AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Team Members: Blake Samic Brent Adams Dan Healy Chris Kantus.

Slides:



Advertisements
Similar presentations
Understanding a life-cycle approach Learning unit B: Exploring eco-efficiency Exercise: Sessel Manufacturing Inc. DEDICATED TO MAKING A DIFFERENCE.
Advertisements

AP Biology Classroom Rules/Grading Policy.
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section PACKAGING Title Packaging Maintenance and Replacement Guidelines Control.
Good vs Bad Creating Interactions.... Some Advice Keep it simple, clear, and concise A manageable amount of information is visible on screen Images are.
Task Board Monitoring Cards Visit GoLeanSixSigma.com for more Lean Six Sigma ResourcesGoLeanSixSigma.com.
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Multi Factor Wage Incentive Program
The Factory System Workers and Factory Life. Cottage Industries Before the Industrial Revolution began, people produced goods in their homes Individuals.
SAFETY MEETING TEAMWORK. Teamwork wins games - - and prevents accidents. We all know how important teamwork is to such sports as basketball, baseball.
WHAT IS MANUFACTURING? Why do we study manufacturing?
Bridge Lighting & Bridge Protection Equipment Requirements.
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Specification Engineering Standard Issuance 4.36.XXX Purpose To specify packaging to preserve and protect purchased parts and assemblies manufactured to.
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Summery of Cooling System Teflon Leaks* *This is independent of the internal problems Rob Pisani.
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Physics and Clouds The Connection A Demonstration The Implications.
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
Standards Unit N2: Evaluating Statements about Number Operations Calculators useful for checking answers. Scissors, Glue, Pale Red and Green A4 paper and.
Remote Control DBA Why Remote Database Support is the solution you have been looking for.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Manufacturing Technology. Learning Standards 4. Manufacturing Technology Manufacturing is the process of converting raw materials into physical goods,
LADDER & STAIRWAY SAFETY
Sling Safety.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Basics & HTML. Overview Subject line best practices best practices – content & formatting How to navigate HTML HTML demo Q&A.
2006 Hand and Power Tool Safety Basic Rules for Rube Goldberg Competition,
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Rishi Savaliya, Mitch Reid, Kelsey Barrera Team ReMaKe.
BUYING A HOUSE Are You Ready?. Advantages of home Ownership Sense of stability and permanence Allows individual expression Can have pets Financial Benefits.
All retailers are good at capturing information on the sales they make.
Financing and Producing Goods. Investing in the Free Enterprise System.
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Material Handling & Lifting Resource
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Rishi Savaliya, Mitch Reid, Kelsey Barrera.  Define the Problem  Time Management  Survey  Brainstorming  Research  Donation Letters  Existing Solutions.
A Technology to Re-cycle and Re-Use Alkaline Cleaners PRESENTED TO THE 16 TH ANNUAL POLLUTION PREVENTION CONFERENCE SEPTEMBER 26, 2013 BY KEN FILIPEK ENERCO.
Define the INDUSTRIAL REVOLUTION
Cutting and Swaging Tubing
The Cold Chain. Definition Vaccines are sensitive to heat and freezing and must be kept at the correct temperature from the time they are manufactured.
The Natural Rate of Unemployment This is a rather different animal and will be covered later in the semester with the Phillips curve. It is the unemployment.
Dance Pad Project By: David Dorsten. Understand  Electric Engineering Project = Dance Pad and Light Bulb Station  This activity will demonstrate the.
Ken Periman Problem solving, Sub frame bolt issue
S.O.S.: An Ocean Adventure. S.O.S. An Ocean Adventure Over the next 4 weeks you will embark on a competitive Ocean Adventure…
Supplies : 1. cardboard or plastic corrugated yard signs (a 18 x 24 sign would make two stands) 2. glue gun 3. Velcro (3/4” wide) (2) 6” soft side, (2)
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
To Panelize or Not to Panelize
THURSDAY DO NOW What is electricity? Why is it important for you to learn about electricity?
Quality and Productivity Learning Objective – Examine different production techniques Learning Outcomes Identify how technology has changed – E Explain.
Updated for the 2016 Season. Contents GRAL Handbook Head Timer Description Head Timer Duties Timer Duties.
PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model.
ENGLISH 2 MODUL IV TEKNIK INDUSTRI
Introduction to Motion and Time Study
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
14 Refrigerant Recovery, Recycling, and Recharging.
Fall Protection.
OBJECTIVES Discuss the procedure recommended for brake drum removal.
Introducing the NEW Igloo® Universal DuraLatch
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Starter: Production Key Terms
Wind Composite Services Group Blade Repair Service Guidance
Why do we study manufacturing?
2.2 Gallon TourTank Installation
Importance of Coolant for your Car
Apparel management & quality control
Absenteeism-3rd Shift Grid Shirts Grid Drawer.
The Natural Rate of Unemployment
Wind Composite Services Group Blade Repair Service Guidance
Presentation transcript:

