Wide Field Corrector Current status / risk assessment Gary Hill and Hanshin Lee 1.

Slides:



Advertisements
Similar presentations
Lab 1 Paraxial Optics Lab in 106A. Look at paraxial optics rules Use a bi-convex singlet at 1:1 conjugates Do it double pass so can see image Lateral.
Advertisements

Software Quality Assurance Plan
COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
The Wave Nature of Light
PHYS 1442 – Section 004 Lecture #21 Wednesday April 9, 2014 Dr. Andrew Brandt Ch 24 Wave Nature of Light Diffraction by a Single Slit or Disk Diffraction.
Nasrin Ghanbari OPTI 521. Introduction Spherical wavefront from interferometer is incident on CGH Reflected light will have an aspheric phase function.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
Géraldine Guerri Post-doc CSL
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Optical Alignment with Computer Generated Holograms
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Newton’s Rings Another method for observing interference in light waves is to place a planoconvex lens on top of a flat glass surface, as in Figure 24.8a.
Figuring large off-axis segments to the diffraction limit Hubert Martin Steward Observatory University of Arizona.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Lab 3 - Centering. Centering; or the smart way to align centered optical elements and systems This lab will make use of concepts used in the previous.
Software Project Management
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Optical Design Work for a Laser-Fiber Scanned
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
LASER AND ADVANCES IN METROLOGY
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
1 NSF Engineering Research Center for Reconfigurable Manufacturing Systems University of Michigan College of Engineering Cylinder Bore Inspection Engineering.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Telescope Integration and Tests Tuesday Afternoon.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
Comments from Rob Durham’s Visit September 24-25, 2007.
1 김 수 동 Dept. of Computer Science Soongsil University Tel Fax
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Interference Applications Physics 202 Professor Lee Carkner Lecture 25.
Zero field The 25 ‑ m f /0.7 primary mirror for the Giant Magellan Telescope (GMT) is made of seven 8.4 ‑ m segments in a close packed array. Each of the.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
Micromechanical Testing of Thin Films WarrenOliver MTS Nano Instruments Oak Ridge, Tennessee.
Absolute Calibration of Null Correctors Using Dual-Computer- Generated Holograms (CGHs) Proteep Mallik, Jim Burge, Rene Zehnder, College of Optical Sciences,
Optical Sciences Center and Steward Observatory University of Arizona
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 Design and analysis for interferometric measurements of the GMT primary mirror segments J. H. Burge a,b, L. B. Kot a, H. M. Martin a, R. Zehnder b, C.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Diamond Radiator Fabrication and Assessment Brendan Pratt Fridah Mokaya Richard Jones University of Connecticut GlueX Collaboration Meeting, Jefferson.
LITHOGRAPHY IN THE TOP-DOWN PROCESS - BASICS
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
Optomechanical Technologies for Astronomy, SPIE 6273 (2006)1 Manufacture of a 1.7 m prototype of the GMT primary mirror segments Buddy Martin a, Jim Burge.
X-ray Interferometer Mirror Module ISAL Study Pre-work Overview.
다양한 창문을 통한 우주 내용 왜 다양한 창문 ? 왜 다양한 창문 ? 대기의 영향 대기의 영향 망원경의 성능 망원경의 성능 관측에서 얻는 정보 관측에서 얻는 정보 중요 망원경들 중요 망원경들 차세대 망원경들 차세대 망원경들.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
BigBite Gas Cherenkov Update July 21, 2008 Brad Sawatzky (& Doug Higinbotham) ● I apologize for being out of town for this meeting – I booked my trip before.
Lab 2 Alignment.
Lab 3 - Centering.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Lab 1 Paraxial Optics Lab in 106A.
Blanco F/8 Status AURA Observatory Council, Tucson, 3/2013.
Detector building Notes of our discussion
T980 STATUS AND CHANGES FOR
Composite Mirror Applications, Inc
Sprint Planning April 2018.
Presentation transcript:

Wide Field Corrector Current status / risk assessment Gary Hill and Hanshin Lee 1

Overview Where we were at the Readiness review (7/16). –All mirrors have been fabricated to the specification. –The WFC structure has been built and tested. –All mirrors have been coated and installed into the WFC structure at UA. –All mirrors have been aligned using Laser Tracker. –All alignment fixtures and instruments have been prepared. –About to begin fine alignment using center reference targets (CRTs). Major issues since the readiness review. –WFC optical design version control problem (8/21) –Center Reference Targets (CRTs) drifted mainly in tip/tilt (9/13). –M4 coating developed defects with degraded reflectance by 6-7% (11/6). 2

Issue 1 WFC design version control 3

WFC Design Version Control Issue M2 & M4 as-built prescriptions were not reflected in the formal WFC design release. Resolved by re-optimizing the ADC design (Phillip MacQueen, 9/5) and subsequently updating the WFC CAD model. The change in M2 & M4 prescriptions led to a large residual wavefront error (spherical aberration) of ~4waves in the M2-M3 CGH (Computer Generated Hologram) test. –This residual error can give a false signal for M2-M3 alignment. –UA’s analysis confirmed the current CGH is usable. –However, UA will procure a new CGH that matches (i.e. zero residual) the current as-built prescription of M2 and M3. M4/5 and System CGH tests turned out to be much less affected. 4

