Connector Summit Results – Way Ahead Seabasing OAG – 22 July 2014

Slides:



Advertisements
Similar presentations
Navy Mission Essential Task Lists (NMETLs) and METOC MEASURES
Advertisements

1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Roadmap for Sourcing Decision Review Board (DRB)
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
C2 Integration Division Marine Corps Combat Development Command
AF Aerial Layer Network Approach
Navy’s Operational Authority for Naval Networks, Information Operations, and FORCEnet 2004 Strike, Land Attack & Air Defense Annual Symposium Vice Admiral.
The Affordable Solution - JSF ‘Joint Strike Fighter’,'JSF', and the JSF Logo are Trademarks of the United States Government. DISTRIBUTION STATEMENT A.
Jimmy E. Fowler Coastal and Hydraulics Laboratory
HIGH SPEED LIGHTERAGE ASSULT CONNECTOR JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY Dan McCluskey NAVFACHQ.
9th EXPEDITIONARY WARFARE CONFERENCE
UNCLASSIFIED Seabasing OAG Information Brief 23 July 2014 Major Scott Welborn 1.
1 The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter. Understand.
United States Marine Corps
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
PM AAVS Program Brief For 2005 Combat Vehicles Conference.
4 March 2015 Steven Szilagyi PEO IWS D4
The Final Link in the Sealift Chain
Army Doctrine Publication (ADP) 3-37; and Army
OVERALL CLASSIFICATION UNCLASSIFIED
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited ENHANCING WARFIGHTER CAPABILITY THROUGH A MULTI-FACETED OPERATIONAL.
DISTRIBUTION A. Approved for public release: distribution unlimited.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
“Why Single Naval Battle” Ellis Group June 2012
MPF(F) R&D MPF(F) Cargo Operations R&D Joint Seabased Theatre Access Workshop February Duck, NC Authors: Martin Fink, Arthur Rausch,
NIST Special Publication Revision 1
NDIA – Expeditionary Warfare Conference
IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Operational Mix: Design Imperatives Access Influence Complex and irregular challenges abound in the urban littorals Preventing WarsWinning Wars.
Navy Warfare Development Command
Sustainability Task Force Kickoff Meeting Oct 2, 2008 By Karen J. Baker.
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
1 Joint Logistics Over-The-Shore (JLOTS ) Throughput Modeling Tool (JTMT) for The Ninth Annual JLOTS /Logistics-from-the-Sea Symposium 28 January 2004.
Department of Navy Logistics Community Update to Logistics FIPT 28 January 2004 DoN Log. Community = 25 Job Series & 11,458 people.
1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea January 2004 MANSCEN DPMO.
NATO UNCLASSIFIED Bi-SC Concept for Connecting NATO and National Training Capabilities IPR Angel San Jose Martin ACT Project Manager Wolfhard Schmidt.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
Seabasing Roadmap † : A Littoral Warfare Systems Perspective Dr. David P. Skinner, LWS Product Area Director October 2004 † Seabasing Roadmap N703/N75.
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
Shape Anticipate InnovateLead Shape, Anticipate, Innovate, and Lead MAJ Jim Gray DA G-4 FP DSN JLOTS JIPT Update LCDR Shaugn Ostrowski N422 DSN.
Design Considerations for a Lightweight Modular Causeway Section (LMCS) James N. Pratt Coastal and Hydraulics Laboratory US Army Engineer Research and.
UNCLASSIFIED 13 Jan January 2004 LtCol Larry Ryder, USMC MCCDC USMC High Speed Vessel Project Overview.
Defense Science Board Task Force on Sea Basing. Summary of Conclusions Sea basing - a critical future national competence for assuring access to areas.
Dr. Jimmy E. Fowler Dr. Jimmy E. Fowler Coastal and Hydraulics Laboratory Army Engineer Research and Development Center (601)
JNTC Joint Management Office
USJFCOM 27 Jul EXECUTIVE OVERVIEW Col David Brown, USAF JFIIT Commander UNCLASSIFIED Joint Fires Integration and Interoperability Team (JFIIT)
Authorized for Public Release IAW SPR dtd RDML Mark R. Milliken Deputy Assistant Secretary of the Navy, International Programs (DASN IP)
UNCLASSIFIED 1 United States Joint Forces Command Joint Warfighting Center United States Joint Forces Command Joint Warfighting Center LTC John Janiszewski.
1 Industry Advisory Council’s Enterprise Architecture Shared Interest Group (IAC EA SIG) Collaborative Approach to Addressing Common Government- Industry.
MVDC Collaboration MVDC Issues and Viability of Red Demo in Philadelphia.
Advancing National Wireless Capability Date: March 22, 2016 Wireless Test Bed & Wireless National User Facility Paul Titus Department Manager, Communications.
GORT Planning/Guidance Session with LTG Barclay
Megacities: Rebuilding A Roadmap for Sustained Collaboration, Learning, and Training Kevin M. Felix COL(R), US Army.
Guiding Principles The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter.
Marine Corps Transformational Concepts and Seabasing
Lesson 6 Technology Maturation and Risk Reduction Exercise Team #
NDIA Expeditionary Warfare Conference: Joint Seabasing Panel
Seabasing…Enabling Operational Maneuver from the Sea
Converting Naval Littoral Operations in a Contested Environment and Other Concepts to Doctrine NWDC Mr. Bob Oldani Doctrine Director (N5D)
Joint Protection of the Sea Base
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
Karen Bartleson, President, IEEE Standards Association
By Jeff Burklo, Director
Lockheed Martin Canada’s SMB Mentoring Program
NDIA / USMC War Game 2006 “Adapting to Change” Cell 1 Outbrief.
Cybersecurity ATD technical
U.S. Army Training and Doctrine Command
MODULE 11: Creating a TSMO Program Plan
Presentation transcript:

Connector Summit Results – Way Ahead Seabasing OAG – 22 July 2014 “The Connector Summit will firmly establish the Marine Corps as the clearinghouse for all things connectors” Connector Summit Results – Way Ahead Seabasing OAG – 22 July 2014

Agenda Summit Purpose/Endstate Planning Factors Methodology/Breakout Group Framework Summary Way Ahead

Summit Purpose/Endstate Purpose: Facilitate discussion and aggressively explore the full range and depth of future connector possibilities, to include innovative approaches to employing current connectors by involving stakeholders from both government and industry Endstate: Inform the development of future sea-based connector strategy with consideration given to: - Time to develop selected connectors - Technical maturity - Platform interoperability - Rough order of magnitude cost profiles - Rates of buildup of combat power ashore to meet selected scenario settings and mission requirements

Planning Factors Programs Concepts USMC supports current connector Programs of Record LCAC SLEP, SSC, SC(X)(R) Concepts Employment concepts contained in EF-21 Increased operating distances from ship to shore Multi-role/multi-mission connectors (intelligence, fires, logistics)

Recapitalization of primary surface ship to shore connectors Ship to Shore Mobility Recapitalization of primary surface ship to shore connectors SSC LCAC (SLEP) Ship to Shore Connector (SSC) replaces LCAC to retain high speed over the shore assault capability-- from sea basing ranges. Increased payload, temperature and sea state parameters (74 tons; 100 F; high SS 3) 72 craft procurement ~$ 4.1B through 2027 Under contract for detail design with options for the first 9 craft LCU-1610 Class SC(X)R >90% of MAGTF combat equipment is too large or bulky for delivery by vertical aviation. Organic ship-to-shore mobility undergirds naval expeditionary forward presence, force application and sustainment of forces ashore — from the sea . A sufficient mix of surface connectors is essential to ship-to-shore mobility. Landing Craft Air Cushion (LCAC): designed with a 20 year service life; IOC mid-1980s. Service Life Extension Program (SLEP) initiated in FY00 to extend a total of 72 craft an additional 10 years. An inventory of 72 LCAC generates 60 craft to support 2 MEB lift /Forcible Entry operations. After 2015 LCAC (SLEP) start to reach the end of the 30 year extended service LCAC (SLEP) are programmed to receive additional life extending updates to support ship to shore requirements until the Ship to Shore Connector (SSC/LCAC-100) reaches FOC ~ 2027. SSC designed is an evolutionary replacement to LCAC that addresses the increased operating demands of sea basing (payload, range at max load, temperature and sea state). (IOC 2020). Improves operational reliability correcting the 20 highest failure rate/most labor intensive LCAC repairs. Expands performance envelope to carry the M1A1 Main Battle Tank with Track Width Mine Plow from Sea Basing ranges and across a wider temperature and sea state spectrum. 74 tons from over 25nm at sea; 100-deg Fahrenheit; NATO Sea state 3 (4.1 ft significant wave height). For LCAC, > 60 tons is overload Landing Craft Utility (LCU) 1610 Class: Entered service in 1959 with a 25 year design life (32 craft still serving over 50 years later). Complements high speed LCAC with persistence (10 days/1,200 nm range), large flexible cargo capacity, high deployed operational availability, crane loadable to augment AFOE offload, LOTS. Suffering systemic system obsolescence and growing corrosion repair costs driving need to recapitalize (>50 years) . Surface Connector (X) Replacement (SC(X)R): will recapitalize the LCU-1610 Class. (IOC 2022) Seeking replacement of current operational capabilities. High speed or upgraded capabilities not part of the mission set we need to retain: that is what LCAC/SSC are for. SC(X)R will be the maximum lift, maximum interoperability, maximum utility surface connector, applicable at the high intensity end of the Range of Military Operations (ROMO), but a workhorse at the lower to middle level of the ROMO; where rotationally deployed expeditionary forces need mobility more than speed in support of HA/DR, TSC & Building Partnerships, NEO, riverine operations and sustainment of forces ashore, or re-postioning, re-supply or reinforcement of widely distributed units. Surface Connector (X) Replacement (SC(X)R) recapitalizes a rugged, persistent, economical, high capacity utility landing craft. Analysis of Alternatives in progress Anticipate 32 craft procurement beginning 2018 5