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Team Members: Blake Samic Brent Adams Dan Healy Chris Kantus Chad Linville Aaron Frees Advocacy Team: Kyle Minnick - Mentor Thiago Tognetti- Mentor Rob Willy - Mentor

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e AP5 Capillary Tube Scrap Reduction

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Problem Area Outside Case Inside Case Refrigerator Smaller capillary tube is still clearly attached to the large tube assembly. Capillary tube is no longer visible outside of the case, indicating that it has been broken off at the entrance to the cas.

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Possible Root Causes Excessive bending of capillary tube during production Many stations bend tube multiple times May strain material, causing breakage further down the line Missing/Misplaced protective tape on tube Unprotected tube rubs on raw edge of case back Rubbing may score tube, causing breakage Reuse of salvaged capillary tube assemblies Rerun tube undergoes more bending than normal Holes in assembly at liner drop Capillary can become hung up in holes causing severe scoring of the capillary tube

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Testing and Packaging Process Flow Capillary Tube is attached to the formed plastic liner. Case Line Capillary Tube from Supplier Repair Assembly Freezer Liner Formation Plastic liner to which cap tube will be assembled is formed. Tube arrives from outsourced supplier. Capillary Tube is attached to the formed plastic liner. Capillary Tube is foamed into the finished case making it impossible to easily replace. Ends of capillary tube assembly are brazed to the evaporator and hi side assembly. Somewhere in assmebly the broken capillary tube is identified by a worker and marked out for repair. Refrigerators are scrapped at repair and never make it to test and pack. Possible poor tube design identified by PMQ could be contributing to broken tubes. Hole in conveyor identified as definite contributor to broken tubes. Reuse of capillary tubes of scrapped freezer liners identified as possible secondary cause. Reused tubes are currently being tagged to help identify whether this is a contributor to the issue.

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Financial / Business Benefits Soft Benefits Labor reduction Less rework and salvage time with scrapped units Fewer salvaged parts returned to line Hard Benefits Elimination of 3 or more scrapped units per week ($45,000/Yr) Elimination of 3 scrapped units per week ($45,000/Yr) Labor reduction Less rework and salvage time with scrapped units Fewer salvaged parts returned to the line

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Actions Note: After covering the hole on the assembly line no broken capillary tubes were seen for a week and a half. A few were seen at the end of last week but we are unsure if these breaks are caused by the same one that has been causing the three or so a week. None of the units with broken tubes have yet to be from a rerun tube off of a bad liner. Identified hole in the case assembly line were capillary tubes were becoming snagged and scored. Hole was temporarily covered by Case Line BTL Kyle Minnick and in long term the hole will be permantently bolted shut. All rerun capillary tubes off of scrapped liners are being marked in or to discern whether the rerunning of these tubes is contributing to the issue

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Current: On average 3 or more completed units per week are scrapped because of broken capillary tubes. Future: Plan to place metal slugs into assembly line to cover any and all holes where tube may become caught. No reuse of capillary tubes (if long term results indicate that this contributes to problem. 3 units a week are scrapped due to broken capillary tubes with costing the business $45,000 annually Place metal slugs in all holes on assembly line where the capillary tube may hang up Possibility of not rerunning capillary tubes off of scrapped liners

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e Capillary Tube Project Contacts Jay Fields (BTL Case Line) Kyle Minnick (BTL Case Line) Gene Pikes (Tech Support Case) Martin Pike (Inspector Assembly Line) Larry Byrne (EOLA Technician) Larry Crouch (Test and Pack Repairman) Mike Mulcahy (BTL Case Line) Del Cofield (Blackbelt AP4/5)

AP4/5 Lean Manufacturing Team April 26, 2004 AP5 Lean Manufacturing Broken Capillary Tubes e What we gained from our lean experience C communicate with individuals out on the floor to work towards a common goal to research an issue of which we had no prior knowledge how to formulate a plan of attack in order to solve the issue work together with teammates on a project that would otherwise be to large and time consuming to u undertake alone. We learned how to: We learned never to: start investigating an area in a union factory without first consulting the union steward. take pictures of any union personel on the job. n ever to bring a camera, stopwatch, or large group of engineers into an area and start asking questions without first having the proper meetings with union officials.