Karnataka Renewable Energy Development Limited

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

An Introduction ppt - Saurabh Mehta
Ministry of New & Renewable Energy B- 14, CGO Complex, Lodhi Road New Delhi Biomass Power in India – An Overview by VK JAIN Director & NPC Ministry.
Solar PV system - financial assistance and incentives
Dr. Bader Eddin Al-Majali
Petroleum, Chemicals and Petrochemicals Investment region (PCPIRs) Specialty Chemicals Conclave
Renewable Energy Program in Jordan
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Renewable Energy Program Arab Union for Electricity
1 Presentation by Mr. D.C. Samant, Chairman Rajasthan Electricity Regulatory Commission November 5, 2009 Washington D.C. SOLAR ENERGY IN RAJASTHAN.
Power Market Opening for Renewable Energy Case of Maghreb Countries 3 rd MEDREG-IMME Seminar Reform and Opening of Maghreb Electricity Markets Session.
11 Energy Policy in Denmark MONGOLIAN ENERGY DELEGATION 9 September 2013 Danish Energy Agency.
Prayas - EGI Presentation - 14 IACC, Bangkok, Nov Clean Energy and Regulation: Challenge of information asymmetry and weak oversight Shantanu Dixit.
Photovoltaic Power Applications in Japan For FinSolar project Aalto University School of Business Kim Yukyeong.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
Effective Frameworks for Renewable Energy Deployment: A Regional Overview Oman Energy & Water Conference May 19, 2015.
Initiatives on Solar Energy on Northern Railway By A. K. Singhal CEGE/NR 10th January’2015.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Karnataka Renewable Energy Development Limited
Renewable Energy Sector
Proprietary & Confidential Renewable Energy Industry Scenario in India and Emerging Collaboration Opportunities A présentation by : K N Subramaniam
1. Objective of Seminar Energy sector at a glanceProfiles in Energy SectorAbout SynergemSeizing the opportunities 2.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
PV Policy Group KOM Catania, 6-7 October About PV in Portugal Luís Silva Pedro Paes Hybrid PV-Wind power plant.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Solar Energy John Holecek ESP Global Energy production Total Energy Production (Wh) (1.1 E17) Electricity Production (Wh)
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Biofuels at the level of the Common Market for Eastern and Southern Africa (COMESA) Presented to First High Level Biofuels Seminar in Africa Addis Ababa,
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
Best Practices on Building Energy Efficiency 49 th EWG and Associated Meetings Gyeongju, Republic of Korea 24 th Jun 2015 Kumareshan Energy Commission,
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
RENEWABLE ENERGY POTENTIAL IN INDIA
B.V. Rao GM,IREDA 21 st September 2010, Hotel Lalit, New Delhi Conference on Solar Energy Institutional Finance for Solar Projects.
Indo-European Workshop on Solar Energy 21 April, 2011 IIT Jodhpur Policy, Regulatory & Financing Issues.
Where India Stands - Energy Demand (mtoe) India is the Fourth Largest Energy Consumer Source:BP Stat 2010 Low per capita energy consumption (toe)
Suzlon Energy Ltd 1 Clean Technology Opportunities in India -Chintan Shah Suzlon Energy Ltd 30 th March, 2016.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Registrations | Subsidies | Loans. Introduction Yashika Enterprises is a well-known name in Thane District (Mumbai). Established in 2011 We offer a very.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) POLICY 2014 DEPARTMENT OF INFORMATION TECHNOLOGY GOVERNMENT OF ODISHA.
Incentives For Use Of Renewables
About CleanMax Solar Largest rooftop solar developer in India with ~25% all India market share All India presence with 5 offices and solar plants across.
Enabling rooftop PV in Morocco
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Solar ROOFTOP- Challenges & INNOVATIONS TO ACHIEVE 40 GW
Operationalizing One Nation One Grid
Template for country interventions (5 min)
Growth of Renewable Energy in India
Renewable Energy Development in India
Financing of Solar power plants
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Power Scenario, Renewable Energy and General Manager (SOLAR)
bihar electricity regulatory commission
EXPANDING THE SOLAR MANUFACTURING SUPPLY CHAIN
Detail | Customise | Optimise
Presentation transcript:

Karnataka Renewable Energy Development Limited – Karnataka Renewable Energy Development Limited

Introduction. 1 Karnataka - Supporting Renewable Initiatives • 2015 1

Karnataka, a state with significant potential for all forms of energy. Section 1 – Introduction. Karnataka, a state with significant potential for all forms of energy. The total installed capacity of the state ~ 14.2GW (Nov 2014). Thermal and hydro have been the main sources of electricity in the state. Renewable energy accounts for ~31% of installed capacity. Renewable energy potential is estimated in excess of 30.2 GW. Government has allotted projects of 13 GW wind and 782MW solar. KREDL, established in 1996 by the Government of Karnataka as the state nodal agency has added ~4.7 GW of renewable based capacities since incorporation and plays an active role. Karnataka - Supporting Renewable Initiatives • 2015 2

