FVS, State - Transition Model Assumptions, and Yield tables – an Application in National Forest Planning Eric Henderson Analyst, Hiawatha National Forest,

Slides:



Advertisements
Similar presentations
The Central Washington Landscape Assessment (CWLA) project update and discussion.
Advertisements

EU INTAS SILVICS Project Pushchino Research Centre of the Russian Academy of Sciences Institute of Mathematical Problems in Biology (Pushchino.
Development of a Vegetation Classification System for the Northern Region Doug Berglund Renee Lundberg Renate Bush.
H EURISTIC S OLVER  Builds and tests alternative fuel treatment schedules (solutions) at each iteration  In each iteration:  Evaluates the effects of.
SIMULATION AND PLOT REMEASUREMENT ANALYSIS 10 YEAR CHANGES IN STAND STRUCTURE AND DENSITY VS PREDICTIONS OF THE WESTERN ROOT DISEASE MODEL HELEN MAFFEI.
Figure 3. Outlines of the study with links between different components used. The figure presents the main inputs and outputs from the model used (Glob3PG)
SIMulating Patterns and Processes at Landscape scaLEs HISTORIC RANGE of VARIABILITY.
Longleaf Maintenance Condition Class 1 Revised Draft for Longleaf Partnership Council Discussion Clay Ware April 7, 2014.
1 Yield Implications of Variable Retention Harvesting VR Team: Mario Di Lucca, Ken Polsson, Jim Goudie, and Tim Bogle Research & Timber Supply Branches.
Timber Management Elements of Forestry Kenneth Williams
1.Area regulation 2.Volume regulation 3.Structural regulation Approaches to regulation in the selection method and maintaining a balanced stand with sustainable.
What is Silviculture? Silviculture is the application of the principles of forest ecology to a stand of trees to help meet specified objectives. Objectives.
Lecture 7 Forestry 3218 Forest Mensuration II Lecture 7 Forest Inventories Avery and Burkhart Chapter 9.
Blue Mountains Forest Plan Revision Developing Long-term Sustainable Yield and ASQ Estimates December
SENSITIVITY ANALYSIS of the FOREST VEGETATION SIMULATOR Southern Variant (FVS-Sn) Nathan D. Herring Dr. Philip J. Radtke Virginia Tech Department of Forestry.
Forest Project Protocol v3.1 Use of FIA Data John Nickerson FIA Conference February 2010.
Reflections from Montana Todd Morgan – University of Montana Renate Bush – Northern Region, National Forest Systems.
Development of a Forest Vegetation Simulator variant and application software for Ontario Murray Woods, Sr Analyst, Forested Landscapes, OMNR Don Robinson,
Use of FVS for a Forest-wide Inventory SPOKANE INDIAN RESERVATION.
Growth and yield Harvesting Regeneration Thinning Fire and fuels.
Modeling Effects of Genetic Improvement in Loblolly Pine Plantations Barry D. Shiver Stephen Logan.
Impact of adjacency and green-up constraints on wood supply in Georgia, USA Michal Zasada, Chris J. Cieszewski, Roger C. Lowe, Don Reimer 2 nd International.
1 Merritt TSA Type II Silviculture Analysis Merritt, B.C. April 5th, 2007.
FOREST MANAGEMENT PRESCRIPTIONS Prescription = A schedule of activities for a stand, landscape, watershed, or other management unit Five key elements:
Brief History of Site Quality Estimation from a Forest Mensuration Perspective Eric C. Turnblom ESRM Forest Soils and Site Productivity - Autumn.
Examples. Using FEPF to identify priority treatment areas based on soil erosion potential and critical fish habitat In the Bitterroot Valley, MT.
TREMA Tree Management and Mapping software Raintop Computing - Oxford.
F.O.F.E.M. 5 First Order Fire Effects Module Adapted from: Missoula Fire Sciences Laboratory Systems for Environmental Management.
15 September 2003 SMC Fall Policy Meeting TreeLab (v1.0) Variable-density Yield Simulator for Immature, Managed Stands of Douglas-fir Sam D. Pittman Eric.
Impact of Southern Pine Beetle Outbreaks on Wildlife Habitat Suitability Maria D. Tchakerian 1, Robert N. Coulson 1, Jaehyung Yu 1, and Forrest Oliveria.
The Rural Technology Initiative –“Better technology in rural areas for managing forests for increased product and environmental values in support of local.
What Do You See? Message of the Day: The management objective determines whether a site is over, under, or fully stocked.
