1 Flight Test Instrumentation Package for the L-29 Delfin Turbojet For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation.

Slides:



Advertisements
Similar presentations
Yokogawa Network Solutions Presents:
Advertisements

AUTOMATIC FLIGHT CONTROL SYSTEM (AFCS)
Cisco 6500 E-Series Chassis Up-grade
1 Flight Test Instrumentation of the Ohio University Delphin Turbo Jet For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation.
Efficient Management for Building Automation. Market Trend.
Proximity Sensor Theremin Khoa Nguyen Walter Hudson Dennis Gilbert G. Hewage Thushara.
Airborne Platform for the Evaluation of Synthetic Vision Displays and Mounting Configurations For the Quarterly Review of the NASA/FAA Joint University.
Advanced Flight Display For General Aviation Aircraft: A Cost-Effective Means to Enhance Safety J. Dubinsky, M. Braasch, M. Uijt de Haag Ohio University.
LORAN-C Band Data Collection Efforts at Ohio University Presented by Curtis Cutright to the International LORAN Association 32 nd Annual Convention and.
Instrumentation of UAV for 6-DOF Modeling Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Friday June.
Avionics Engineering Center Characterization of Atmospheric Noise in the Loran-C Band Presented to the International Loran Association (ILA-32) November.
Radio Frequency Interference Measurement System
Aerodynamic Modeling for the Ohio University UAV For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Wednesday.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Parth Kumar ME5643: Mechatronics UAV ATTITUDE AND HEADING HOLD SYSTEM.
Antenna Baseline Measurement System 29 January 2010 Mark Phillips, Research Assistant Ohio University, Athens OH Research Intern Naval Research Laboratory.
GPS-Guided Autonomous Vehicle.
Aircraft Response to Control Input Data Collection System Presenter: Curtis Cutright Advisor: Dr. Michael Braasch Project Sponsor: JUP.
Data Processing Equipment
The GPS Software-Defined Receiver (a.k.a., the software radio) Michael S. Braasch, Ph.D., P.E. Associate Professor of EE Avionics Engineering Center.
Use of FOS to Improve Airborne Radar Target Detection of other Aircraft Example PDS Presentation for EEE 455 / 457 Preliminary Design Specification Presentation.
ELEC 4600 RADAR & NAVIGATION
Design Development of the General Aviation eHUD Flight Display For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation.
Preparations for GPS/INS Flight Testing on a High-Dynamic Vehicle Presenter: Curtis Cutright Advisor: Dr. Michael S. Braasch.
GPS Carrier-Phase Multipath Model Validation Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Friday, June 20,
1 SD Recorder OS-TM-V701A for Driving Security Surveillance.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Enabling Location Based Service Deployment for Corporate and Consumer Mobile Applications Presented by Dr. Henry Wong, Chief Operating Officer, SUNDAY.
Joint University Program 5 April 2001 Steven Aab, Graduate Research Associate Avionics Engineering Center Ohio University Advisor: Dr. Michael F. DiBenedetto,
Flight Test Results of the Head-Up Synthetic Vision Display For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation.
1 A+ Guide to Managing and Maintaining Your PC, Fifth Edition Hardware Needs Software to Work Hardware  Physical components of a computer  Visible part.
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 1 Introducing Hardware.
Lesson 2 - Hardware on the Inside
General Aviation Synthetic Vision Display For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Friday,
1 INS Data Collection System For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Wednesday October 10 th,
RIALTO Routine Inflight Assessment of Lower Tropospheric Oxidants.
GPS based time synchronization of PC hardware Antti Gröhn
Page 1 March 2007 CheckSource 2.3 Portable Power Phantom Load.
INS Data Collection System Presenter: Curtis Cutright Advisor: Dr. Michael Braasch.
Evaluation of a Truth Reference System for High Dynamic Flight Testing.
Motherboard and Bios. Generic Modern Motherboard.
Implementation of a Cost-Effective Head-Up Display for GA Aircraft For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation.
By: Eric Backman Advisor: Dr. Malinowski.  Introduction  Goals  Project Overview and Changes  Work Completed  Updated Schedule.
Grade 9 BTT - Hardware Notes. Prepared by: C. Novak - Ridgemont Hardware and Software Hardware is any part of the computer system you can see Software.
Head-Up Synthetic Vision Display System For The Joint University Program Friday, June 20 th 2003 Jahnavi Chakrabarty Douglas Burch Michael Braasch.
IT Essentials: PC Hardware and Software 1 Chapter 11 Troubleshooting PC Hardware.
Basic Input/Output System
November 15 Timing is Everything A software approach for a generalized profilometer Dr. John B. Ferris Stephen Chappell Cameron Rainey.
 Hardware compatibility means that software will run properly on the computer in which it is installed.  When purchasing software, look for one of these.
Hardware Lesson 2 Computer Components. Power supply (the heart) Takes electricity from the wall outlet and converts it into a current that works for the.
Enhanced Head-Up Display for General Aviation
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Computer Parts and Components Overview of the System.
1 Sarah Thomas, Curtis Cutright, Michael S. Braasch Avionics Engineering Center Ohio University, Athens Project Sponsor: NASA/FAA Joint University Program.
Lesson 2 Component Overview Core Hardware Fundamentals.
1 GPS/INS Flight Testing on the L-29 Delfin For the Quarterly Review of the Joint University Program for Air Transportation Research Friday, October 18.
Mini Autonomous Flying Vehicle CASDE is part of the National effort to develop a Micro Air Vehicle. CASDE has chosen a Mini Vehicle, in the short term,
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
KNU RTLAB A Real-Time Linux System For Autonomous Navigation And Flight Attitude Control Of An Uninhabited Aerial Vehicle Charles E. Hall, Jr. Mechanical.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Fan Assembly Driven by Magnetic Fields
Power Supply.
I-Station Hardware, Installation & maintenance
SCADA for Remote Industrial Plant
0. What is a Computer?.
Computer Fundamentals
ICT Programming Lesson 2:
1.00 Examine the role of hardware and software.
ITEC 1011 Introduction to Information Technologies 0. What is a Computer?
Advances and Best Practices in Airborne Gravimetry from the U. S
Presentation transcript:

