ACQUISITION PLANNING.
C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
GSA Expo 2009 Overview of Major Acquisition Management Bruce W. Moler US Department of Homeland Security.
Lesson Objectives Review Capabilities Development documents and processes for Information Technology and Information Systems IT Box – (current JCIDS manual)
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
CLR 252 Developing KPPs Note from SME:
SEE OTRR LONG-RANGE PLANNING CHECKLIST SEE OTRR PLANNING CHECKLIST SEE OTRR PRE-REVIEW CHECKLIST LONG RANGE PLANNING PHASE PRE-REVIEW PHASE At OTRR, the.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
1 Nunn-McCurdy Unit Cost Reporting NDIA PMSC Meeting August 15-16, 2006.
Presented at the 2nd Annual DAU-South CONTRACTING CONFERENCE & EXPO
Life Cycle Logistics.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
UNCLASSIFIED NCES Net-Centric Enterprise Services Lynda D Myers DISA, Center for Enterprise Capabilites February 2003.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Life Cycle Cost Composition
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Life Cycle Cost Composition MILCON Facilities Disposal O&M (or others as appropriate ) RDT & E Development Costs of PME & Support Items Systems Engineering.
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
Acquisition Support New Horizons Consulting Services, LLC’s, premier business unit is an offering of a full range of services and support for acquisition.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
DAE CAE PEO PM OIPT Acquisition Category (FY14 $) ACAT ID
Eric Jefferies Professor, Requirements Management
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
New Space Systems Acquisition Policy
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
APB, SAR, and Nunn-McCurdy Status
ENVIRONMENTAL SAFETY & HEALTH DEPARTMENT OF THE NAVY RESPONSIBILITIES
Summary Acquisition Strategy Approval Authority
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Acquisition Directorate
Mid-Tier Acquisition Framework Reference Tool for PMs
The Department of Defense Acquisition Process
Presentation transcript:

MODIFICATION 5/ N N Y PROGRAM TO BE MODIFIED STILL IN PRODUCTION 6/ Y SEPARATE ACQUISITION EFFORT 5/ N TOTAL COST OF MODIFICATION >= MAIS or MDAP 5/, 8/ & 13/ Y N N PART OF EXISTING ABBREVIATED ACQUISITION PROGRAM PART OF EXISTING ACAT PROGRAM PART OF NEW ACAT PROGRAM MODIFICATION IS... 1/ "Prepare APB" is for the original ongoing program if a "current APB" does not exist, or for the "modification only" if the modification is to be managed as a separate program. "Revise APB" is for the original ongoing program. See APB format in Consolidated Acquisition Reporting System (CARS) section of the Defense Acquisition Guide. 2/ If a new, or change to an existing, CDD/CPD or TEMP is required, see formats for CDD/CPD and TEMP in reference (f) and Defense Acquisition Guide, respectively. 3/ "Prepare ACAT designation request" is for the "modification only", unless the original program is still ongoing (i.e., in production), in which case the ACAT designation request shall encompass both the original program and the modification(s). See the ACAT designation request and ACAT designation change request content memorandum in the DON Acquisition and Capabilities Guide. 4/ $ threshold for "Abbreviated Acquisition Programs" is less than: for weapon system programs, $10M total development expenditure, $25M total production or services expenditure in any fiscal year, and $50M total production or services expenditure for all fiscal years; for IT programs, $15M program costs in any single year and $30M total program costs. 