Issue 2 Center Reference Target (CRT) Drift 5

CRT drift issues M3 M2 M5 M4 M2 6

CRT Drift issue (1. Mirror optical axis registration) -Each mirror is aligned to the rotation axis of the air bearing. -Tip/tilt/Coma due to mirror centering error is monitored by rotating the mirror. M3 7

CRT Drift issue (2.Registration of CRT to Mirror) Tip/tilt registration by collimated beam Decenter registration by x10 imaging Note: There is a faint spot 8

CRT Drift issue (3.Registration transfer to SMRs) -Each CRT has three Spherically Mounted Retro-reflectors (SMRs) around the CGH. -The plane of SMRs are registered to the CGH in decenter/spacing/tip/tilt. : Measurement accuracy is < 2 micron in decenter and < 1.9arcsec in tip/tilt. -The SMRs form the surrogate of the CGH and facilitate Laser Tracker alignment. -Note: The CGH is yet to be registered in Z to the mirror vertex. 9

CRT Drift issue (4. Vertex spacing registration) -SMR on the mirror surface is measured around the OD and ID. -This provides the location of the mirror vertex. -SMRs on each CRT is registered in Z to this vertex location. -The SMRs on each CRT form the complete surrogate of the mirror. 10

CRT Drift issue (Most likely cause & current best knowledge) UA switched from UV curing epoxy to inadequate adhesive (RTV) in constructing the CRTs (without approval). This resulted in long- term drift of the CRTs within mechanical cells. –CRT decenter drift appears small enough. –CRT Piston is ok since it is done by Laser Tracker and SMRs. SMRs have not displaced. –CRT tip/tilt can not be used and further drift is expected. 11 CRT Decenter [μm]Tip/tilt [arcsec]Piston [μm] Old  New Tol. Old  New Tol. Old  New Tol. M2 CGH16.2  /  /  16 +/- 50 M3 CGH3.4  /  /  16 +/- 50 M4 CGH3.9  / (on-going) +/- 5 7 (no change) +/- 10 M5 CGH7.3  9.1 +/  /  9.7 +/- 10

New alignment plan 12

New alignment plan (Summary) New M4 reference registered to M4 axis in tip/tilt/decenter. –M4 becomes the decenter / tip / tilt / spacing reference as in the original alignment plan. All mirrors aligned to M4. –Decenter done by Alignment Telescope (AT) looking at the CRT centers. –Spacing done by LT and SMRs. –Tip/tilt done by LT and SMRs (this will bring the tip/tilt close to the nominal). Use M4-M5 and M2-M3 CGH tests as the alignment tools –Adjust M2/3/5 tip/tilt for optimal wavefront of each pair. Use Conjugate test for M4-M5 alignment verification. Use System CGH test for the full system alignment verification (3/27/2014) –UA is developing a back-up system verification test 13

New alignment plan (Registration of new M4 reference to M4 axis) New M4 tip/tilt/decenter reference –Mounted to the same Kinematic mounts as used for M4 CRT. –Fabrication / assembly done. –Being registered to M4 axis at this moment. 14

New alignment plan (Registration of new M4 reference to M4 axis) Registration procedure –Custom alignment telescope registered to M4 optical axis. This is done on a 5-DOF stage (i.e. x,y,tip,tilt,rho). Existing M4 CRTs are independently verified to be good in decenter. Two non-contact probes capture tip / tilt of the alignment telescope w.r.t. M4 surface on rotation. –New reference is mounted on the back of M4. –On rotation, the alignment telescope first probes tip / tilt of the new reference. –New reference is adjusted in tip/tilt accordingly. –New reference has cross-hair + concentric ring patterns that are going to be used as the decenter registration feature. 15

New alignment plan (Registration of new M4 reference to M4 axis) 16

New alignment plan (Registration of new M4 reference to M4 axis) 17 M4 + Head-ring M4 Pier mount Custom alignment telescope Rotary air-bearing X-Y translation stage Tip/tilt stage CRT & New reference goes on the back of M4 through this cylinder.