Connector Summit Break-out Group 1 Technical & Programmatic Survey Bin Interoperability - well deck (W); beach (B) - B+ goes onto beach; LO/LO (L); MLP (M); RRDF (R); Time TRL Hull form Design Maturity (Concept or Built) Hullform Material Component Material Propulsion Propulsion Method Speed Sea State External Dimensions (LxW/BxH) ft Length to Beam Ratio Draft (ft) /Beach Access Range (nm) UHAC ATF/MPF W, B+, L (top removed), M, R 4-5 years for prototype 5 D -Capative Air Cell 1/2 Scale Demonstrator   Gas turbine, diesel, or hybrid drives Captive Air Cell Tracks >20 >SS-3 L=92; B=48 1.91 6-8 / Amphibious, beach, marsh, mud flats. >200 Caimen-90 ATF W, B, L, M,R 2 years for production unit representative 4 D Design/Models Al N/A 3 diesels Waterjet 22 (loaded); 40 (light) Unrestricted up to SS-4 L=98; B=25 3.92 4.91 250 LCAT W,B,L FMS - 4-5 years 7 D / C Built/Fielded 4 diesel 18(loaded); 30 (light) SS-5 L=98; B=41.3 2.37 7.9 (Fully loaded Caterman); 3.37 (Fully loaded landing) 600 Concept A 3 years for production unit representative Design Steel 2 diesels Waterjet / Bow thruster 11.5 (loaded); 12.5 (light) SS-3 L=135; B=30 4.5 5.5 1,391 @ 8 kt LCU-Future A (Al) Concept developed at meeting - fast LCU made out of aluminum 1 LCU (Folding) ATF / Splass W, B, M,R Design Concept UNK Retractable twin props / stern-thrusters 19 (loaded); 20 (medium load) L=270 (unfolded) / 143 (folded); B=22 22.27 (unfolded); 6.5 (folded) 4.5 (unfolded); 5.5 (folded) 1500 @ 20 kt

BG#1 Technical Framework AMPHIBIOUS TASK FORCE MARITIME PREPOSITIONING FORCE Ultra Heavy-lift Amphibious Connector Caimen-90 L-Cat Concept A LCU-F Heavy Lift LCAC Hover Barge LC-Fast (A) UHAC Joint Universal Causeway Interface Module Improved Navy Lighterage System (INLS) Hover Barge LCU-F & LC-Fast (A) Transformational Craft (T-Craft) Army Watercraft (LCM-8, LCU-2000, LSV) Joint High Speed Vessel SHORE TO SHORE ENABLER (Splash/Landing) LCU-F (splash) Light Weight Modular Causeway System (LMCS) RRDF/LCAC, Flexible Sea-based Force Proj. (FSFP) Joint Universal Causeway Interface Module INLS & INLS - MLP Interface Advanced Mooring System Interface Ramp Technology (IRT) (SS3, JHSV) IRT (JHSV splash) float, LMCS base, removable FSFP (JHSV splash) Joint High Speed Vessel LCAC ramp & SSC ramp (splash) Sea train Havic (ACV high-speed sled) Caimen-200 Commercial Hybrid A/C (20, 90, 500 ton) Transformational Craft Army Watercraft (LCU-2000, LSV) Joint High Speed Vessel

