1 3. Process Flow Measures Problem 1 (a) 1. Time Travelers Insurance Company (TTIS) processes 12,000 claims per year. The average processing time is 3.

Slides:



Advertisements
Similar presentations
2.07.
Advertisements

Problem1; Admission Flow
Process Flow Analysis The Little’s Law The main source for preparing these slides is Managing Business Process Flow Anupindi, Chopra, Deshmoukh, Van.
Three Key Process Measures: Flow Rate
Waiting Lines CrossChek Sporting Goods’ Golf Division gets requests-for- quotes for custom-made golf clubs at a rate of about 4 per hour. Each of these.
Julian Archer Shannon Cummings Ashley Green David Ong.
Copyright © 2012 by Kyrano Corporation. 1 Click.
3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice
Interpreting graphs Objective: To be able to read and plot graphs of real-life problems.
Optimization Problems
Interpreting Graphs and Tables
1. Quality of the supper market is judged based on Quality of individual products Exterior and interior physical look of the store Effectiveness and efficiency.
INDR 343 Problem Session
Waiting Lines CrossChek Sporting Goods’ Golf Division gets requests-for- quotes for custom-made golf clubs at a rate of about 4 per hour. Each of these.
Readings Readings Chapter 11, Sections 1, 2, 3, 5 Waiting Line Models.
Waiting Lines Example-1
Inventory Control Inventory: A stock of materials kept for future sale or use.
Operations Management: Process Analysis and Applications Module
IV. Little’s Law and Labor Costs
Process Analysis and Applications Module
Kristen’s Cookies.
Problem 8.4 K = ∞ R i = 60/4 = 15 /hr T p = 3 min = 0.05 hour c= 1 R p = c/Tp = 20 /hour Both Ti and Tp exponential Server $20 /hr Phone $5/hr Wait cost.
Write the percent formula. percent x whole = part Exercise.
1 3. Process Flow Measures Process Flow Analysis-Basics 1 Ardavan Asef-Vaziri June/2011 Five Elements of the Process View Inputs Outputs Goods Services.
Warm Up Describe your location in the classroom using specific reference points around you that someone could use as directions to find you if they walked.
Road Trip! Holidays are almost here. Your family has decided to go on a road trip for two weeks and are letting you decide where you will go! You will.
Interpreting Graphs and Tables
Supply Unit 5.
Classifying optimization problems By the independent variables: –Integer optimization --- integer variables –Continuous optimization – real variables By.
The mean of a set of observations is their ordinary average, whereas the mean of a random variable X is an average of the possible values of X The mean.
A Venture into Business Chapter Employees are part of the Company 4-2 Fluctuating Factors of Production 4-3 Cost, Revenue, and Profit Functions 4-4.
Theory of Production and cost Week 4. Theory of Production and Cost  Short and Long run production functions  Behavior of Costs  Law of Diminishing.
PRODUCTION Microeconomics Made Easy by William Yacovissi Mansfield University © William Yacovissi All Rights Reserved.
Interpreting Graphs 5-2. You can use a graph to show the relationship between speed and time, time and distance, or speed and distance.
2-3 Interpreting Graphs Use the table for problems 1 and In which week did Alicia save the most? 2. How much did Alicia save in all? week 3 $25 Bell.
Ch 6 Tech Notes OBJECTIVES
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
Secrets of a Market Maker Presented by Andrew Keene.
Warm Up Turn to page 25 in your textbook Read “Consumer Action” What can Yolanda do to help her business be more profitable? How will she know if her price.
THE NORMAL DISTRIBUTION AMIN SOKHANVAR
Chapter 10 Motion Notes. Definition of position An object’s location.
6.01 Inventory Control Methods
Reading 5 Week 2, day 4. Today: Overview Roll call & Announcements Finish NorthStar 3, Unit 1 SAD reading Reading Skills.
Pg. 40 #13-24 ANSWERS.
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines3 Example: The arrival rate to a GAP store is 6 customers per hour and has Poisson distribution.
Sunrise Coffee Company Environmental and Social Satisfaction.
WAYS BUSINESSES COMPETE It’s a dog eat dog world!.
Live On Site Chat! Increase your ROI by getting more customers from your website traffic!
Speed: Average Velocity: Instantaneous Velocity:
INTRO TO DISTANCE, DISPLACEMENT, SPEED, VELOCITY QUIZ REVIEW.
Elapsed Time Using An Open Timeline. What time will it be in 3 hours? 5:158:15.
1 3. Process Flow Measures 1. Coffee Shop You enter a Starbucks coffee shop. You have experienced that in this time of day the entrance door opens two.
Chapter 9: Markov Processes
FOR MORE CLASSES VISIT  Circular Flow Diagram. Explain how the circular flow diagram relates to the current economic situation.
Frames of Reference.  Displacement is a _______________ line distance between where something ______________ and where it ends.  Average velocity is.
ECO 204 ASSIST Inspiring Minds/eco204assist.com
ECO 204 Help Bcome Exceptional / eco204.com
6.01 Inventory Control Methods
Interest, Mixture, Uniform Motion, Constant Rate Jobs
Exercises Which reasoning process is shown? Explain your answer.
Total Distance & Particle Motion
Every minutes one customer comes in and one customer leaves.
Entrepreneurship Week 5 Competition.
Entrepreneurship Week 7 Competition.
1-9 Interpreting Graphs and Tables
Speed, Velocity, and Acceleration
READING, WRITING & SKETCHING
Additional Example 1A: Matching Situations to Tables
A film starts at 13:45 and lasts for 1 hour and 35 minutes
Chapter 4: Conditional Probability
Presentation transcript:

