Tinker AFB – F100-200, F14 jet engine test MTT, TBO 3/29/07 – 4/6/07.

Slides:



Advertisements
Similar presentations
JQuery MessageBoard. Lets use jQuery and AJAX in combination with a database to update and retrieve information without refreshing the page. Here we will.
Advertisements

Word List A.
SECTION 11 LEVEL B SUIT OUT. SECTION 12 AIR MONITORING.
Getting started with LEGO NXT Mindstorms software This is intended to be a short introduction to the LEGO Mindstorms software and programming the LEGO.
Computer Basics Hit List of Items to Talk About ● What and when to use left, right, middle, double and triple click? What and when to use left, right,
Exponential Functions Logarithmic Functions
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
To figure out which tubes are working fine… Compare 24 to 2.6 and 2.51 to 2.6 by taking the ratio of counts. In general, 2.4 had the most problems, and.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Technology Gone Wrong. A little background… Your computer uses the operating system to “talk” to software applications. The operating system is the first.
Squirrel Overview Donna Sueper Aerodyne, University of Colorado, Boulder.
LinMot Designer Software
Installing SAS 9.3 Raymond R. Balise Health Research and Policy.
Squirrel Overview Donna Sueper June, 2007 Aerodyne, University of Colorado, Boulder.
Oxford Engine Emissions 10 th Jan Filter run.
Methods of Exploratory Data Analysis GG 313 Fall /25/05.
Squirrel Tutorial Post – Pre-Process Steps Airbeam correction PToF DVa, DC markers Fragmentation checks Donna Sueper Aerodyne, University of Colorado,
Installing SAS 9.3 TS1M1 Raymond R. Balise Health Research and Policy.
Lesson 4: Percentage of Amounts.
Binary Arithmetic Math For Computers.
Etiquette. Automatic reply Here I have created a automatic reply for when I am not able to contact people when I have ed then.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
ETIQUETTE AND EVIDENCE
1 Computer Power Supply Amateur Radio Conversion For Cheap +12 vdc Power March 17, 2003.
Get the best performance out of your PC By Matthew Pinch.
Computers in the real world Objectives Understand what is meant by memory Difference between RAM and ROM Look at how memory affects the performance of.
s By Mollie.
E V I R A R Electrical Terms Basic Terms Voltage It is measured in volts and is symbolized with a V for volt or an E for electromotive force. Amperage.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Sparrow Light Scattering (LS) Analysis Tool The first flight ver March 26, 2010.
Moving Around in Scratch The Basics… -You do want to have Scratch open as you will be creating a program. -Follow the instructions and if you have questions.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
Processing Lab 3 – Header issues and trace editing Bryce Hutchinson Objectives: Fixing elevation issues Define an LMO function Pick first breaks Kill traces.
Step 2: Inviting to Challenge Group. DON’T! Before getting into the training, it’s important that you DON’T just randomly send someone a message asking.
Squirrel Tutorial Pre – Pre-Process Steps Modify Single Ion (SI) M/z Calibration Fitting Baseline Fitting Donna Sueper ToF AMS Training, Aerodyne, Nov/Dec.
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
 To send a you need to first click new.  Then type in the name off the person you want to send it to.  Then write something.  And to finish.
Change in your CAD Project File - it happens all the time in robotics.
Instrumentation Overview Spring 2012 The laboratory is a controlled environment where we can measure isolated physical phenomena with a view to eventual.
Optimizing Your Computer To Run Faster Using Msconfig Technical Demonstration by: Chris Kilkenny.
Fort Sill - POOF Tim Onasch, Mike Timko March 18, 2007 (day 0) LOG Day 1 – co-adds 2, used 1 multiply data by 2 Day 2 – IE used 34, should be 15, multiply.
Solution of. Linear Differential Equations The first special case of first order differential equations that we will look is the linear first order differential.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
Squirrel Tutorial Pre – Pre-Process Steps Modify Single Ion (SI) M/z Calibration Fitting Baseline Fitting Donna Sueper Aerodyne, University of Colorado,
Thanks for continuing to work at becoming a better reader. As soon as you can quickly read these phrases, please go onto the next 100 phrases. Your extra.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
Issues with USB communication to pump box Sonya Collier Qi Zhang’s Group – UC Davis.
Intelligent Boiler Sequencing
Center for Atmospheric Particle Studies AMS Data Analysis Training Amy Sage and Andy Grieshop March 7, 2007.
The ABC’s Of Search Engines Lesson 3: The Power Of The + and - Sign.
Version Control and SVN ECE 297. Why Do We Need Version Control?
SNAP CIRCUITS INSTRUCTIONS 1.Make sure ALL parts are in place before beginning 2.Follow the Projects in order, starting with #1 3.The BLACK numbers show.
Chem. 133 – 2/18 Lecture. Announcements Homework Set 1.2 (bold problems) – due today Quiz 2 Today Electronics Lab Reports – due Tuesday Seminar this Friday.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
© 2015 albert-learning.com How to talk to your boss How to talk to your boss!!
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Data Editing Strategies Common edits Invalidation vs. contamination? What is a considered a spike? What not to edit! Automatic edits Reasons for edits.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
L.O: To understand how to use the Internet and ICT equipment safely.
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Tool removed during cycle Fault #2
How can you fix Kindle critical battery error?
Optimizing PToF timing and averaging and saving
Welcome to Digital Electronics using the Arduino Board
Tuesday March 27, 2012 Clicker questions.
Solving Absolute Value Equations
Presentation transcript:

Tinker AFB – F , F14 jet engine test MTT, TBO 3/29/07 – 4/6/07

Log of SI and Airbeam March 30, 2007 MCP = 2220 V; IE = 8.5e-6 March 31, 2007 MS AB = 9e5; PTOF AB = 1.2e6 ;SI = 18; MS AB/SI = 5e4 April 2, 2007 MORNING MS AB = 7e5; PTOF AB = 8e5; SI = 14; MS AB/SI = 5e4 April 2, 2007 LATE MORNINGS MS AB = 6.4e5; PTOF AB 7e5; SI = 13; MS AB/SI = 4.9e4 April 2, :47 AM MCP = 2260 V from 2220 V April 2, :47am, MS AB = 8e5; PTOF AB = 6e5; SI = 17; MS AB/SI = 4.7e4 WORRIED April 2, :00pm, MS AB = 8.5e5; PTOF AB = 8.5e5; SI = 17; MS AB/SI = 5e4. THAT’S BETTER! April 3, :45am, MS AB = 8e5; PTOF AB = 9e5; SI = 15; MS AB/SI = 5.3e4 April 3, :00pm MS AB = 8.5e5; PTOF = 9.5e5; SI = 14; MS AB/SI = 6e4 (probably still seeing N2 enriched gas when this was measured) April 3, :05PM MCP = 2280 V from 2260 V April 3, :05pm SI = 14.5 MS AB = 7.5e5; PTOF AB = 8.5e5; SI = 14.5 MS AB/SI = 5.1e4 April 3, :50pm SI = 14.5, MS AB = 7.9e5; PTOF AB = 9e5; MS AB/SI = 5.4e4 April 3, :48pm SI = 13.5 MS AB = 8e5; PTOF AB = 9e5 Not too bad April 4, :10pm SI = 14, MS AB = 8e5; PTOF AB = 8.5e5 MS AB/SI = 5.7e4

3/29/2007 Arrive at Tinker AFB Turn on pumps, oven, filament, MCP Performance is reasonable, though there is a substantial electric background The following slides document this noise issue

This is with the MCP fully connected

This is with the MCP connected but without the over-voltage protector

This is with a 50 ohm terminator

WTF! AMS meltdown Checked lots of things 1) external connections 2) chopper 3) Acq. Board connections 4) cold start…..everything checks out OK….error message “Is the chopper on?” Is it a timing issue with the board? After about 1 hr, bang – the signal came back. We have no satisfactory answers at this point…

PTOF looks OK, MS is a little strange…why does the signal go down?

Looks OK now

3/30/07 Calibrations Flow cal Size cal tuning

Looks OK this morning – noise may be a bit better? Zeros at a threshold of 5 instead of 6

070330_tinker_no_amp_noK, Heater bias = 37.4 V

And here’s what we get after about 1 hr of tuning, Heater bias = 37.4 V

Don’t pay attention to the SI for this screen, the noise though is very good!

