Slide 1 One world. One name. Anritsu T1-000102 Chairman’s Report for TSG-T1 SIG SWG T1-000102 Dan Fox.

Slides:



Advertisements
Similar presentations
Proposed Revised Mission of the Conformance Sig Current Mission Statement –The SIG Conformance will provide mechanisms for : 1. Specification of conformance.
Advertisements

World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #55 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #54 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(12)
1 A Firm Step of 3GPP for UE Conformance & Interoperability Shicheng Hu ETSI PTCC 22 May 2003.
1 Femto Cell System Overview S.P Status Update to CDG and Femto Forum Fukuoka, Japan, September 2010.
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
TF160 / SS VENDORS SESSION 3GPP RAN5#65 10 – 14 November 2014 Venice, Italy R5-14xxxx Presented by TF160 Leader © ETSI All rights reserved.
STF421 ITS G5 TESTING – AN OVERVIEW – CEN DSRC – ITS G5 Coexistence Workshop - Presented by Friedbert Berens, in Ispra, Italy STF421 – An Overview -
GFOI Baseline Global Data Strategy Document: Discussion S. Ward, G. Dyke Space Data Coordination Group meeting #2 Reston, VA, USA September 2012.
Doc.: IEEE /0707r0 Submission May 2011 Minyoung Park, Intel Corp.Slide 1 Overview on TGah Specification Framework Development Date:
Towards International Alignment Introduction to the Canadian Health Data Model and potential contribution to HL7 Harmonization processes.
Optimized M2M interworking with mobile networks Group Name: oneM2M REQ Source: Takanori Iwai, NEC, Meeting Date: Agenda.
11/10/20151 A Standalone Content Sharing Application for Spontaneous Communities of Mobile Handhelds Authors: Amir Krifa –
Kick off Meeting. Discussion Points Definitions Education Communication Training Project Goals Project Scope Training Scope Learning Objectives Roles.
Critical Communications Workshop, 26-27/August 1 © 3GPP 2012 © 3GPP GPP Status Balazs Bertenyi Chairman of 3GPP TSG SA.
1 An Analysis of 3GPP and 3GPP2 Requirements for Common IMS January 2008 Source:Aleksandar M. Gogic, Chair TSG-S WG-1.
UN Expert Group on Statistics of International Trade in Services (EG-SITS) Ronald Jansen Chief of the Trade Statistics Branch United Nations Statistics.
CJK IMT 28 Xi’an, China 2-3 June /n CJK IMT 28, Xi’an, China CJK-IMT Summary of AWG-10 HIROIKE, Akira
Certificate IV in Project Management Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
Protocol Testing GSM /GPRS Protocols: MM, CC, RR,Physical Layer, RF & NAS UMTS Protocols: NAS, RRC,RLC,MAC,BMC,PDCP, Physical Layer, RF,QoS Core specs.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
Transient BCE for Proxy Mobile IPv6 draft-ietf-mipshop-transient-bce-pmipv6-00.txt Oliver Marco
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP
MCC TF160 / SS VENDORS SESSION 3GPP RAN5#69 16 th – 20 th November 2015 Anaheim, USA R5-15xxxx MCC TF160 © ETSI All rights reserved.
CS 350, slide set 11 M. Overstreet Old Dominion University Spring 2006.
March 2010 – IAASB to consider issues paper and task force proposals June 2010 – IAASB first read of exposure draft (prior to next IESBA meeting) September.
Doc.: IEEE /0240r1 Submission November 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – November 2006 IEEE P
September 28, 2006 Page 1 3GPP2 MMD Status for IMS Workshop Jack Nasielski
ESEA FLEXIBILITY RENEWAL REVIEW PROCESS MAY 6, 2015.
Doc.: IEEE /0137r0 Submission July 2006 Victor Tawil, MSTVSlide 1 Convergence toward an IEEE Standard IEEE P Wireless RANs Date:
CEOS Self-Study Preliminary Ideas on Implementation: Toward a Refined CEOS Michael H. Freilich Incoming Chair, CEOS-SIT
3GPP2 Specification Development David Crowe cdma2000 Technology Workshop June 14, 2012 – Guangzhou, China Draft Version 0.1.
Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Remote Pet Feeder Project Status Update Team member1 Team member2 Team member3 Team member4 9 February 2016.
A Case Study – demonstrating the Public Health Good Practice Scheme application and assessment process 15 October 2010 Presenter: Adam Jones.
A Case Study – demonstrating the Public Health Good Practice Scheme application and assessment process A Case Study – demonstrating the Public Health Wales.
Doc.: IEEE /0958r0 Submission September 2005 Knut Evensen, Q-Free ASASlide 1 ETSI-TG37-liaison-report-september-2005 Notice: This document has.
Lenoir County Public Schools New North Carolina Principal Evaluation Process 2008.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
1 Presentation Title 3GPP WORK ON 5G Presenter Erik Guttman Session
Proposal for Document Structure
Change Request Management
NR workload management
IEEE P Working Group for Wireless Personal Area NetworksTM
3GPP interworking in R3 Group Name: ARC
WPM ad-hoc group report TP#25
Reliability Assessment Guidebook (RAG): Status Report
Reliability Assessment Guidebook (RAG): Status Report
3GPP Status.
Change Control Process
Primary Care Patient Safety Learning Collaborative
TGac Ad-hoc lifecycle model
CITE tests for and HMA-T Phase 2 Progress Meeting
EMEP/CORINAIR Atmospheric Emission Inventory Guidebook
IEEE Coexistence SC closing report in Irvine in January 2018
UPDATE on SVN & MANTIS Upgrade
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
Input for ad hoc on software update on 7th Dec. from Japan
Input for ad hoc on software update on 7th Dec. from Japan
TTA Activities on IMT-Advanced standardization
Presentation transcript:

Slide 1 One world. One name. Anritsu T Chairman’s Report for TSG-T1 SIG SWG T Dan Fox

Slide 2 One world. One name. Anritsu T Meeting schedule l Yokohama l T1/SIG #10 l Sophia Antipolis l TTCN Ad-hoc l Harpenden l T1/SIG #11

Slide 3 One world. One name. Anritsu T Status of activities l Progressed TS for submission for TSG-T approval

Slide 4 One world. One name. Anritsu T Status of activities 2 l Recruited two expert teams l Task 160 for TTCN ATS development l Task 161 for additional Prose development l Defined environments for tests l Sys Infos l Cell configurations l RRC message contents l Most RF parameters l Radio Bearer configurations

Slide 5 One world. One name. Anritsu T Main open issues l Instability in core specifications l Expect high workload in processing CRs l Insufficient progress made on TS l Delayed start to TTCN expert team (160) l No voluntary contributions towards TTCN framework l March schedule cannot be met to without significant voluntary contributions

Slide 6 One world. One name. Anritsu T TS restructuring l 8 RRC l 9MM l 10CC l 11SM l 12GMM l 13General Tests (Emergency call) l 14Radio Bearer Services l 15Supplementary Services l 16SMS l 17UE Features

Slide 7 One world. One name. Anritsu T TS l Defer until September meeting l does not provide all the information that was expected l provides useful material, but is not yet stable l Input from test cases requires expert guidance, and could be provided better by Task 161 team. l RF View: l Support the proposal as they expect some changes in test cases following RAN decisions in June. l EMC l No involved

Slide 8 One world. One name. Anritsu T Issues requiring T1 decision l Deferral/Future of TS l Approval of TS to version l Approval of TS to version l LS to TSG-T clarifying scope of TS

Slide 9 One world. One name. Anritsu T TTCN Schedule TS v /11/00 TS v /01/01 TS submitted for 09/02/01 v2.0.0/3.0.0 approval

Slide 10 One world. One name. Anritsu T Other LS proposed from T1/SIG T1 information only l Use of timers in specifications without tolerances or ranges. How exact is 30 seconds? l T1/SIG will inform relevant specifier (CN1) of the tolerance that will be tested to. l Approval via l Low battery voltage detection l LS to RAN 4 on clarification of core spec (missed at last meeting)