BG#2: Operational Framework EF-21: future connectors are multi-mission/multi-role capable MEB as deployed base unit; Rein Company as base unit of employment1 ** Potential Decision Point Accept one or more types of connectors2? Assault connectors (AC) with primary mission of landing amphibious forces with speed and payload focus. Or… Support connectors (SC) with primary mission of supporting the landing force with payload over speed Cannot be a niche capability Open architecture design ** There was significant disagreement about whether or not a single connector could fill this requirement. 1. Must conduct a non-permissive landing with (2) Companies with organic vehicles from 65nm at sea state 3. (1) rein Rifle Co with organic vehicles 23 MPC/ACV (1) motorized/mechanized Company 4 Tanks with 8 LAVs This force must be landed in 2 waves within a period of darkness (8 hours). Other company landed via air. 2. There has not been a determination made to limit future connectors to a single design. Affordability may be the key driver here. Cannot be a niche capability Requires an Open architecture design Utilitarian vessel requires design to be multi-mission Must be able to accept modular capabilities

Future Connector Desired Capabilities ‘Beyond or Over the Beach’ capability requires study Connectors ISO EF-21 requires study Desired characteristics influence craft design (AC) Assault Connector to support landing Assault Echelon (SC) Support Connector to move bulk capabilities from Sea Base to shore (B) characteristics desired for both connectors If a single connector is pursued, all desired characteristics are applicable ‘Beyond or Over the Beach’ capability needs to be explored further This group not willing to confine future requirements by making a determination now Technology advancements may preclude specifying a particular capability now

Summit Summary Over 165 participants: Methodology (4 day Summit 11-14 March 2014): MCPP Framework w/following planning factors: USMC supports current connector Programs of Record- LCAC SLEP, SSC, SC(X)(R) Expeditionary Force-21 driven; connector enhancements; increased operating distances from ship to shore; multi-role/multi-mission connectors Problem Framing: 2 days of common briefs covering EF-21, ACV, current/US Army watercraft/foreign/possible connectors, hybrid airship technology, & potential connector enhancements COA Development: 2 days of breakout sessions (technical SMEs and operational employment SMEs) to determine capabilities development COAs for near and long term connectors and connector related applications Foreign Military: Netherlands, UK, France, Germany, Australia, Industry: Lockheed Martin, American Systems, GD NASSCO, Nichols Brothers Boat Builders, Fincantieri Marine Group, Textron, UK’s BMT Defence USMC: HQMC DCs, CD&I, MARFORs, MARSOC, MCIA, MCWL, MARCORSYSCOM USN: OPNAV, NAVSURWARCEN, NAVSURFLANT, NAVWARDEVCOM, NAVSEA, NAVBEACHGRU, NWC, PEO Ships Notable participants: MajGen Harry Jenkins (Ret), BGen David Reist (Ret)- Potomac Institute for Policy Studies, BGen Bruce Bynum (Ret)- OPNAV N81M, Mr James Harrison- NAVSEA, Dr Geoff Main- ONR, Mr Carl Murphy- OPNAV N95, Mr Arthur Rausch- PMS-385 R&D, Mr Donald Charity- DPMO-S&T, Dr Joseph Padula- ERDC Presenters (18 Common Briefs): Expeditionary Force 21 (Mr Doug King, Director Ellis Group) ACV (Col Woodbridge, G-3 TECOM) MARFORPAC/PACOM (Mr Chris Neff, MARFORPAC G-3) Current Surface Connector Programs (LtCol Todd Perry, OPNAV N953) ICMH Gripes, AAV Launch, LCAC on MLP, LCAC tender, SSC Ramp, Other Considerations (Mr Patrick Spring, PCD) Army Watercraft (Mr Dave Groves, SID) Hybrid Aircraft Technology (Mr Corey Cook, Lockheed Martin) BMT Caimen-90 & Caimen-200 (Mr Nick Johnson, UK BMT Defence) LCAT (LtCol Durville, FR LNO) Netherlands Connectors (Maj de Vries, NLD DoD) UHAC (Dr Geoff Main, ONR) Heavy LCAC (Mr David Vickers, NAVSEA PCD) LCU-F (LtCol Greg Wardman, Ellis Group) Enhancement Possibilities/Alternative Uses: JHSV Possibilities (Mr John Campbell, SID) LMCS (Dr Fowler, ERDC) INLS/ELCAS-M/Utility Boats (Mr Paul Bode, NAVFAC NEPO) MLP/Connector Interface/AFSB (Mr Tom Wetherald, NASSCO) Landing Force Scenario (Mr Ted Roofner, OAD)

