Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Slides:



Advertisements
Similar presentations
LEGG PARK DOG PARK PROJECT DESIGN Prepared for: Meridian Township Parks Commission Board August 9, 2011.
Advertisements

4 Process Mapped and documented current conditions and trail use patterns Community outreach Seven initial public meetings were held at locations.
 Corridor Plan and Meeting Objective  Project Background  Short Term Improvements  Long Term Improvements/Corridor Planning  Construction Funding.
The Virginia Capital Trail
Titusville to Edgewater Bike Loop PD&E Study
Bon Secour National Wildlife Refuge. The Bon Secour NWR consists of 6,700 acres of wildlife habitat lying directly west of Gulf Shores, Alabama on the.
BRUCE FREEMAN RAIL TRAIL ARTICLES 22, 23, & ANNUAL TOWN MEETING.
A Plan for Billerica Center A Suggested Traffic Flow Pattern and Expanded Common That Will Provide A Safer, More Appealing, More Vibrant Billerica Center.
Sunflower Rail-Trails Conservany Sunflower Rail-Trails Conservancy is an alliance of rails-to-trails groups in the sunflower state.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Bring the Trail to Sudbury: Vision & Offer Friends of the Bruce Freeman Rail Trail September 22, 2011 Rail Trail Conversion Advisory Committee Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP) Stow Planning Board Meeting October 19, 2010.
Cornville Community Park Conceptual Design Recreation Area and Facility Design Class April 9, 2008.
Article 49 - Davis Field Park & Recreation Commission Town Meeting May
PROPOSAL FOR PORT ST LUCIE RAILWAY STATION SERVING FT PIERCE AND JENSEN BEACH LOCATED AT WALTON ROAD. ACCESS TO CROSSTOWN PARKWAY AND SE GREEN RIVER PARKWAY.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
U.S. Fish & Wildlife Service Contact Information Bob AdamcikBob Adamcik Wildlife Biologist Branch of Wildlife Resources Washington, D.C.
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
CONSERVATION COMMISSION TRAILS come in all shapes and sizes based on community need and vision.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Vision Investment Proposal. Meeting Vision Renewal Goals QUALITY OF LIFE CONNECTIVITY HEALTH.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
Spokane River Riparian Enhancement Project at State Line.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Transportation Programs. Habitat and Wildlife Habitat Connectivity Restoration Mitigation Wildlife Human Safety Crossings.
Article 32 Thoreau Street & Sudbury Road Article 32: To determine whether the Town will vote to appropriate the sum of $150,000, or any other sum, for.
RANCHO PALOS VERDES WELCOME Vision Plan and Public Use Master Plan Visioning Workshop June 3 rd, 2006.
Dorchester Coast Greenway: A Master Plan Final Presentation April 20, 2011 Field Project Team #4 Ronak Davé Renee Guo Christina Kim Jessie Partridge.
East Coast Greenway Connecting Urban Centers, Train Stations and Greenways in Northern Delaware Delaware Trail Summit - February 25, 2010 On the Map: Regional.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
Category Extent ElementMetric MeasuredReport by BasinProvinceSubbasin Vegetation & Wildlife Habitat Type XShrub-steppeChange in acres from one time period.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
City of San Antonio, Texas International Downtown Association 2013 Downtown Achievement Awards Planning.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
Nicodemus National Historic Site Visitor Center Site Selection Study and Environmental Analysis.
Alternative Transportation at Grand Teton. 310,000 acres Includes 40 mile long Teton Range Connects Jackson to J.D. Rockefeller, Jr. Memorial Parkway.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
1. Look for an opportunity: It’s not always obvious. 2. Know what you have: Assess current conditions and issues. 3. Know the rules: Historic preservation,
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Preserving Smithsonian Treasures Building, Operating & Maintaining its Facilities Office of Facilities Engineering and Operations (OFEO) SAME DC Post August.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Livingston County Transportation Connectivity Plan Final Report December 2013.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
 The Pedestrian Plan is:  Long Range and Comprehensive  Conceptual  A Vision for the Future  The Plan is not:  Regulatory or Binding  A Master.
Track # Case Study Trail of the Coeur d'Alene Challenges.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Innovation North-Side Neighborhood Access Feasibility Study
Warrant Committee Open Hearing March 20, 2017
Complete Streets: Making Connections
Draft Transportation Element September 6, 2017
Transportation Alternatives (TA) Set-aside
Recreation and Trails Assessment
State Aid Standards Development
Moving Towards a Smart City Traffic Services Initiatives
Federal-aid Highway Program
Presentation transcript:

Preserve Sudbury Vote NO to the Rail Trail Articles 22-24

Sudbury needs a Vision first Preserve Sudbury Vote NO 22

Preserve Sudbury ►Beyond “Investigation” Feasibility Study + Title Review (Art. #22) + Base Map (Art. #24) = MassHighway Design Requirements 22

10 – 14 ft Path Width 2 – 3 ft 3 – 5 ft RecoveryShoulder Preserve Sudbury Sudbury Feasibility Study Cleared 6 ft Cleared 6 ft 10 ft MassHighway Design 22

MassHighway’s Vision? Preserve Sudbury Assabet River Rail Trail in Hudson 22

... or Sudbury’s Vision? Preserve Sudbury Rail bed in Sudbury 22

Will the articles resolve unanswered questions? Preserve Sudbury Feasibility Study Goals: (Promised at Town Meeting 2005) Impact on traffic ? Policing costs ? Maintenance costs ? Impact on the community both long term and short term ? 22

Preserve Sudbury - Significant Investment $615,000 minimum CPA “Installments” $25k $170k $285k $615k Consider Funding 22

Consider Traffic & Safety Preserve Sudbury - 11 Intersections Rail bed Hudson Road (Sudbury Feasibility Study) 22

Consider the Environment - Clearing 12 Acres of Vegetation Preserve Sudbury ~22 ft Rail bed in Concord 22 Assabet River Rail Trail Cleared ~50 ft

Consider Alternatives Assabet River National Wildlife Refuge Preserve Sudbury Managed Refuge No Intersections NO COST 6+ Miles of trails Visitor Center VC Sudbury Entrance Hudson Rd Connects to the Assabet River Rail Trail Assabet River Rail Trail 2,200 acres 22

Preserve Sudbury RefugeBFRT Wildlife/Habitat Monitoring Dedicated Parking Bathroom Facilities Connection to Assabet River Rail Trail No Dangerous Intersections No Construction Costs No Maintenance Costs No Policing Costs X The Safe Alternative X X X X X X X Please Vote NO – Preserve Sudbury 22