Section 1 – Introduction. Why Karnataka for renewables? Capacity addition planned across all forms of renewables. One of the fastest growing states and a leading investment destination has a total installed power generation capacity of 14.2 GW. Karnataka is one of the top 4 states with installed renewable energy generation capacity. Coal based power generation contributes the maximum with its share around 41%. The state with 3.5GW has the 2nd largest Hydel capacity in the country. Share of renewable energy in the overall capacity mix today in MW terms in Karnataka stands at an impressive 31%. Opportunity for capacity addition across all forms of renewables Renewable Energy Source Capacity Potential (MW) Capacity commissioned (MW ) Wind 13983 2614 Small Hydro 3000 785 Cogeneration 2000 1144 Biomass 1000 113 Solar PV 10,000 84 Municipal Solid Waste 135 -  Total 30118 4741 25 GW state RE potential to harness Karnataka - Supporting Renewable Initiatives • 2015 3

One State, many investment opportunity. 2 “With access to natural resources like coal and gas being a challenge, a naturally preferred and reliable option is renewable energy” Karnataka - Supporting Renewable Initiatives • 2015 4

Section 2 – One State, many investment opportunity. 1. Solar power. Karnataka receives global solar radiation in the range of 5.1 - 6.4 kWh/m2 (summer), 3.5 - 5.3 kWh/m2 (monsoon), and 3.8 – 5.9 kWh/m2 (winter), making solar energy generation across all seasons. KREDL estimates a potential of over 5GW. Large amount of area available in urban areas in the form of roof tops can be used for solar energy generation. Capacity allocation – A transparent competitive price discovery model on regulator determined tariff. Industry friendly policy and regulations. No Cross subsidy surcharge (3rd party); No transmission and wheeling charge and 100% banking for open access projects. State is promoting Utility scale on-grid projects; roof top projects with net metering policy; decentralized on-grid projects through “farmers category” and other off –grid projects. Karnataka - Supporting Renewable Initiatives • 2015 5

Section 2 – One State, many investment opportunity. Solar power - Karnataka Solar Policy 2014-21 In support of the national and state targets, with over 700MW in development. Key initiatives. GoK encourages energy-efficient design standards for energy generation, maximizing natural light entry, options that provide heat insulation including grid tied building integrated PV (BIPV) Amendments t0 building bye laws in respect of FAR (Floor Area Ratio) to exempt FAR in respect of additional floor area created under solar PV panels. Policy supports deployment of solar powered irrigation pump sets. Solar parks. Development of solar parks helps to utilize uneven waste land for power generation. GoK contemplates to create private land banks owned by farmers or associations for development of solar projects on long term lease up-to 30 years at lease rates. Grid tied canal corridor projects. Grid connected “solar with other renewable hybrid projects”. To maximise existing project infrastructure. Hybrid projects having minimum 25% of overall generation coming from respective generation sources shall be promoted through this policy. Government of Karnataka (GoK) on 22nd May 2014 revised its existing state solar power policy 2000 MW (in phased manner) by 2021 i.e. 3% of solar energy out of total projected consumption. Grid connected projects - 1600 MW. Projects by land owning farmers - 300 MW. Projects under REC mechanism, captive/group captive, IPPs – No limit. Projects under bundled power Projects selected by competitive bidding (capacity > 3 MWp) Grid connected rooftop projects – 400 MW by 2018. Rooftop solar to be promoted; net-metering provisions included. Karnataka - Supporting Renewable Initiatives • 2015 6

Incentives & support to solar power projects. (1) Section 2 – One State, many investment opportunity. Incentives & support to solar power projects. (1) Time bound permissions to acquire land under section 109 of land reforms act and deemed conversion of lands acquired. Time bound clearance for evacuation approval from KPTCL. Reduction of supervision charges by KPTCL/ESCOMs from 10% to 5%. Exempted for obtaining clearance from state pollution control Board. Fiscal incentives Developers can avail tax concessions in respect of Entry Tax, Stamp Duty and Registration as per industrial policy of GoK. Measures to exempt VAT: The Value Added Tax applicable on various Renewable Energy Equipment's, Instruments & inputs required for establishment of Solar Power Project shall be considered for applicable VAT reimbursement. Government of India incentives: Concessional Excise Duty & Customs Duty exemptions are allowed to project developer by Ministry of New & Renewable Energy. Karnataka - Supporting Renewable Initiatives • 2015 7