1 3. Process Flow Measures Problem 1 (a) 1. Time Travelers Insurance Company (TTIS) processes 12,000 claims per year. The average processing time is 3 weeks. Assume 50 weeks per year. a) What is the average number of claims that are in process? R per week = 12,000/50 = 240 claims/week RT = I I = 240(3) = 720 claims waiting

2 3. Process Flow Measures Problem 1(b) 50% of all the claims that TTIS receives are car insurance claims, 10% motorcycle, 10% boat, and the remaining are house insurance claims. On average, there are, 300 car, 114 motorcycle, and 90 boat claims in process. 720 car motorcycle boat house b) How long, on average, does it take to process a car insurance claim? I = 300 car R = 0.5(240) =120 claims/wk TR = I T(120) = /120= 2.5 weeks

3 3. Process Flow Measures Problem 1(c) c) How long, on average, does it take to process a house insurance claim? Average # of claims in process = –300 car–114 motorcycle–90 boat = 216 Average # of claims for house: I = 216 House claims are = 0.3 of all claims R = 0.3(240) = 72 TR = I T = I/R T = 216/72= 3 weeks

4 3. Process Flow Measures Problem 2 2. Consider a roadside stand that sells fresh oranges, and fresh orange juice. Every hour, 40 customers arrive to the stand, and 60% purchase orange juice, while the remaining purchase oranges. Customers first purchase their items. Customers that purchased oranges leave immediately after purchasing their oranges. Any customer that ordered orange juice must wait while the juice is squeezed. There are 3 customers on average waiting to purchase either oranges or orange juice, and 1 customer on average waiting for orange juice to be squeezed (40) = 24

5 3. Process Flow Measures Problem 2 How long on average must customers that purchase fresh orange juice wait? In the ordering process RT =I  40T = 3  T = 3/40 hours  T = 60(3/40) = 4.5 minutes In the juice squeezing process RT =I  24T = 1  T = 1/24 hours  T = 60(1/24) = 2.5 minutes Average waiting time = T = = 7 minutes

6 3. Process Flow Measures Problem 3(a) 3. A recent CSUN graduate has opened up a cold beverage stand “Stop n Slurp” in Venice Beach. She takes life easy and does a lot of surfing. It sounds crazy, but she only opens her store for 4 hours a day. She observes that on average there are 120 customers visiting the stand every day. She also observes that on average a customer stays about 6 minutes at the stand. a) How many customers on average are waiting at “Stop n Slurp”? R = 120 in 4 hours  R = 120/4 = 30 per hour R = 30/60 = 0.5 per minute T = 6 minutes RT = I  I = 0.5(6) = 3 customers are waiting

7 3. Process Flow Measures Problem 3(b) She is thinking about running a marketing campaign to boost the number of customers per day. She expects that the number of customers will increase to 240 per day after the campaign. She wants to keep the line short at the stand and hopes to have only 2 people waiting on the average. Thus, she decides to hire an assistant. b) What is the average time a customer will wait in the system after all these changes? R = 240/(4hrs*60min) = 1 person/minute I = 2 Average time a customer will wait: T = I/R = 2/1 = 2 minutes

8 3. Process Flow Measures Problem 3(c) The business got a lot better after the marketing campaign and she ended up having about 360 customers visiting the stand every day. So, she decided to change the processes. She is now taking the orders and her assistant is filling the orders. They observe that there are about 2 people at the ordering station of the stand and 1 person at the filling station. c) How long does a customer stay at the stand? R = 360/4 hours = 1.5 people/minute I = 2 (ordering station) and 1 (filling station) = 3 RT = I  1.5T = 3  T = 2 minutes 360/4hrs 21

9 3. Process Flow Measures Problem 3 A recent UCLA graduate has opened up a competing cold beverage stand “Slurps-on-the-go”. The UCLA grad is not as efficient as the CSUN grad, so customers must stay an average of 15 minutes at “Slurps-on-the-go”, as opposed to 6 minutes at the “Stop n Slurp”. Suppose there is an average of 3 customers at “Slurps-on-the-go”. The number of customers requiring slurps each day remains at 120, as it was before the marketing campaign. But now the 120 is divided between the “Stop n Slurp” and “Slurps-on-the-go”.

10 3. Process Flow Measures Problem 3(d) d) By how much has business at the “Stop n Slurp” decreased? First find how many customers “Stop n Slurp” is losing to “Slurps-on-the-go” At “Slurps-on-the-go” we have I = 3 people and T = 15 minutes TR = I  15R = 3  R= 1/5 per minute R = 60(1/5) = 12 customers per hour or = 48 customers/day Business at “Stop n Slurp” has decreased by 48 customers/day The new (lower) arrival rate to the “Stop n Slurp”? = 72 customers/day

11 3. Process Flow Measures Process Flow Example e) What is now the average number of customers waiting at the “Stop n Slurp”? R = 72/day = 72/(60min*4hrs) = 0.3/minute T = 6 minutes RT = I  I = 0.3(6) = 1.8 customers