Drip System Approvals: County Perspective October 19, 2010 2010 Onsite Water Conference Anne Lowry, REHS Chatham County Environmental Health.

Slides:



Advertisements
Similar presentations
Septic Tank, Grease Trap, and Holding Tank Standards and Specifications AOWA:Basic Installer Course1 (1)A new, replacement, or repaired septic.
Advertisements

Waste Treatment – Septic Systems Lab #7. Objectives  Know how a conventional septic system works.  Be able to describe three alternative systems that.
Wastewater Collection (Sewer Alternatives). Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs.
Alternatives to Aboveground Effluent Disposal Mounds Overview of the NoMound ® System Technology.
Community Land-Based Wastewater Disposal in Pennsylvania Prepared by: Mr. Brian Oram, PG Wilkes University
Land Use Program Septic System Overview Scott Weldon
WASTEWATER DISPOSAL WITH SUBSURFACE DRIP IRRIGATION Donald R. McDonald AgTech Pacific.
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
DRIP DISPERSAL SYSTEMS Problems and Solutions. Flow Equalization Surges in the ATU during peak loading are a major cause of filter clogging in a drip.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
SEPTIC SYSTEM DESIGN. SEPTIC SYSTEM DESIGN Ken Stratton.
Flow Equalization Tanks Presented by Keith Surface.
The New Mexico Environment Department The Department’s Mission is to provide the highest quality of life throughout the state by promoting a safe, clean,
BS9990 : 2015 Updates and/or Changes
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
N.F.P.A. 13R Justin Bohlmann FIR-204.
Microirrigation design Oregon NRCS Engineering Meeting January 11-14, 2005 Natural Resources Conservation Service NRCS United States Department of Agriculture.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
3rd Annual Harris County On-site Wastewater Seminar
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Basic “need-to-know” for Advantex AX-20 pretreatment systems.
USING THE NEW REGULATIONS DESIGNING OWTS… Prepared for the Colorado Professionals in Onsite Wastewater (CPOW) 2014 Conference by Roger J. Shafer, P.E.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Basic “need-to-know” for MicroFAST pretreatment systems. Specific requirements for MN applications.
Hydraulics For The Long Term
SITE EVALUATION BASICS OF THE TRADE. Ken Stratton.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 7: Existing Septic Systems: Inspections and Corrective.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Basic “need-to-know” for Anua Puraflo Bottom draining peat filter systems. Specific requirements for MN applications.
My septic system is working just fine! New State Wide Rules Began 1 st of 2015 replacing the 1977 code Goals Update system designs to currently available.
Basic Treatment Train Diagrams Keep in mind…variations are ALWAYS possible.
“Soil Wetness Modeling Rules for Sewage Treatment and Disposal Systems in North Carolina” by Barrett L. Kays, Ph.D., NCCHS Steven Berkowitz, P.E., NCDENR.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 3: Site Evaluation and Selection 1 MA PHIT- Wastewater.
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Drip Irrigation Systems By: Philip Hanrahan and Matt Garrity.
An Inspector’s Primer Larry Johnson Harris County Larry Johnson Harris County.
Matthew Johnson Harris County Matthew Johnson Harris County.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Ordinance 480-YYY Modifications to Zoning Ordinance 480 regarding On-Site Sewage Facilities (OSSF)
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Soil Considerations for Utilization of Drip Dispersal in Tennessee Division of Ground Water Protection TN Department of Environment and Conservation.
Microirrigation design Oregon NRCS Engineering Meeting January 11-14, 2005 Natural Resources Conservation Service NRCS United States Department of Agriculture.
Septic System Overview
Cross Connection Survey Training
Chuck Cousino, REHS Onsite Wastewater Program Coordinator
HOS1010C - Introduction to Horticulture
Homeowner Responsibility
What is an on-lot sewage system?
Maintenance of the On-Lot Sewage System
BRENT LAWSON STATE PLUMBING INSPECTOR SUBSURFACE WASTEWATER
Private Septic Systems
Private Septic Systems
Presented by: Jon Bellamy
What to Expect When You’re Inspected
Homeowner Responsibility
WSUP (Lightning W Tank #2)
Presentation transcript:

