M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting 22.06.2009.

Slides:



Advertisements
Similar presentations
CoRe 2 Final meeting Introduction agenda Jenneke Lokhoff 12 & 13 August.
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Sequences and Series Day 2&3 Happy Monday
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
MUON piquet report 18/9 -24/ Nikolai Bondar.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Muon System Safety Issues Burkhard Schmidt.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Muon Stations M2-M5 Hardware status Outline: Gas System status UF/PNPI HV-system status Remaining M2-M5 installation tasks – Air cooling system status.
Alice overview New detector and chamber ALICE TC.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
TODAY IS MONDAY THE 16 th OF NOVEMBER 2015 ON MONDAY WE ARE WORKING WITH THE LAPTOP.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
ANNOUNCEMENTS ANNOUNCEMENTS WEDNESDAY, NOVEMBER 4, 2015 TODAY IS A “B” DAY.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Update on the M1 schedule Muon Meeting March 23, 2009 Burkhard Schmidt.
Fall Weather Unit Your Fall Weather Update! By: Reporter ____________.
The Calendar.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
CALO News Pascal Perret LPC Clermont 22 January 2012.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
CBETA Technical Review
ScECAL+AHCAL+TCMT Combined Beam FNAL
UK CMS Oversight Committee Mtg
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Presentation transcript:

M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting

Planning 2 nd layer Chamber installation for the 2 nd layer of A-side front to completed in the coming days: - 7 R3 will be installed hopefully tomorrow, the 4 R4 chambers on Friday  Completion two weeks behind the planning, but not critical

Planning 2 nd layer Alignment of the 2 nd layer of the C-side has been completed today On the A-side it started and should be completed by the end of next week. Testing on the A-side is progressing slowly, but: Fernando is back ! It should be completed LATEST by middle of next week!

Planning for the coming weeks Week 25 (June 15-19): – Complete alignment C-side, Tidy up cabling on the C-side  There are only 3 weeks left to complete the M1-installation ! Week 26 (June 22-26): – Complete chamber installation, – Complete A-back testing and alignment; – Install moving system control parts and guides; – Complete cooling system Week 27 (June 29-July 3): – Complete A-front testing and alignment – Tidy up cabling on the A-side Week 28 (July 6-10): – Close M1 and align/survey it

Tasks week 26 (June 22-26) Detector movements: ECAL A-side partially closed this morning for alignment of A-back D-column; to be reopened tomorrow afternoon. Also SPD/PS has to be opened by ~1m then. M1 A-side will be closed on Wednesday for alignment of A-back B- and A- column.  Final closing of M2-M5 will take place on Wednesday, followed by a survey on Thursday. Other tasks: Work on the installation of the air cooling system resumed today and will be completed this week (Luca, Bernard, Burkhard). The filters needed to solve the problem with the ‘variators’ of the air cooling system of M2-5 have been installed on the A-side. Problem fixed. To be done on the C-side (Nikolai, Burkhard). Work on the commissioning of the temperature sensors (PT100) for M1 should be completed this week (Rafael, Burkhard). Replacement of HV resistors and the subsequent tests of the UF/PNPI HV- system has resumed last week. On track.