1 Matthew Johnson Harris County Matthew Johnson Harris County

2 Topics to be discussed today Scheduling an Inspection Inspection Preparation Inspection of System Inspection Results Follow Up/Power Release Focusing on field inspections for systems trying to obtain an Authorization to Operate (ATO)

3 Scheduling an Inspection Permit is already obtained from Harris County Installer has installed system and is ready for first inspection Must schedule the inspection no later than the day before the inspection and not later than 3:00 p.m. Inspection Hotline: 713-956-3035 Or Schedule Via Website:

4 hcpid.org/permits

5

6

7 Inspection Preparation Gather Documentation: Design Summary Flow Diagram Approved Plans, including site layout Maintenance Contract (if applicable) Electronic Monitoring Registration Sheet (if applicable)

8 Inspection Preparation Systems Located within 100-Year Floodplain Additional Documentation Required: Elevation Certificate Floodplain Maps Buoyancy Calculations

9 Inspection Preparation - Water Wells Additional Documentation that may be Required: Water Well Log (if applicable) Well Plugging Report (if applicable)

10 Inspection Preparation Gather Inspection Tools You’ll need: Level Measuring Wheel Measuring Tape Probe Personal Protective Equipment (safety vest, safety hat, safety glasses, rubber gloves)

11 Inspection Preparation HCAD (Tax) Map Key Map Location Set Up Appointment Time with Installer Now you’re ready to go!

12 Inspection of System Verify the Plans with the Site Conditions Meet with the Installer to get necessary documents from them As-Built (if necessary) Any forms missing from pre-inspection research(ex: contract, water well log, etc.)

13 Verify the Plans with the Site Conditions

14 Inspection of System Expectations of the Installer The system must be ready to be tested Tank excavations must be left open to verify proper pad construction/material Backfill of excavations must be with proper material Sewer pipe trenches from structure to tanks must be left open to verify proper pipe material and size Installer must be on time or within the window of inspection time given

15 Backfill of excavations must be with proper material

16

17 Inspection of System Begin at the structure Verify two-way cleanout Verify piping material acceptable Continue through system Verify 1/8 inch fall in pipe from structure to tank

18 Inspection of System At the Tanks Verify inlet and outlet tee’s in trash tank Are all tanks & chlorinator on Harris County (or your entity’s) approved tank list? Verify tanks are level Are the air compressors & diffusers working properly? Check alarm floats and pump floats

19

20 NTS

21 Inspection of System The Disposal Field- Spray Check sprayhead radius Check proper spray heads Check set-backs Grading & Vegetation The Disposal Field- Drip Depth of drip lines Number of lines & length of each Check set-backs Drip system trenches must be left open or a hole every 10’ to verify depth, material, and connections

22 Inspection Results Fill out inspection sheet Review items needed prior to issuing an Authorization to Operate Have installer sign with OSSF installer license number All paperwork must be in hand of inspector prior to ATO, will not accept “I can fax it to you, you will have it on your desk before you get back to the office” We do not discourage an installer from questioning the rules. Nobody is perfect and these are perfect opportunities to make a better installer/inspector. If it passed, you’re done, Authorization to Operate granted. POWER RELEASE: Centerpoint vs. Entergy Other department permits may be holding up power

23 Re-Inspections Will need to set up the 2 nd (3 rd, 4 th, etc.) inspection just like the first, by calling it in or via website Only the items that were lacking during the previous inspection will be reinspected. Corrections required are called out in paperwork from initial inspection. If at first you don’t succeed, try try again. But in Harris County, after your second inspection, you will pay for all additional inspections until you pass. We will charge you what it costs us to re-inspect. The first two inspections are included in your permit fee.

24 Questions?