This is the bitwise for IE_cal

This is the 10_sec GA bitwise So the SI is a bit different for the two menus

AMS run #’s – with TPS settings shown above, looks very nice

3/31/07 1)Checking normal operation of 10-sec GA mode 2)Comparing different instruments

Found an error in the defaults morning Of 3/31/07

Re-checking the baseline in GA-10sec – looks very good

PTOF looks OK, what’s the deal with the MS AB? Is the servo moving faster again? Very strange…I will stick with the 300 msec b/c it’s working.

Screen shot during normal operation, Sat Morning at Tinker. So far so good. Good diff/closed air beams, reasonably low potassium. Good noise level. Saved a few runs these are filter samples

Here’s the diagnostics from the filter samples run on the morning of 3/31/07

This may be an aggressive baseline setting – peaks at 280 are baseline away a bit. With these settings, I was trying to finesse the NH4 (15,16,17) peaks to see if I could keep them positive.

Mass spec looks OK Mass loadings look alright – NH4 is negative, org is noisy PTOF tof is strange – NH4 has a peak, org goes way neg PTOF size is strange – org looks like it will integrate to a negative # I guess the DC markers will need attention… St Dev x 3 => Org = ug/m^3 (about 100 ng/m^3) SO4 = ug/m^3 NO3 = ug/m^3 Chl = ug/m^3 (nominally!) NH4 = ug/m^3

Org PTOF Why does the org ptof go negative? 17,18,41,44 all go negative at small tof 44 is CO2 – the truck had about 1000 ppm of CO2 during runs so that’s why it’s got problems 16,30,33 have both a negative and positive going peak at low tof 14,28,29,32,33,40 all have positive peaks 14, 28,32,and 40 are all primary air peaks 29 and 33 are isotopic peaks [O(16)-O(17) and N(15)-N(14)] So, we either have a baseline problem or we have a frag list problem I removed all of the offending masses from frag_organic but there was no difference with the ptof… Looking at the mass spec 15,16,20, 41, and 44 have organic masses Not worried about 44 for now b/c CO2 was so high. 15,16 are NH4/H2O problems. RH was different than frag list thinks it should be Tried using the air beam correction – no difference that I could see I tried to fine tune the squirrel baseline, the next slide shows what I got to

Here’s a fairly wide view, in general things look OK, but we need to take a closer look to know for sure. The next 3 slides look at 10-20, 20-40, and – the 3 interesting sections of this plot

OK, here’s the water/ammonium peaks – these look very nice

OK, here’s the air peaks – once again they look nice. It looks like our resolution is not sufficient to wipe out the ringing either in 28 or 32.

And here are the peaks in the 90’s – I’m not sure what these are…C7H7 I guess. At any rate, we wipe out a ringing peak in mass 91 and everything looks good

Filter Sample Redux IE and Airbeam look OK Mass loadings look reasonable To do list – 1) DS about dynamic CO2 correction to mass 44, 2) thermocouple calibrations for J and K type, 3) JK (cc JJ), tell him thanks looks good (4) Donna that “Air” PTOF does not work in Squirrel (v1.36) 5) download Igor updater onto laptop, mem stick

April 1, 2007 Ran morning ambient samples and afternoon/morning filter samples In the afternoon runs, TBO had a great idea to change the data delay from 250 usec to 300 usec – nothing else was changed. This small modification got the organic PTOF to look just right. The next two slides are screen shots of the new timing menu for GA 10-sec and the signal vs TOF for the afternoon filter samples Also, noticed that the m/z calibration was not so good in Squirrel – take a look at that first thing Monday April 2

Compare this to slide #24 from March 30, 2007

Compare this to the previous two days – now that makes sense!

April 2, 2007 Tinker AFB Day 1 – Run #1 Filter samples 7:51am, #18938; B 8:26am, #18997; C 8:45am, #19007; D 8:52am, #19018 As of 9:00am, the SI has decreased from about 18 on Sat to 14, AB beams had lost about 20% of there values as well PTOF, which had looked strange on Sat, but better after switching Data Delay from 250 usec to 300 usec, looks strange again. Increased chopper speed to 99.7 Hz (the set point is 100 Hz, and the speed had dropped to about 97 Hz) – PTOF may look a bit more normal. Increased data delay to 350 usec, but this had no effect. Try 320 usec.