Comparison of FVS projection of oak decline on the Mark Twain National Forest to actual growth and mortality as measured over three FIA inventory cycles.
 Discuss silvicultural principles related to restoration/fuels treatments  Compare conditions from the 1900 Cheesman Lake reconstruction to current.
 Used by NRCS foresters  Simple and Quick way to determine  Average tree diameter  Range of tree diameters  Trees per acre  Stand composition 
R. LOWE, C. J. Cieszewski 1, H. J-H Whiffen 2, M. Zasada 3,4, B. E. Borders 5 1 Assistant Professor 2 Assistant Professor 3 Postdoctoral Fellow 5 Professor.
Bringing stand level fire risk to the landscape level: Fire risk assessment using FFE-FVS with the Landscape Management System. Kevin Ceder And James McCarter.
Wisconsin’s Continuous Forest Inventory State Forest Working Group Meeting Plymouth, WI May 10, 2006 Teague PrichardChip Scott WDNR State Lands SpecialistUSDA.
 Interactive programs with a User Interface  Available 24-7, on the national FIA Web site  Easy access to the national FIA database Generate Reports.
Rogue Valley LiDAR Mid Rogue River, South Roseburg, Rock Cr, Upper Coquille Flown in 2012 ~1.4 Million Acres ~650K BLM/ODF.
A Decision Support Demonstrator for Abiotic Damage to Trees, using a WWW Interface Ari Talkkari Roger Dunham.
FORS 8450 Advanced Forest Planning Lecture 21 Binary Search.
Planning for Inventory & Monitoring Chip Scott National Inventory & Monitoring Applications Center (FIA-NIMAC) Northern Research Station U.S. Forest Service.
SIMULATING THE IMPACT OF AREA BURNED ON GOALS FOR SUSTAINABLE FOREST MANAGEMENT Jimmie Chew, RMRS Christine Stalling, RMRS Barry Bollenbacher, Region One.
Lower Middle Regeneration Experiment - Climate & Regeneration INGY 2014 Fred C. Martin WA Dept. Natural Resources Olympia, WA.
AGEC/FNR 406 LECTURE year old Loblolly Pine plantation.
The Evolution of Forest Inventory on the Warm Springs Indian Reservation Allan D. Derickson Forest Planning & Inventory Supervisor Confederated Tribes.
A New Effort to Study Intensively Managed Pine Plantations CAPPS - Consortium for Accelerated Pine Production Studies.
Alder Supply + Red Alder Plantation Growth and Yield RAP ORGANON Glenn Ahrens Oregon State University Extension Forester.
Growth and Yield Lecture 6 (04/17/2015). Overview   Review of stand characteristics that affect growth   Basic Stand Growth Terminology Yield curve;
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
Comparisons of DFSIM, ORGANOIN and FVS David Marshall Olympia Forestry Sciences Laboratory PNW Research Station USDA Forest Service Growth Model Users.
INFORMATION MANAGEMENT Liz LaPoint Regional Management Team December 2013.
Projecting FIA Data With FVS and ORGANON Greg Latta Oregon State University College of Forest Resources.
Law of Variable Proportions
Introduction to Models Lecture 8 February 22, 2005.
Assessment & Planning All land ownerships All major upland systems.
The Effects of Spatial Patterns on Canopy Cover Estimated by FVS (Forest Vegetation Simulator) A Thesis Defense by Treg Christopher Committee Members:
Landscape Management & Harvest Model A Case Studies from Chequamegon National Forest EEES4760/6760 April 20, 2009 HARVEST used to simulate different landscapes.
USING THE FOREST VEGETATION SIMULATOR TO MODEL STAND DYNAMICS UNDER THE ASSUMPTION OF CHANGING CLIMATE Climate-FVS Version 0.1 Developed by : Nicholas.
GROWTH AND YIELD How will my forest grow? Dr. Glenn Glover School of Forestry & Wildlife Sciences Auburn University.
Forest Management Service Center Providing Biometric Services to the National Forest System Program Emphasis: We provide products and technical support.
CFI NPT Forestry & Fire Management Division.
Cruise Summaries.
Approaches to regulation in the selection method and maintaining a balanced stand with sustainable yield Area regulation Volume regulation Structural regulation.
FOR 350 Silviculture.
Developing Edition 3.0 of CIPSANON
FFA Forestry CDE – Elba High School – Mr. Davis
Conceptual Framework on Planning for Timber Supply
Cruise Considerations
Presentation transcript:

FVS, State - Transition Model Assumptions, and Yield tables – an Application in National Forest Planning Eric Henderson Analyst, Hiawatha National Forest, Michigan

Presentation Overview  The Hiawatha National Forest  Forest Planning Management Questions  Models used to answer questions  FVS application – an example  Conclusions

The Hiawatha National Forest  Located in Michigan’s Upper Peninsula  Approximately 900,000 acres  Recent plan revision completed Spring, 2006

Ecological Setting – Hiawatha  8 Ecological Land Types (ELTs) identified Distinct ecological function  Successional pathways  Disturbances  Climax Vegetation group

Seral Classes  Within each ELT all possible seral classes are identified (Approx. 130 total)  Example – within ELT 10/20: J1 - Regenerated jack pine : 0 – 4.5 feet tall J2 - Seed/Sap jack pine: 4.5 feet – 5” DBH J3 - Pole jack pine: 5” – 9” DBH J4 - Mature jack pine: 9”- 18” DBH J5 - Overmature jack pine: 18”+ DBH (improbable)

Key Vegetation Management Questions: 1. What do we want the forest to look like (desired future conditions)? Manager/specialist – derived Set for each seral class 2. What are the natural processes that affect vegetative conditions? 3. How do we move to desired condition from our current status?

Models to address Questions 2 and 3  What are the natural processes to consider? Vegetation Dynamics Development Tool (VDDT)  Simple state-and-transition model  Easy to change and evaluate assumptions  How to move to desired conditions? Spectrum linear programming model  Can emulate the function of a state-transition model (VDDT)  Selects optimal management strategy to move to desired condition

VDDT – A state-transition model Inputs: Successional pathways and probabilities Disturbance pathways and probabilities Starting Conditions

Spectrum – model inputs (Model II/Model III formulation)  Successional paths and probabilities  Disturbance paths and probabilities  Starting Conditions  Treatment options  Economic information (including timber values and volumes)  Goals (Desired Future Conditions)  Constraints (e.g. non-declining yield)

Data Sources  Succession Expert opinion, empirical data, scientific study (?)  Disturbance paths and probabilities Expert opinion, historical data, scientific study  Starting Conditions Forest Database  Treatment options Silviculturist  Economic information Historical data  Goals (Desired Future Conditions) Managers  Constraints (e.g. non-declining yield) Plan directives, Laws, etc.

Goal of this study Provide analysis to support or strengthen model succession assumptions Provide analysis to support or strengthen model growth and yield assumptions

Why are the assumptions important? A few reasons:  Growth rates affect management rotation lengths  Some disturbance probabilities linked to structure and/or size classifications  Forest plan vegetation goals set for each state (model “box”)

Successional Pathways  Example: the aspen “A” trajectory 5 size classes (states) Min/max goals set for each state Ages associated with each state – how good are our expert-derived assumptions?

How did we assess our assumptions?  We used FVS to simulate stand growth and capture state “switches” FIA data stratified by Ecological Land Type and dominant covertype (source: FIA forest type call, GIS intersection with ELT map) FIA-derived age was analyzed and outliers were modified or adjusted to strengthen starting point Other calibration files developed: maximum BA, max SDI, diameter growth rate, defect, maximum tree sizes Algorithmic keyfiles developed to capture seral class at each age  FVS was also used to develop yield tables

Ex: One Species Even-aged stand No Yes No Yes No Yes No Yes No Yes Determine whether stand is species of concern BA of species < 30% of total? At each time step Determine Size Class 1 Remove stand from analysis TPA of species < 20% of total Avg Hght 30%-70% tree < 4.5 ft? TPA under 4.5 ft < TPA over 4.5 ft? Size Class 1 Determine Size Class 2-5 Size Class 2 has greatest BA? Size Class 3 has greatest BA? Size Class 4 has greatest BA? Size Class 2Size Class 3 Size Class 4 Size Class 5

Other algorithms developed  Even-aged multi-species seral types  Uneven-aged multi-species seral types

Results  Succession State Key metrics Average seral class Mode Number of plots  Yield tables from historic data vs. FVS- derived yield tables

Output file  Remove outliers  Remove succession  Quantify outputs _STAGE,_SZCLASS 5,1,2,3, 10,1,2,3,2, 15,1,2,3,2, 20,2,3,3,2, 25,2,3,4,2, 30,3,3,4,3,3, 35,3,3,4,3,3, 40,3,4,4,3,3, 45,3,4,4,3,3,4, 50,3,4,4,4,3,4, 55,3,4,4,5,4,4,3,1,4, 60,3,4,4,2,4,4,4,3,1,4, 65,3,4,4,2,4,6,4,4,4,1,4, 70,3,4,4,2,4,6,4,4,4,1,4, 75,4,4,4,2,4,6,4,4,4,1,4,4, 80,4,4,4,3,4,6,4,4,4,4,4,4, 85,4,4,4,3,4,6,4,4,4,4,4,4, 90,4,4,4,3,4,6,4,4,4,4,4,4, 95,4,4,4,3,4,6,4,4,4,4,4,4, 100,4,4,4,3,4,4,4,4,4,4,4, 105,4,3,4,4,4,4,4,4,4, 110,4,3,4,4,4,4,4,4, 115,4,3,4,4,4,4,4,4, 120,4,4,4,4,4,4,4,4, 125,4,4,4,4,4,3,4,4, 130,4,4,5,4,3,4,4, 135,4,4,5,4,3,4,4, 140,4,4,5,4,4,4,4, 145,4,4,5,4,4,4, 150,4,4,5,5,4,4, 155,5,5,4, 160,5,5, 165,5, 170,5,

Simple Outputs Graphs

Output graphs – compare assumptions

Changes on the Hiawatha  Of 26 successional pathways 8 were modified to reflect better information generated by FVS The other 18 remained the same; FVS provided a basis of support for those assumptions

Yield Table Comparisons

Changes on the Hiawatha  121 Yield tables developed 84 derived from FVS runs 37 derived from historic data/expert opinion  Mostly used where there were too few FIA plots

Conclusions  Expert opinion on successional states mostly supported  FVS runs shed light on “gray areas” where model succession assumptions were adjusted  FVS provided good information for 70% of the yields used in the Spectrum model  Better model assumptions lead to a better forest plan and more informed decisions