 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.

Slides:



Advertisements
Similar presentations
Antiproton Lens Replacement Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target Station Group.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
NuMI Target Pile Fan Repair Michael Andrews 3/15/10.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
Full Process: From Application to Finalization
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
AD ops. - NUMI July 7, 2006 Jim Hylen/FNAL Page 1 Had been having problem with water collecting in tank under horn 1, instead of coming back to surge tank,
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Completion of the MICE-US construction project
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
News and brief overview of Beamline plans for the next few months
2K CB FDR Overview:  Agenda, Charge, Review Process
DESIGN STATUS PREX II Alan Gavalya 15DEC14.
Presentation transcript:

 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium backpressure > water pressure in target canister from 4/2005 through 8/2006  NT-02: Operated 6E20 POT with no indication of internal or external water leak (9/2006 through 7/2009)  NT-03: Operated 9/2009 through 5/2010; canister backpressure lowered from 23.5 psig to 12 psig 12/2/2009; experienced internal event May 2010 (internal water leak)  NT-04: Operated 8/2009 with 5 psig helium backpressure to align with pressure vessel code requirements and expected ANU operating parameters; operated for < 1 week with internal pressure event 9/9/2010 related to internal water leak  NT-05: Operation 11/1/2010 with 23.5 psig helium backpressure; developed internal helium leak into water system after 10 days operation on 11/11/2010; operated until appearance of a large external water leak 2/24/2011 NuMI Low Energy Target Brief Operational History Special Report NuMI Target Updates Special Report NuMI Target Updates Kris Anderson 07-Mar-2011 Kris Anderson 07-Mar-2011

 Of the 5 targets thus far, 3 quickly developed internal water leaks and only NT-02 has operated with a significant amount of POT and functioned without evidence of an internal water circuit leak  NT-02 exhibited loss of ν yield (~15% at peak) which may be due to radiation damage in the graphite fin structure  NT-02 currently has a frozen target z-drive mechanism  NT-02 currently resides at CO/RHF NuMI Low Energy Target Operational Summary Special Report NuMI Target Updates Special Report NuMI Target Updates

Special Report NuMI Target Updates Special Report NuMI Target Updates NuMI Low Energy Target General Assembly Layout Downstream Water Turnaround Weldments

Special Report NuMI Target Updates Special Report NuMI Target Updates

Special Report NuMI Target Updates Special Report NuMI Target Updates Current Activities- The Work I.Target Hall Activities Have moved used targets NT-03 and NT-04 to TSB (empty TH morgue) Prepare for installing next target on module and resuming operations II.Autopsy of NT-05 in Target Hall Workcell- Necessary to confirm NT-06 rework approach and procurement of NT-07 and NT-08 spare targets from IHEP Document as is condition with photographs and smoke leak test Cut off DS target snout (~6”) to expose water turnaround circuit and smoke leak test; cutting tool tests successful and ALARA plan in review Determine if other internal leaks are present III.Reclaim NT-02 as a contingency spare Still leak tight? Install target z-drive input shaft Unstick z-drive (we think DS bearing block is frozen) IV.NT-06 Retrofit

Special Report NuMI Target Updates Special Report NuMI Target Updates Current Activities- Timeframe I.Target Hall Activities Not on the critical path for resuming operation Morgue is empty and module will be ready to accept next target by 3/18 II.Autopsy of NT-05 in Target Hall Workcell Final cutter tests and approved ALARA plan expected by 3/9 Module with NT-05 will move to workcell 3/9 Document as is condition, cut snout, and smoke test 3/10 to check DS end as possible leak location Additional autopsy contingency thru 3/14 to check for other US leaks NT-05 to morgue 3/15 III.Reclaim NT-02 as a contingency spare- ALARA Plan Under Review Start leak check of NT-02 on 3/8 pending approval of procedure and ALARA plan If leak tight, install US z-drive coupling and recover z-drive motion IV.NT-06 Retrofit If autopsy of NT-05 shows leak at downstream end, start removal of target core from NT-06 casing on Friday 3/11 Schedule Estimate Schedule Estimate

Special Report NuMI Target Updates Special Report NuMI Target Updates Estimated Key Dates-Nominal Scenario with No Major Problems I. NT-02 Path (Contingency Target) NT-02 (if reclaimed) could be ready to move to Target Hall: Friday 3/18 (decision date) Complete installation of NT-02 into chase, beam scan, ready for normal beam operation: Monday 3/28/2011 II. NT-06 Path NT-06 rework complete 3/31 Install NT-06 in carrier, survey and final QA complete 4/8 Complete installation of NT-06 into chase, beam scan, ready for normal beam operation: Monday 4/18/2011 Key Dates

Contingency Slide for NT- 06 Retrofit Proposed Retrofit