SPP.org 1. Draft Business as Usual Plan SPP.org 3 Wind - Business as Usual.

Slides:



Advertisements
Similar presentations
Westar Energy Transmission Operations: An Update on Regional and Local Transmission Activity June 22, 2010 Presented to Attendees of Westars Transmission.
Advertisements

Transmission Expansion Kansas Wind and Renewable Energy Conference Topeka, KS September 23, 2008.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
SPP Priority Projects Nebraska Area FCITC Sensitivity Analysis.
SPP.org 1. Economic Portfolio Update – CAWG Meeting – AEP Offices, Dallas August 27, 2008.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Utility’s Perspective Of Future Transmission September 23, 2008.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
Southern Star Central Gas Pipeline, Inc August 31, 2005.
Tres Amigas Presentation Team
Transmission Formula Rate Annual True-Up Customer Meeting
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
1 TECHNOLOGICAL CONSIDERATION ON ENERGY COOPERATION OF N-E ASIA OCTOBER, 18, 2002 SUNWOO, HYUN-BUM.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
The Transmission Imperative November 3, 2011 Jay Caspary.
Offshore Wind Update Massachusetts Wind Working Group Nils Bolgen May 28, 2014.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Kansas Renewable Energy KDHE Geology Seminar September 05, 2013 TAKING RENEWABLE ENERGY TO HEART. Taking renewable energy to heart.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
SPP.org 1. SPP: Demand Response and Advanced Metering in Arkansas.
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Melissa Seymour Midwest Market Structure Iberdrola Renewables June 7, 2010 Mid-America Regulatory Conference Kansas City, MO Integrating Renewables on.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Transmission Issues & Renewables Perspectives of a Wind Developer.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
Balanced Portfolio 1 Project Original Cost Estimate Q Latest Update Cost Variance% Change Sooner - Cleveland 345 kV $33,530,000$58,906,000$59,880,000$26,350, %
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
1.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
OPPD’s Wind Development in Nebraska Nebraska Wind Energy Conference November 9, 2009 Christene Bywater, P.E. Project Manager.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
3nd Quarter 2014 VRL Report Gentry Tubbs
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
EI-WECC Seams Study Needed
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
Nebraska Wind Conference Wednesday, November 16, 2011
Status Update for Reliability/Market Power Mitigation Assessment
I-5 Corridor Reinforcement Project
SPSG Meeting August 17, 2016 Salt Lake City, UT
Access Capacity Upgrades Larry Holloway Chief of Energy Operations
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Kansas Electric Transmission Authority (KETA)
Strategic Plan and Economic Upgrade Process
Presentation transcript:

SPP.org 1

Draft Business as Usual Plan

SPP.org 3 Wind - Business as Usual

SPP.org 4 Wind Requirement Per State Futures 1 & 3 Wind in GW State (in SPP) Existing & Construction WindAdditional WindWind Requirement AR KS LA000.4 MO NE NM0.2 OK TX121.7 SPP Total

SPP.org Transfers to Meet Requirements 5 6 intra-State Transfers 3 inter-State Transfers

SPP.org 6 Satisfying the Future’s Requirement The expected wind energy must be achieved while maintaining voltage  Each state’s capacity and wind requirement modeled as a source-sink transfer  PV analysis  Transfer increased until near voltage collapse

SPP.org 7 Satisfying the Future’s Requirement The expected wind energy must be achieved while maintaining thermal limits  Each state’s capacity and wind requirement modeled as a source-sink transfer  Limitations to the transfers due to 345 kV contingencies identified  Focuses upon regional issues rather than local issues

SPP.org 8 Issue Areas & Corridors Voltage  No major issues encountered, up to expected business-as-usual levels  Results in-line with the latest Generation Interconnection Study Thermal  230 & 345 kV in the Texas panhandle  345 kV corridor in mid-Kansas  230 & 345 kV corridor in east Kansas

SPP.org 9 Satisfying the Future’s Requirement SPP system with NTC projects

SPP.org 10 Limiting Corridors

SPP.org 11 Least Cost Planning Approach Installation cost & design simplicity  Shortest distances  Lowest Cost  Existing termination points  Only 345 kV and above projects considered  Emphasis given to previously studied projects

SPP.org Least Cost Plan Components Texas panhandle  Tolk – Potter Co  Potter Co – Stateline East Kansas  Jeffrey – Iatan Mid-Kansas  Spearville – Wichita  Wichita – Rose Hill Oklahoma  Stateline – Anadarko 12

SPP.org 13 Business as Usual Least-Cost Plan

SPP.org 14 Lease Cost Plan Meets Requirements With proposed projects, limits are eliminated

SPP.org Balanced PortfolioPriority ProjectsSTEP 345 kV projectsITP20 identified 345 kV lines

SPP.org Potential projects for further study Texas panhandle  Frio Draw – Tolk  Tolk – Tuco  Tuco – Potter Co. East Kansas  Jeffrey – Swissvale  Jeffrey – Auburn Mid-Kansas  Medicine Lodge – Viola  Viola - Wichita  Knoll – Summit  Spearville – Reno Co. 16

SPP.org 17 Correlation to State of the Market Flowgates Top 10 flowgates for July 2009 – July Osage Switch - Canyon East (115) ftlo Bushland - Deaf Smith (230) 2 Lake Road – Alabama (161) ftlo Iatan to Stranger Creek (345) 3 Randall County - Palo Duro (115) ftlo Amarillo – Swisher (230) 4 Lone Oak to Sardis (138) ftlo Pittsburg – Valiant Shamrock XFR (115/69) ftlo Tuco – Oklaunion (345) 6 El Paso – Farber (138) ftlo Wichita – Woodring (345) 7 Kelly – Seneca (115) ftlo E Manhattan – Concordia (230) 8Gentleman to Redwillow (345) 9 Holcomb – Plymell Switch (115) ftlo Holcomb - Spearville (345) 10 Mansfield – Int. Paper (138) ftlo Dolet Hills – Swisher (345) 1 &

SPP.org 18 Seams Integration Expectation of thermal limitations in other futures’ least cost designs  Nebraska – Iowa border near Omaha  Kansas City area  Ft. Smith area  East Texas

SPP.org 19 Stakeholder Feedback Comments regarding study approach Alternative project suggestions Areas for development

SPP.org 20 Futures Staff will begin development of least-cost plans for these three futures Same process as business as usual case

SPP.org 21 Timeline for Futures August 2010  Least-cost plans for futures September 2010  Single, flexible plan for all futures  Cost-effective transmission analysis October 2010  Robustness evaluation  Limited reliability assessment

Ben Roubique Lead Engineer, Technical Studies & Modeling