Way Ahead (1 of 2) - Platform Integration. IAW Naval Board direction, fully explore alternative ships/platforms & connectors. - Concept Analysis & Wargaming. Leverage upcoming Naval Services Wargame to examine alternative platforms and connectors for engagement & littoral maneuver. - NAVSEA Support. Connector analysis and engineering support through NAVSEA Warfare Centers. Analyze LCAC ramp to determine potential engineering changes to enhance ACV splash capability. - Surface Connector Strategy. Refine and align with current PORs, Ship-to-Shore Connector and Surface Connector (X), LCAC and LCU replacements.

NAVSEA Warfare Center Ship to Shore Testing and Analysis AAV launch off LCAC stern- 1987 Connector throughput study 2003 Heavy Lift LCAC – 2004 SEABEE Lift of LCAC Mighty Servant 3 - LCAC Interface 2012 Gripe Study- 2010 Habitability Study 2012 Shock Mitigation studies - MK 5, NSW RHIB, LCAC Well Deck Thermal Testing and Analysis – LSD, LHD, and LPD 17 Shock-mitigated seat study LCAC motion characterization study for SSC

NAVSEA Warfare Center Connector Development, Analysis, Engineering LCAC and SSC Ramp Analysis, Design, Fabrication, and Testing Accommodate quicker and safer launches of AAV & potentially ACV Operational Planning , Throughput Analysis and Recommendations Modelling & Simulation/ Analysis of Physical logistics (well deck; connectors, non-connector platforms, cargo, MLP, Air Lift, MSC Support etc.) To include ship to objective and logistics supportability, identify bandwidth bottlenecks M&S/Analysis of C2 (Blue/Green Interfaces; data throughput--clogging the tubes), enhanced collaboration across the force Operational Planning Tool (shipboard cargo flow/connector movement) tool, *informed* by prior modeling, possibly linked to or supplementing JMPS-E Throughput/Tempo Enhancements Rapid gripes, lightweight gripes, training, decision support, SEAOPS, rapid cargo spotting tools Common Navigation software for Amphibious Connectors

Way Ahead (2 of 2) Request for Information to Industry: RFI posted in Jun on FedBizOpps to solicit white papers on systems/technologies applicable to EF-21 littoral maneuver capabilities. With ONR examine/assess RFI responses; deadline is 30 Aug. Pursue promising ideas. Conduct EF-21 ship to shore movement analysis In Conjunction with NAVSEA Warfare Centers: Determine if enhancements can be made to LCAC AAV/ACV launch capability Potential Near to Mid-term Enhancements: Lightweight Modular Causeway System Roll-on Roll-off Discharge Facility/LCAC Interface Flexible Sea base Force Projection Improved Navy Lighterage System/Mobile Landing Platform interface LCAC/SSC “station” concept Long Term: Identify leap-ahead “Connector After Next” ideas, designs & technologies Refine and update connector strategy POA&M for concept-based requirements Capabilities development DOTMLPF assessment Program Planning