5/ If answer to column 5 is YES*, an approved CDD/CPD or CDD/CPD revision is required. 6/ For IT programs, endorsement is provided by the IT functional area manager, approval is provided by the resource sponsor. 7/ For modifications that require additional funding, see ASN(RD&A) memorandum, “Shipbuilding Cost Growth - Configuration Control,” 4 Sep 01 Y NON- ACQUISITION PROGRAM 4/ URGENT OR WAR 1/ RAPID DEPLOYMENT CAPABILITY 2/ Y MDA DECISION TO HANDLE AS STAND ALONE PROGRAM 6/ YN Modification Process Table (SECNAVINST C, Enclosure (2), para 2.5.5, Table E2T2) PEO C4I and Space ACQUISITION CATEGORY DESIGNATION FLOWCHART REFERENCES: A. DoDI Regulation dtd 12 May 03 B. Interim Defense Acquisition Guidebook dtd 30 Oct 02 C. SECNAVINST C (Final Draft) dtd 8 Mar 04 NOTES for Modification Process Table ENCLOSURE (3) Page 1 PEO C4I and Space ACQUISITION PROGRAM STRUCTURE GUIDE VERSION 3.0 Feb / Urgent or War is defined in SECNAVINST C, Enclosure (2), paragraph / Rapid Deployment Capability is defined in SECNAVINST C, Enclosure (2), paragraph / Non-Acquisition Programs and Advanced Technology Demonstrations/Developments (ATDs) are defined in SECNAVINST C, Enclosure (2), paragraph / Non-Acquisition Program procedures are defined in SECNAVINST C, Enclosure (2), paragraph / Modification is defined in SECNAVINST C, Enclosure (2), paragraph / Program in Production & Milestone Decision Authority (MDA) Decision for stand alone is defined in SECNAVINST C, Enclosure (2), paragraph GENERAL NOTE: This FLOWCHART above contains the respective cost (in FY2000 constant dollars) and qualitative criteria for weapon system acquisition programs and information technology acquisition programs. This flowchart was created to evaluate acquisition program category designation by extracting the appropriate information from the DoDI Regulation , Interim Defense Acquisition Guidebook and SECNAVINST C documents. Users of this flowchart are urged to refer to the governing references when using this chart.. NOTES for Flow Chart (Continue to page 2 of 2 for additional notes) PROGRAM TO EVALUATE GO TO ENTRY POINT (Page 2 of 2) TYPICAL PROJECT ELEMENTS  Uses Only O&MN Funding  Provides Only Services  Supports Other Efforts That Are Not Valid Acquisition Programs  Performs Corrective Maintenance of Legacy Systems or Sustainment of Post FOC Systems  Provides Organizational Support  Performs ISEA Functions  Purchases Hardware/Software for Legacy Systems or Post FOC Systems  Not Identified As a Valid Acquisition Program Category Utilizing this Flow Chart  Performs only Studies, Reviews, Analyses  Not a Small Business Innovative Research (SBIR) Initiative  Not a Small Business Technology Transfer (STTR) Initiative  The program sponsor does not support designating the effort as a valid program RDT&E / ATD / IT BASED RESEARCH / ADVANCED DEVELOPMENT ACTICLES / SUPPORT OF R&D FACILITIES ONLY 3/ MEETS CRITERIA FOR A PROJECT N Y PROJECT Typical Project Criteria ACAT Exists for pgm being modified? Mod breaches APB threshold? Mod requires additional funding? 7/ Mod breaches "AAP" $ threshold? 