1 Flight Test Instrumentation Package for the L-29 Delfin Turbojet For the Quarterly Review of the NASA/FAA Joint University Program for Air Transportation Research Friday June 14 th, 2002 Michael S. Braasch, Ph.D., P.E. Curtis Cutright Jansen Litter Avionics Engineering Center Ohio University, Athens

2 Purpose Hardware/software sensor testbed Software INS/GPS integration Noise versus dynamic tracking error trade off Synthetic aperture radar Aircraft system id/flight control design educational tool

3 Flight Test Vehicle L - 29 Delfin High Altitude 11 Km High Speed 354 knots Fully Aerobatic Flight Specs Taken From

4 Delphin Equipment Navigation Grade INS Industrial Keyboard Shock-hardened Computer Industrial Flat Panel Display NovAtel GPS Receiver Tactical Grade IMU *The IMU will be integrated into the system at a later date

5 Project Development Initial equipment installation is complete GPS and INS data collected simultaneously in real time In process of supplying INS unit with 28VDC

6 System Block Schematic ADCINS PC104 GPS data 12 VDC Aircraft Power 28 VDC INV 115VAC/ 400Hz Potentiometer data Power Data

7 INS Data Collection System Power Specifications UnitVoltageCurrentPower INS115VAC/400 HZ 2A230W INS (backup)28VDC10A280W INS Cooling Fan 28VDC PC VDC11A Max85W Max ADC28VDC350mA10W Max Monitor12VDC3.5A42W GPS6-18VDC2.8W(3.3W Max)

8 PC104 Power Distribution ComponentVoltageCurrentPower CPU Module5VDC2A(1.5A Max)10W CM102 Floppy5VDC125mA625mW CMT107 Hard- drive 5VDC1A max(fused)5W Network Card5VDC200mA1W Keyboard5VDC200mA1W GPS+12VDC235mA2.8W

9 PC104 Power Availability VoltageCurrentPower 5VDC12A60W +12VDC2A24W -12VDC500mA6W Maximum Power Output From PC104: 75W

10 10 System Schematic ADC Baro Return Baro Signal +5 Baro Excitation HLHL Output +28V GND Case GND Potentiometer

11 11 System Schematic Continued K4 K5 H L ADC Data VAC Chassis GND +28V +28V GND INS Unit H L Input H L Output Mode Select A8 A9 G7 G8 F1 ON (M1) Middle Insert Lower Insert Middle Insert A5SDI-MSB

12 12 System Schematic Continued ARINC Card PC104 Initialization Data Serial Port 2 Serial Port V +5V GND +12V GND +12V Power Plug

13 13 System Schematic Continued +12V +12V GND Power Serial Port I/O 1 PPS Novatel GPS Receiver

14 14 Installed Equipment ADCInverter

15 15

16 16 Installed Equipment Continued Industrial Keyboard INS On Switch

17 17 Installed Equipment Continued Novatel GPS ReceiverControl Switches

18 18 Installed Equipment Continued GPS Antenna

19 19 GPS Data

20 20 GPS Data Continued Rolls Hammer Head Stall

21 21 GPS Data Continued

22 22 INS INS Data has been collected on one flight test Latitude and Longitude was post processed from the collected data Initially, data seemed to be fine

23 23 GPS and INS Data

24 24 GPS and INS Data Continued

25 25 GPS and INS Data Continued

26 26 GPS and INS Data Continued

27 27 Analysis GPS and INS drift apart as expected 6 Mile difference by end of flight test Error much too large for INS unit

28 28 Analysis Continued A problem with the INS installation was discovered and corrected INS can send unreliable data if not initialized properly Error was masked from view

29 29 INS Static Test

30 30 INS Static Test

31 31 INS Static Test

32 32 Conclusion INS and GPS data collection is ongoing INS data collection software is still being refined and updated More flight testing is needed to determine if the INS problem is really fixed

33 33 Contact Information Principle Investigator:Dr. Michael Braasch Research Engineer:Curtis Cutright Research Associate:Jansen Litter