Drip System Approvals: County Perspective October 19, Onsite Water Conference Anne Lowry, REHS Chatham County Environmental Health

Drip System Siting Criteria Drip System Sizing Drip System Design Criteria Drip System Installation & Testing Drip System Operation, Maintenance, and Monitoring Requirements

Soils 18-20”: – Fill System – Anaerobic Drip Type of Drainfield Fill System

Only American Manufacturing (Perc-Rite) has approval for Anaerobic drip system. Anaerobic Drip Systems **(Anaerobic drip is designed without pretreatment)

Siting Criteria for Anaerobic Drip Systems Requires:  Minimum of 18” of useable naturally occurring soil above an UNSUITABLE soil horizon, rock, or a soil wetness condition.  12” vertical separation from bottom of trench to UNSUITABLE soil horizon, rock, or soil wetness condition.  A special site evaluation if Group IV soils are encountered within 18” of the naturally occurring soils surface.

Siting Criteria for Anaerobic Drip Systems 18” Suitable Soil Group IV soils within 18” (need special site evaluation) Installation depth 6” 12” vertical separation

Drip Video

Soils 13-18”: Pretreatment with drip disposal Type of Drainfield

Pretreatment Options Gravel Bed Peat Filter Fabric Filter Sandfilter Pretreatment Units

Effluent Treatment Standard Minimum Soil Depth Vertical Separation Distance NSF 4018”12” TS I15”9” (12” for rock or tidal water) TS II13” (for Perc Rite) 15” for Geoflow 6” (12” for rock or tidal water) Aerobic Drip Siting Criteria Pretreatment Drip Soil Depth Requirements:

Aerobic Drip Siting Criteria 13’ 18” NSF 40 Geoflow Perc Rite 15”

Aerobic Drip Siting Criteria Horizontal Setbacks: Public water supply WS-1 Streams & S.A. Waters Other Coastal Waters Streams, canals surface water Drainage systems: upslope/sideslope/ downslope Any other nitrification field.1900 Rules , 15, 2520 NSF , 15, 2520 TS I , 10, 2010 TS II , 10, 1510

Aerobic Drip Siting Critera  Reductions in horizontal and vertical setbacks cannot be taken concurrently when installing drip systems except for drainage systems setbacks (interceptor, foundation drains, diversion)

Aerobic Drip Sizing Special Site Evaluation Detailed descriptions of soil profiles and soil morphological Description of landscape position Location and depth for placement of the trenches Recommended LTAR Hydraulic conductivity tests, lateral flow analysis, Proposed site-specific requirements for system design, installation, site preparation, modifications,  Additional Special Site Evaluation Requirements in.1970 (p)(2)

Aerobic Drip Sizing  Drip systems treated to TS I or more stringent standard on sites with less than 18” of suitable soil shall not exceed the lowest LTAR of the soil group: Soils GroupLTAR Maximum w/ Reduced setbacks (horizontal or vertical) Group I.8 Group II.5 Group III.2 Group IV.1

Aerobic Drip Sizing Minimum square footage: – Design daily flow ÷ LTAR = Square footage – Ex. 360 design flow ÷.1LTAR = 3600 sq.ft.

Aerobic Drip Sizing Minimum drip tubing length: Square Footage ÷ 2 Feet = Drip tubing length Ex Sq.Ft. ÷ 2 Feet = 1800’ Drip tubing length

Aerobic Drip Design Criteria  Requires:  Pretreatment prior to drip emitter system to reduce BOD and TSS to 30mg/l each.  Dosing tank must be the same size as is required for the septic tank.  Floats must be adjustable from ground surface with out entering tank.  Must have audio visual alarm.  Must have self cleaning filters

Pretreatment Options Gravel Bed Peat Filter Fabric Filter Sandfilter Aerobic Drip Design Criteria Pretreatment prior to drip emitter system to reduce BOD and TSS to 30mg/l each.