Single ion decreased a bit…from 18 to 12? Try again after a few minutes of warm up time – it looks like the signal decreased in m/z cal as well; air beams are lower too

OK, this is a bit better – I forgot to set the pk discrimination to 4 in the previous slide, still we have gone from 18 to about 14.

400 microsec looks best – run with this setting 375 microsec

Just checking the servo – it looks good

Let’s try some different parameters What do you know, that seemed to work! The ptof is pretty noisy, but this is a small slice of data (9 runs) Let’s switch it back to 2000 nm by taking 350 spectra/chopper and see if this problem comes back

And there you go! The problem came back Let’s try to get rid of it again

Yikes! These last few slides document my efforts to “solve” the organic ptof problem… I was varying data delay and the # of extractions/chopper to find the sweet spot Suddenly, the PTOF AB got noisy. It would bounce from 8e5 to 1e5 and then back. And then, the PTOF AB started going negative, e.g. -8e5 and such. Called TBO…turned off computer, unplugged it (unplug fan first), pressed power switch, waited 1 minute or so, plugged computer back in, turned power back on and re-booted…had to toggle PTOF and re-baseline, but otherwise everything was cool Also, the PTOF AB, which had been 1e6 and then dropped to 8e5, was back to 1e6. Problem solved! But WTF is the root cause? It seems to be cross-talk between the DAQ board and software. What brings it on? This time, possibly switching the DAQ parameters in fairly rapid succession (or into a bad regime) may have led to the problems. One time, it looked like BP’s cell phone being turned off led to the same problem. This is definitely something to be aware of and to monitor.

Stay with what works for now! Why are the first few ORG points way negative? After about 4-5 runs it looks OK, but what is the beginning transient? It is NOT a problem with the MCP or with opening the valve. WTF is it?

DAY 1 Quick Notes MCP at 2260 V SI before and after about 15 – great stuff! Re-check tomorrow. Re-calibrate on Wednesday? Ran PTOF in sub-optimal mode Lots of organic at early time points – was the line dirty. Organic settled down with time, but there was still a measurable quantity at high powers. At low powers, there was much less AMS organic. CPC and SMPS looked good. MAAP looked very noisy! Can we replace the valve with a manifold of critical orifices? Send data to Tim. Closed valve, turned down MCP. Onto Squirrel!

Day 2 April 3, 2007 Plan – run dilution tests first with unheated (Run #2) and then heated lines (Run #3)

Check baseline and SI – no change, very good

PTOF At 8:35am, I tried to increase the # of spectra per chopper from 350 to 395. This increased the size range from 2000 nm to 3000 nm. The PTOF air beam immediately went negative! After one rotation, I quit and changed # of spectra back to 350. This seemed to correct the problem without requiring that I restart the computer/DAQ board. Saved data in Day2/prep folder – looked like normal in Squirrel

Runs 2 and 3 Checked SI = 15; MS AB = 9:00am Run 2 begins 10:10am/#20461; ends 12:55pm/#21157 Checked SI = 14; MS AB = 8.4e5 Increased MCP to 2280 V Cleaned 13:26 – checked flow Run #3 begins with filter samples at 13:50/#21160

Bitwise after Run#3 at 18:47 – we had been sitting at about 14.5 – not too bad Electronic noise is still reasonable

Donna/Tim Evaluation of Data Overall looks good Only problem is that are lost probably due to high water background Ran filtered N2 through the AMS with the oven at 750 C overnight. DON’T FORGET TO TURN OVEN DOWN BEFORE RUNNING!

Day 3 – No Runs Preliminary look at looked better Re-calibrated GA with BFSP gave a very small PTOF AB – ran BFSP alone and added GA MS/PTOF data later New IE = 8.19e-7, RIE = 2.02 (with MCP at 2280 V SI = 14)

MCP = 2280 V Noise looks awesome!

This is from the PTOF/MS file NO3/NH4 is about 7:1, it should be about 4:1