Incentives & support to solar power projects. (2) Section 2 – One State, many investment opportunity. Incentives & support to solar power projects. (2) Solar roof top PV systems and net metering . Solar Roof Top PV systems can be installed on residential /commercial / industrial buildings in the state. Excess Generated energy can be fed to the grid with net metering Attractive Tariff for roof top solar: Rs. 9.56/ - Without Subsidy Rs . 7.20/ - With Subsidy Surya Raitha Scheme for Promoting Solar Irrigation Pumpset. To promote adoption of Solar PV pumpset by farmers, GoK has announced Surya Raitha scheme for Solar PV irrigation pumpset. This scheme is applicable for IP sets to the extent of 10HP capacity. Net-metering concept for rooftop solar power as per KERC order is being adopted for this scheme. For investment farmer can avail soft loan from banks and subsidy from MNRE. Karnataka - Supporting Renewable Initiatives • 2015 8

Incentives & support to solar power projects. (3) Section 2 – One State, many investment opportunity. Incentives & support to solar power projects. (3) Solar Parks The Solar Parks are to be developed in private dry lands/waste lands which will provide plug and play facility for developers. A MoU has been signed on 07.01.2015 between SECI and KREDL for development of 2 solar parks of 800 MW each in Karnataka. 11,000 acres of land has been identified at Pavagada Taluk in Tumkur District. Land Document verification is under process. Land lease rate will be finalised after negotiation. Promotion of distributed generation through small solar parks (Min 100 acre) Promotion of integrated solar parks. Karnataka supports the development of solar parks and provides incentives/ concessions to developers as per MNRE / SECI guidelines. 2 x 800 MW solar park for development. Karnataka - Supporting Renewable Initiatives • 2015 9

Section 2 – One State, many investment opportunity. 2. Wind power Karnataka is one of the wind-rich states in India and has a potential around 14 GW. Currently a capacity of 2.6 GW has been installed in the state. The capacity addition in state has been quite stable of around +250 MW/annum in the last 3 years. During the Financial year 2014-15, it was targeted to achieve 350 MW Wind Power Project in the State, of which 250 MW has been commissioned. Karnataka introduced preferential tariff framework in 2004, a key enabler with a tariff of Rs 4.20/kWh the state is one of the preferred destination for wind power projects in the country. Karnataka - Supporting Renewable Initiatives • 2015 10

WPD > 200 W/m2 at 100 and 120 mtr hub height Section 2 – One State, many investment opportunity. A 30GW* estimate at 100mtr hub height, opens up strong investment opportunity in wind power projects. WPD > 200 W/m2 at 100 and 120 mtr hub height Independent study, identifies various wind rich locations in the state (Bellary, Chitradurga, Chamrajnagar, parts of Kolar, Chikballapur, Hassan, Haveri, Gadag, Koppal and Bijapur), estimating over 30GW potential. With the simplification of land acquisition and conversion process, expedition of forest clearances, industrial status to wind power projects. Source: C-STEP * C-STEP estimate Karnataka - Supporting Renewable Initiatives • 2015 11

Section 2 – One State, many investment opportunity. 3. Small Hydro projects Karnataka state has high development and dependency on Hydel power which contributes to around 28% of state generation. Karnataka state is endowed with small hydro power potential estimated to be about 3000MW, of which only 25% has been harnessed so far. A tariff of Rs 4.16/kWh is one of the best in the country for a high PLF region. With the simplification of land acquisition and conversion process, expedition of forest clearances, industrial status to SHP projects, Land lease for 30 yrs+ (forest and Govt. land), MNRE subsidy up to Rs. 1 Cr / MW (for SHP). Karnataka - Supporting Renewable Initiatives • 2015 12

4. Biomass and Cogen power Section 2 – One State, many investment opportunity. 4. Biomass and Cogen power Simplified land acquisition and conversion process, industrial status, and tariff of Rs 4.83/kWh for Cogen and Rs 5.15/kWh for biomass based projects is one of the best in the country. GoI and GoK offer various exemptions and incentives like Central excise duty exemptions, Tax holiday, Customs Duty exemption, and VAT reimbursement up to 50%. Karnataka - Supporting Renewable Initiatives • 2015 13

Summary … Investor friendly state for renewable energy projects Section 2 – One State, many investment opportunity. Summary … Investor friendly state for renewable energy projects Amendments to “Renewable energy policy” to attract investments in SHP, Wind, Biomass and Co-generation projects, to accelerate the capacity addition plans in the state. Industry status to RE projects, simple land conversion and forest clearance, attractive Feed-in-Tariffs promote wind , SHP, Biomass & Co-gen power projects. Attractive tariff for Net metering & roof top solar; Amendments to building bye laws for Floor Area Ratio (FAR) exemptions driving the growth of roof top solar PV project investments. Open bid process & competitive tariff for solar PV projects; Industrial friendly regulations support open access projects with waiver of open access charges , loss & 100% banking for solar projects. Central excise duty exemptions, Tax holiday, Customs Duty exemption, and upto 50% VAT reimbursement. Karnataka - Supporting Renewable Initiatives • 2015 14

Thank You Web Link: www.kredlinfo.in