4/5/ PM action CNO/CMC action 6/ Program Decision Authority or MDA action YESNO YES 5/ or NO Execute modApprove CDD/CPD* 2/ None YESNOYESYES 5/ or NO Prepare funding request Execute mod Approve CDD/CPD* 2/ or reqt. Provide funding None YES NOYES 5/ or NO Revise APB 1/ Revise TEMP 2/ Execute mod Approve CDD/CPD* 2/ or requirement Endorse APB 1/ Endorse TEMP 2/ Approve APB 1/ Approve TEMP 2/ YES YES 5/ or NO Prepare funding request Revise APB 1/ Revise TEMP 2/ Execute mod Approve CDD/CPD* 2/ or requirement Provide funding Endorse APB 1/ Endorse TEMP 2/ Approve APB 1/ Approve TEMP 2/ NON/ANO Execute modApprove requirementNone NON/AYESNOPrepare funding request Execute mod Approve requirement Provide funding None NON/AYES Prepare funding request Prepare APB 1/ Prepare TEMP 2/ Prepare ACAT 3/ desig request Execute mod Approve CDD/CPD 2/ Provide funding Endorse APB 1/ Endorse TEMP 2/ Approve APB 1/ Approve TEMP 2/ Approve ACAT 3/ desig request PDD Y PEO Approval? N

AIS PROGRAM 7/ IT IAM IT IAC ID IT IVT IC IT AAP Y MDA= ASD(NII) 9/ IT III Y Y Y N N NN WEAPONS SYSTEM 12/ N RDT&E >$140M 15/ OT&E REQUIRED 11/ II Affects Mission 16/ III OT&E REQUIRED 11/ IVT RDT&E <$10M 17/ IVMAAP NNN YYY YY Y N N Pgm Cost/Yr >$32M 8/ Total Pgm >$126M 8/ Life Cycle >$378M 8/ ASD(NII) Designates ACAT IA 8/ MAIS 8/ YY N MDA= ASN(RD&A) 9/ Pgm Cost/Yr >=$15M/Yr 10/ Total Pgm >=$30M 10/ RDT&E >$365M 13/ Procurement >$2.190B 13/ USD(AT&L) Designates ACAT I 13/ MDAP 13/ MDA= USD(AT&L) 14/ MDA= ASN(RD&A) 14/ Procurement >$660M 15/ ASN(RD&A) Designates ACAT II 15/ MAJOR SYSTEM 15/ Procurement <$25M/Yr 17/ Total Expenditures <$50M 17/ N NN NN N Y Y YYY 7/ AIS includes IT as defined in SECNAVINST C, Enclosure (2), paragraph / Major Automated Information System ( MAIS) criteria and cost are defined in DoDI , Enclosure (2), paragraph E2.3, table E2.T1 and SECNAVINST C, Enclosure (2), paragraph / MDA criteria are defined in DoDI , Enclosure (2), paragraph E2.3, table E2.T1 and SECNAVINST C, Enclosure (2), paragraphs and / Cost criteria for ACAT III is defined in SECNAVINST C, Enclosure (2), paragraph / OT&E criteria is defined in SECNAVINST C, Enclosure (2), paragraph / Weapons System is defined in SECNAVINST C, Enclosure (2), paragraph / Major Defense Acquisition Program ( MDAP) criteria and cost are defined in DoDI , Enclosure (2), paragraph E2.3, table E2.T1 and SECNAVINST C, Enclosure (2), paragraph / MDA criteria are defined in DoDI , Enclosure (2), paragraph E2.3, table E2.T1 and SECNAVINST C, Enclosure (2), paragraphs and / Major System is defined in DoDI , Enclosure (2), paragraph E2.3, table E2.T1 and SECNAVINST C, Enclosure (2), paragraph 2.4.7, Table E2T1. 16/ SECNAVINST C, Enclosure (2), paragraph 2.4.7, Table E2T1 defines as, “Affects mission characteristics of ships or aircraft or combat capability is designated an ACAT III program.” 17/ AAP criteria and cost are defined in SECNAVINST C, Enclosure (2), paragraph GENERAL NOTE: This FLOWCHART above contains the respective cost (in FY2000 constant dollars) and qualitative criteria for weapon system acquisition programs and information technology acquisition programs. This flowchart was created to evaluate acquisition program category designation by extracting the appropriate information from the DoD 5000 series and SECNAVINST C documents. Users of this flowchart are urged to refer to the governing references when using this chart. NOTES for Flow Chart (continued from page 1of 2) YYY NNN Y N ENTRY POINT (Continued from Page 1 of 2) - PROGRAM BEING REVIEWED - DECISION NODE - PROGRAM DEFINITION POINT - DATA NODE - OFF PAGE CONNECTOR TEMPLATE LEGEND PEO C4I and Space ACQUISITION CATEGORY DESIGNATION FLOWCHART REFERENCES: A. DoDI Regulation dtd 12 May 03 B. Interim Defense Acquisition Guidebook dtd 30 Oct 02 C. SECNAVINST C (Final Draft) dtd 8 Mar 04 ENCLOSURE (3) Page 2 PEO C4I and Space ACQUISITION PROGRAM STRUCTURE GUIDE VERSION 3.0 Feb 2004