New alignment plan (CGH alignment tests) 18 M4/M5 CGH alignment test M2/M3 CGH alignment test Interferometer System verification test

New alignment plan (Analysis and performance estimation) UA conducted extensive analysis of the predicted performance of the WFC over the past 2 months. –Monte-Carlo simulations for M4-M5 and M2-M3 CGH tests. –Monte-Carlo simulations for System CGH tests based on the MC realizations of two pairs. Results. –All performance requirements can be met. –The wavefront compensation scheme is not expected to result in misalignment-driven field-dependent aberrations. 19

New alignment plan challenges The alignment plan requires: –Highly sensitive measurements ( ~ a few microns, ~ a few 10 nm). –Highly precise adjustment of the mirrors ( ~ a few microns). UA has the adequate collection of good metrology equipment and highly skilled opticians and a brilliant graduate student. UA’s Jeff Kingsley and Chang Jin Oh and Hanshin Lee updated the schedule and new alignment plan using the best and most realistic information available. UA is committed to put their best effort to complete the alignment in time. We do think the new plan is solid and do our best to stay on schedule.  We know only partially the technical landscape of the alignment.  UA’s history indicates that we should expect delay in UA’s alignment plan. 20

Issue 3 M4 coating degradation 21

M4 coating degradation 22 A B M4 under super-bright LED flash light A: Locally peeled-off dielectric layer surrounded by complete peel-off B: Bluish mottling effect underneath the coating During inspection on 12/4, both A & B showed more brown color.  Indication of Ag-layer being oxidized.

M4 coating degradation 23 M4 under LED illumination Light passing through the boundary of the defect

M4 coating degradation 24 M4 6in witness developed the same mottling effect

M4 coating degradation 25

M4 coating degradation (Possible causes & current best knowledge) Contamination –STF was flooded during Storm Sandy and coating chambers had water leaks. –STF coating involves two machines 10 ft apart and transfer from one to the other imposes high likelihood of contamination. –However, STF claims contamination cannot be the cause. Spectral measurement indicates the coating is failing. –Mottling effect indicates contamination as the most likely cause. –We experienced similar mottling effects in VIRUS collimator mirror coatings. –Joe Tufts also experienced local peel-off of dielectric layer. –STF does not have any explanation for this degradation. –LCOGT coating shows very similar degradation as M4 coating. STF’s coating is a huge risk for the WFU. 26

M4 coating degradation (Stripping M4 coating) Logan Schoolcraft at HET succeeded in chemically stripping off the coating from the 6in witness in 3 hours. –We believe M4 coating can also be stripped off as well. –Logan and Jerry Martin are preparing a stripping fixture for M4. 27 Stripping in Hydro-ChlorideAfter stripping

M4 re-coating options 28 Option Cost [$k] Time [wk] RiskMerit JDS Uniphase Long lead-time, higher cost -Limited flexibility in scheduling - Successfully built M2/3/5 coating. - State-of-the-art thin film metrology/control. ZeCoat No experience with this vendor’s coating. - David Shiekh developed the adaptation of LL Ag coating (LL coating used in SALT). - Currently running 3 Ag jobs similar to M4. - Drew Phillips (at Lick) is likely to use ZeCoat’s Ag coating for Keck Cosmic Web Imager. - Durability likely to exceed our requirement. - Quick turn-around and more flexibility in scheduling Quantum Coatings Inc. > 10 (TBC) 12 (TBC) - Bad experience with FSS99. - Reflectance per mirror fails to meet the spec. - Very un-responsive and Drew was told (as of May) that Quantum is getting out of business in metallic coating  Development work less likely. - Limited flexibility in scheduling. - More recent Ag coating (UV350-Ag) seems durable (1.5yr old on 107’’). Lick observatory TBD - Reflectance per mirror fails to meet the spec. - No experience with this coating. - Collaborative development possible. - Produced Ag coating before for internal use. Aluminum coating < 10 (TBC) < 6 (TBC) - Large throughput hit. -Durable / quick turn-around. -Many vendors exist

M4 re-coating options 29

WFC Schedule & Path forward 30

WFC key milestones in 2014 M4-M5 CGH alignment : Feb 3 M4-M5 Conjugate verification test : Feb 10 M2-M3 CGH alignment : March 10 System verification test (technical effort in Tucson complete): March 27 WFC delivered without M4 : April 24 M4 delivered to the observatory : May 16 (TBD) M4 re-assembled / WFC re-aligned / system re-verified : June 13 (TBD) WFC ready for installation : June 13 (TBD) We have great confidence in the technical aspects of the new alignment plan and system verification In spite of our intense focus on the technical and management aspects, we feel that the above schedule has risk based on UAs past performance –Which, unlike stocks, is probably a good predictor of future performance We should come up with contingency plans for ensuring good use of the time, should the durations of the UA effort be doubled (6 months instead of 3) –system verification in June rather than March; installation in September

Path forward on UA alignment & M4 coating UA alignment. –We have very close supervision of UA’s effort. Hanshin Lee visits UA every two weeks. Gary Hill is visiting at least every month to reinforce supervision. –Insisting on close involvement of key personnel (i.e. Jim Burge). –Hanshin Lee is keeping action item list and reviewing it every week during weekly telecons. –Herman Kriel is in close contact with Jeff Kingsley on project management issues. –We have taken on mechanical designs/fabrication for remaining fixturing of CGH tests and others. M4 Coating. –Eliminate STF on durability; eliminate enhanced Al on performance –In parallel, pursue JDSU, ZeCoat, Quantum, Lick obs. to refine cost / schedule / performance estimates. –Funding situation may dictate path, but we aim to choose the most durable and best performing coating that we can afford. –Schedule is extremely important.