Connector After Next Concept Based Desired Capabilities Development Framework EF-21: future connectors are multi-mission/multi-role capable MEB as deployed base unit; Rein Company as base unit of employment Connectors ISO EF-21 requires study ‘Beyond or Over the Beach’ capability requires study Potential Decision Point- Accept one or more types of connectors? Assault connectors (AC) with primary mission of landing amphibious forces with speed and payload focus. Or… Support connectors (SC) with primary mission of supporting the landing force with payload over speed Cannot be a niche capability; Open architecture design ‘Beyond or Over the Beach’ capability needs to be explored further This group not willing to confine future requirements by making a determination now Technology advancements may preclude specifying a particular capability now 1. Must conduct a non-permissive landing with (2) Companies with organic vehicles from 65nm at sea state 3. (1) rein Rifle Co with organic vehicles 23 MPC/ACV (1) motorized/mechanized Company 4 Tanks with 8 LAVs This force must be landed in 2 waves within a period of darkness (8 hours). Other company landed via air. 2. There has not been a determination made to limit future connectors to a single design. Affordability may be the key driver here. ** There was significant disagreement about whether or not a single connector could fill this requirement. Cannot be a niche capability Requires an Open architecture design Utilitarian vessel requires design to be multi-mission Must be able to accept modular capabilities

Connector After Next Concept Based Desired Capabilities Desired characteristics influence craft design: (AC) Assault Connector to support landing Assault Echelon (SC) Support Connector to move bulk capabilities from Sea Base to shore (B) characteristics desired for both connectors If a single connector is pursued, all desired characteristics are applicable: (AC) High Speed (AC) Support splashing/recovery amphibious self-deploying vehicles/small boats (AC) Adequate force protection (active/passive) (B) Range to conduct distributed/disaggregated operations (B) Reliable, maintainable, and sustainable (B) Compatible with current/future amphibious shipping (B) Joint/combined inter-operable (B) Reduced signature (B) Sustain long range navigation capability (B) Enhanced C2 capability for control (B) Rapid loading/unloading capability

Ability to breach landing platform or ice sheet from deep water. What is the Ultra Heavy-Lift Amphibious Connector (UHAC)? One-Half Scale Demonstrator Marsh Capable Deep water capable 25o Slope & debris-laden shore Amphibious and all-terrain mobility Mud Capable I think this audience has been aware of the UHAC from previous briefings. If not, here is a little of what it is: an LCAC-sized fully amphibious craft with the payload of an LCU and half the speed of an LCAC/SSC < 2 PSI ground pressure for low-impact environmental missions HMMWV Payload Unimproved roads Ability to breach landing platform or ice sheet from deep water.

UHAC Demonstration 1/2 Scale Test Results Larger scale mobility performance verified Speed/ power (Re-affirmed) Well-deck and MLP deployment and recovery Stable open-ocean transit and 360 rotation maneuver Landing on 25 degree slope, debris-laden shoreline Verified infinitely variable transmission low-speed maneuvers and high-speed sprint operation Payload (HMMWV) – ballasted to simulate M113, LAV 25, TEU 23

Established as required to address specific issues Connector Council CNO CMC When/If Required N95 N42 N81 PP&O CD&I PEO (Ships) ONR NSWC Quarterly Serve as the Executive Steering Group (ESG) to discuss findings/proposals as provided by the O6 led Council and provide guidance and approval. N953 N422 N81M POE SID PMS-377 ONR NSWC Monthly 06 level to discuss all facets of future connector analysis and experimentation, facilitate the exchange of new ideas, de-conflict efforts, allow prioritization of analysis, and align our strategic communication efforts relating to connector requirements. In advance of Council meetings agenda items, briefs and other products will be provided to the Council members to facilitate discussion. Council charter to be developed. Research Technology NSWC PCD NSWC CCD ADHOC Working Groups NSWC Carderock Established as required to address specific issues Coordination and Standing Relations SEA 05C/D Subordinate Activities

Derived from: Seabasing Joint Integrating Concept (JIC), 2005 What is a “Connector”? Connectors characterize the surface and vertical lift platform capabilities that are a critical component either organic to, or in support of, the sea base to transport personnel, supplies, and equipment within the sea base and maneuver them from the sea base to objectives ashore. Derived from: Seabasing Joint Integrating Concept (JIC), 2005

Connector Council - Purpose Alignment of effort and strategic communications Cross-enterprise engagement and shared awareness Evaluation in the larger context of warfighting needs and fiscal reality Understanding of the Marine Corps’ requirements in light of new ACV strategy Seek to maintain unity of effort among all stakeholders Advocacy for current PORs: ensure they remain on Track Determine appropriate pathway to connector “next”

Questions