Aerobic Drip Design Criteria Floats adjustable from ground surface

Aerobic Drip Design Criteria Audio/Visual Alarm

Self Cleaning Filters Disc Filter Screen Filter

Headworks

Aerobic Drip Design Criteria Processing and Control Unit Requires: – Must be able to be programmed to deliver design volumes to each field at specified intervals (flow equalization) – Must include automatic flushing of filters and laterals – Must have ETM and CC for each zone – Must keep record of flow – Must be 36” above grade – Telemetry if design flow is above 600gpd

Control Panel

Aerobic Drip Design Criteria Headworks Box The Headworks box includes filters, backwash valves, field flush valve and flow meter. Headworks components shall be in a separate enclosure that is freeze protected, UV and corrosion resistant Design shall facilitate reasonable access to all internal components.

Aerobic Drip Design Criteria Drip Field Design Drip tubing shall have pressure compensating emitters Drip tubing shall effectively inhibit root growth Pressures must be able to maintain a minimum of 7-60psi during dosing

Aerobic Drip Design Criteria Drip Field Design Lines shall be installed level +/- 2” in any linear segment on 2’ centers. May reduce center to center spacing to 1.5’ to avoid field obstructions (trees, rocks) Connection lines shall be conveyed over earthen dams with at least 2” higher than drip lines. When slopes exceed 10% check valves shall be used in supply and return manifolds.

Aerobic Drip Design Criteria Drip Field Design Scour velocity of 1.2 feet per second minimum during dosing & flushing Minimum pressure of 10psi during flushing ?? Maximum of 60 psi during dosing Air vent, check valve, solenoid valves at high point of each zone. Pressure monitoring fittings at field inlet and outlet Valves & cleanouts shall have protective vaults/boxes

Schrader Valves in Field to check pressure head in field

Drip System Installation

Aerobic Drip Installation & Testing Procedures Preconstruction conference required – Local Health Department – Engineer (Manufacturer Authorized) – System Designer (Manufacturer Authorized) – Grade Level IV Installer (Manufacturer Authorized) – Licensed Soil Scientist

Aerobic Drip Installation & Testing Procedures All tanks are to be water tested into risers Field must be flagged prior to installation 6” minimum soil cover over drip tubing

Aerobic Drip Installation & Testing Procedures Blanking: – Blanking sections are not be included in linear footage total – 6” of soil cover must be maintained over blanking sections. – Blanking should be installed at same elevation as drip tubing If blanking is not able to maintain same elevation then the blanking shall go above in elevation around obstruction.

Aerobic Drip Installation & Testing Procedures Start up attendees: – Local Health Department – Engineer (Manufacturer Authorized) – System Designer, if applicable (Manufacturer Authorized) – Grade Level IV Installer (Manufacturer Authorized) – Licensed Soil Scientist – Operator in Responsible Charge

Aerobic Drip Installation & Testing Procedures EngineerLSSInstallerORC

Aerobic Drip Installation & Testing Procedures Start up: – Conduct required start up checks on pretreatment unit. – Check alarms (audio/visual) for dosing tank and recirculation tank, if applicable – Check grade around tanks – Check UV light, if applicable – Check Headworks box

Aerobic Drip Installation & Testing Procedures Start up: Supply line shall be flushed prior to start up Run each zone dosing and flushing at design times Measure flow rates during dosing and flushing Measure field pressures during dosing and flushing Walk field during dosing and flushing to verify no leaks

Aerobic Drip Installation & Testing Procedure Start up: Vegetative cover must be established over field Check for settled areas over drip tubing, add soil as needed Finished grade shall allow for shedding of surface water

Aerobic Drip Installation & Testing Procedures Prior to issuing Operation Permit: Maintenance contract signed by manufacturer approved ORC and property owner must be submitted to the LHD Engineer/Designer must submit written certification that system was installed as designed. Manufacturer/Manufacturer Representative must submit confirmation of their acceptance of the system installation. Licensed Soil Scientist must submit written certification that the installation was in accordance with their specified site/installation requirements.

Aerobic Drip Operation, Monitoring, & Maintenance Inspection frequency for the first year is quarterly, two times per year there after Inspections shall include: Flushing rates & pressuresDocument flow meter Checking/cleaning filtersDocument ETM & CC Measure dosing rate to each zoneVisual observation of drip field

Questions??