Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Lorentz force detuning measurements on the CEA cavity
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Ruben Carcagno - 5/3/2005 Simcon 2.1 DESY FPGA SIMulator and CONtroller Overview.
Various LLRF projects FNPL Fermilab/DESY May 4 th, 2005.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Klystron Modulator for Proton Driver
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
John Carwardine January 16, 2009 Some results and data from January studies.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
650 MHz Solid State RF Power development at RRCAT
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Project X ICD-2 Low Level RF Brian Chase Project X Collaboration Meeting September 11-12, 2009.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Low Level RF and Controls Brian Chase - LLRF Margaret Votava - Controls.
FNAL ILC LLRF Controls and Fast Tuner R&D Status Ruben Carcagno, Brian Chase, Gustavo Cancelo, Yuriy Pischalnikov (on behalf of the FNAL LLRF Working Group)
Director’s Review of the Project X Cost Range Estimate: Low Level RF Brian Chase Project X Director’s Review March 16, 2009.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
RF Issues with Configuration Options Project X retreat Nov 2, 2010 Brian Chase, Julien Branlard, Gustavo Cancelo, Warren Schappert, Yuriy Pischalnikov.
Areal RF Station A. Vardanyan
RF acceleration and transverse damper systems
Test of the dressed spoke cavity
WP5 Elliptical cavities
ILC LLRF Status Ruben Carcagno, Brian Chase
LLRF systems status update
Chris Adolphsen Sergei Nagaitsev
ESS RF Development at Uppsala University
Jefferson Lab Low Level RF Controls
LLRF and Beam-based Longitudinal Feedback Readiness
CEPC RF Power Sources System
RF introduction Anders Sunesson RF group leader
Summary of the maximum SCRF voltage in XFEL
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Overview of SMTF RF Systems Brian Chase

Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress Conclusions

Scope of RF Systems A0 - Gun and cavity Meson (Oct, 05) - CC2 Meson (06) - Proton Driver A0 Upgrade (06) - Gun, CC1, CC2, 3.9 Acc, 3.9 Deflecting IB1 Horizontal Test Stand Multi- module support CW Program

RF & LLRF Collaboration Fermilab Accelerator, Technical, and Computing Divisions DESY Penn State SNS and Jlab advisory capacity for now We want to expand this engineering collaboration!

SIMCON 2.1 setup at A0 – March 2005

LLRF Specifications for SMTF (Most Stringent Compilation) 1 to 4.5 ms pulse length or CW operation Variable rep rates up to 15 Hz 0.1 deg, 0.1% pulsed, 0.01 deg, 0.01% CW 325 & 1300 MHz warm/cold, and 3900 MHz cold only Multiple cavity per klystron operation Piezo tuner control Ferrite Vector Modulator control

Progress So Far We have a DESY prototype FPGA LLRF controller that has been tested on the 9 cell cavity at A0. This system is now in the lab at the Magnet Test Facility where we have some libraries but not the operational source code. A stand alone LLRF system is planned for October EPICS control efforts are getting organized A design for a Low Noise master Oscillator is underway Meetings have been held to bring more people into the effort. An RF modeling and simulation group has been meeting for the Proton Driver. These efforts will spill over to the ILC.

Two modulators are being built One modulator end of this year, other early next year One with 4.2 ms flat top, other with 1.4 ms flattop Peak Output is 120 kV, 140 A Average Power is 310 kW Modulators

1.3 GHz 300 Kwatt Klystron – Valvo Philips YK-1240 with solenoid & oil tank

KLYSTRON INTERLOCKS Monitor Forward and Reflected Power at the klystron output directional coupler. Forward and Reflected Power at the load and circulator (if used). Inhibit Klystron LLRF drive when 3 consecutive reflected power trips are detected. Waveguide Pressure. RF Leakage Level. Klystron Window and waveguide sparks. Load and Circulator window sparks. Permits Enable LLRF when all klystron interlocks are clear. Enable Modulator to pulse when all klystron interlocks are clear. System Implementation VME Based system running under EPICS. Consist of three 4 Channel VME boards and a slot 0 crate controller. Any trip inhibit LLRF permit < 1 usec.

Code development for SRF linacs at Fnal: M. Huening’s S.C.R.E.A.M Developed for TTF incorporates “realistic” implementation of vector-sum control and cavity detuning due to Lorentz- forces and microphonics Simulates effect of cavity detuning and respective RF controls measures on longitudinal beam phase-space Special adaptation to Fnal PD: includes fast ferrite vector-modulator Left: Final longitudinal phase-space distribution of all macro-particles accelerated in the PD during a 1.3 msec pulse.

Below: Snapshot of beam current and cavity phase along linac with (right) and without (left) fast vector-modulators in  <1 section.

Below: Example of S.C.R.E.A.M simulations of average bunch phase and energy along linac during different times along the PD linac as an illustration for the need of accurate beam phase control needed in the low beta end of linac to control beam energy fluctuations at output.

Conclusions High Power RF and Modulators are on a clear path. Interlocks are in the design stage, will be ready for the October test LLRF is moving forward with a collaborative effort Simulation for Proton Driver are underway - could apply to ILC