins.  Israeli Approval for the implementation of KY WWTP.  Access of construction materials.  Security coordination to access KY WWTP eastern site.  Provision of electrical energy to operate the plant. 25 / KY WWTP Press for detail

Risks 26 / KY WWTP Difficulties in access of required construction materials Coordination with the Israeli authorities. Contingency plan to access materials to be developed. Object of some Al Fukhari Residents to construct the infiltration basins Enhance community participation, Coordinate with counterparts for advance public awareness. PWA, CMWU and Khan Younis Municipality are not able to acquire the land for infiltration. Coordination with counterparts and concerned authorities to accelerate land acquisition. Shortage of available fund to cover construction works Coordination with donors and counterparts.

27 / KY WWTP Risks Fuel shortage and regular electricity cut. Alternative fuel and electrical source to be provided by contractor and counterparts. Restriction on mobility of international & local staff due to security situation. Coordination with UNDSS, Provide security update on daily basis for all staff. GEDCO is not able to provide the required electrical power. UNDP will invite counterparts to joint cooperation meetings to agree upon a work plan and timeframe. Israeli Military Operation Coordination with the Israeli concerned authorities.

Images of Performed On-Site Activities Empowered lives. Resilient nations.

Construction of Main Inlet Pipeline Empowered lives. Resilient nations. 29 / KY WWTP

Site Work - Geotechnical Investigations - Eastern Site Empowered lives. Resilient nations. 30 / KY WWTP

Site Work - Geotechnical Investigations - Infiltration Site Empowered lives. Resilient nations. 31 / KY WWTP

Site Visits - International Consultant Empowered lives. Resilient nations. 32 / KY WWTP

Site Work - EIA Site Work Empowered lives. Resilient nations. 33 / KY WWTP

Empowered lives. Resilient nations. Site Visits & Coordination Meetings UNDP &UN Representatives 34 / KY WWTP

Public Hearing Meetings Empowered lives. Resilient nations. EIA Public Hearing Workshop 35 / KY WWTP

With all of You, we are so optimistic that it will be done For ou !! hank T Y Empowered lives. Resilient nations.