EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) FOR

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Barhale Procedure for Site Establishment
EMERGENCY PREPAREDNESS B Y : Mr. P. K. Patel.. Plant Emergency Manual * Major hazards of plant in terms of raw materials, processes, equipments, chemical.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Emergency Preparedness and Response
Fire Emergency Plan Lesson on Fire Emergency Plan.
Airport Emergency Plan - Overview
There are three types of emergencies:  Internal  External  Natural disasters.
NERT College Disaster Operations Disaster Operations - ICS Command Staff Workshop Refer to Field Operations Guide, Chapter 5.
Contra Costa County CERT Program Unit 6 – CERT Organization Released: 18 August 2010.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Safety and Health Management Program
FIRE SAFETY Autor: Ljiljana Kovačević, VPTŠ Užice ВИСОКА ПОСЛОВНО- ТЕХНИЧКА ШКОЛА СТРУКОВНИХ СТУДИЈА У УЖИЦУ.
Compliance - Work Permit CAKE Session 17. Purpose of the Work permit system: The Purpose of the system is to: - Prevent undesired incidents and mitigate.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Terminal Safety. Objectives Identify main causes Outline terminal safety organization State the safe working practices.
Introduction Most accidents are caused by the uncontrolled release of hazardous energy. Many of these accidents can be prevented by proper lock-out/tag-out.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
MIDWEST WATER ANALYSTS ASSOCIATION JANUARY 30, 2015 EMERGENCY ACTION PLANS 1.
Building 90 BET Meeting S.Synarski 6/11/14. Agenda Reminder: Sign up for Lab Alert (2 min) October Drop, Cover, Hold, Evacuate Drill: Oct 16, 10:16am.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
BY Prashant P. Rane Safety, Health & Environment Gadegaon.
Spring 2008 Campus Emergency Management Program Overview
Incident Command System Basic Course
ERDMP OF IGL Experience and Lessons for other CGDs
Emergency Response & Control Procedure Emergency Response and Control Procedure (HSE-S-229) Best ERCP practices at RIL Jamnagar.
CNG for Clean & Green Environment WELCOME TO PRESENTATION ON EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) FOR INDRAPRASTHA GAS LIMITED ALOK.
WHS Management Plans.
Lumbermen’s Underwriting Alliance
Permit to Work Procedure Document Number: KOC.SA.004
Chapter 15 1 CHAPTER 15 – EMERGENCY RESPONSE PLAN CEE 698 – Construction Health and Safety.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Firefighter III Introduction Mod A Identify the Firefighter III’s role as a member of the organization. (4-2.1) The role of a firefighter III.
ISO EMERGENCY PREPAREDNESS AND RESPONSE
Incident Reporting Procedure
Corporate Health and Safety ArcelorMittal RS# 6 Emergencies and Incidents Draft date: Oct 5, 2011 Rev 1.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Course # Unit 3 - IEMP and PEMS. Unit 3 IEMP and PEMS Goals: Understand phases of emergency  Before the emergency (Mitigation, Prevention,
A Major Business Disruption A Strategy for Minimising the Downtime Anthony Hegarty Mitigating Risks.
ONSITE EMERGENCY MANAGEMENT PLAN. DISASTER Disaster in industry may be defined as one or more emergencies which can affect several or all plants / departments,
INITIAL PLANNING CONFERENCE FOR ARF DiREx 2015
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
School Emergency Response Training. Unit 1: Objectives  Describe the types of hazards most likely to affect your home and community.  Identify steps.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
ADM 677 Crisis Management in Educational Settings Karen McCuiston Kentucky Center For School Safety.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Ferris State University & Michigan Department of Career Development 1 Hazard Assessment.
Hazardous Materials Business Plan Training Topic 2
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
SITE EMERGENCY RESPONSE All sites are different. Different chemicals. Different configurations. Advance planning and training is necessary to protect worker.
Utilities and Crisis Management June 13, 2015 Carolyn Bermudez Vice President and General Manager, Operations.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
NIPPON STEEL PIPE INDIA PVT. LTD. EMERGENCY PREPAREDNESS & RESPONSE PLAN - FIRE.
Emergency Actions Emergency Actions are composed of two actions. 1) Tornado & Severe Weather 2) Emergency Evacuation.
Business Continuity Planning 101
Emergency Response For the Hazardous Waste Worker.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
District’s Plan for Disaster Preparedness.
Flammable and Combustible Liquids
FEED BACK & MONITORING PROCESS
Health and Safety Staff meeting 9/7/18.
Best ERCP practices at RIL Jamnagar
Firefighting equipment
Presentation transcript:

EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) FOR INDRAPRASTHA GAS LIMITED 1

ACCIDENT CASE STUDIES

CHATRASAL CNG STATION FIRE

CHATARSAL CNG STATION FIRE

PASCHIM VIHAR CNG STATION FIRE

PNG FIRE INCIDENT - 1

PNG FIRE INCIDENT - 1

PNG FIRE INCIDENT - 2

PNG FIRE INCIDENT - 2

PNG FIRE INCIDENT - 2

Glance at Prevailing Safety Practices in IGL Safety - Accorded Top Priority by Management and is the Top Agenda during all review meetings. The CNG Stations are designed as per Best National & International Codes and Standards. Safety is followed in Design, Construction and Operation of all Activities. 12

Glance at Prevailing Safety Practices in IGL Training is given Prime Importance and Regular Trainings are imparted to IGL Employees, Contract workers, CNG & PNG Consumers, Security Guards and Delhi Fire Service personnel. Multi-discipline Core Safety Groups trained from NEBOSH, UK ensures implementation of Safety Management System. Maintenance and Testing of Fire Fighting Systems are regularly carried out to check the availability. Regular Safety Audits are carried out by renowned & experienced agencies in the field of safety every year and the observations are complied. 13

FOR THE SAFETY OF SCHOOL CHILDREN TRAINING IMPARTED TO BUS DRIVERS AND OPERATORS OF CNG SCHOOL BUSES REGULARLY.

Fire & Safety Training to IGL Employees

Live Fire Fighting Training Live fire fighting training is imparted to IGL Employees, Station Staff and Consumers.

CNG Fire Training to Delhi Fire Service Personnel

EDUCATING CONSUMERS Free Service Camps are conducted to check the fitness of CNG vehicles and creating awareness among consumers. 20

FREE CHECKUPS OF CNG CARS

IGL’S INITIATIVES FOR CONSUMER SAFETY THE KEY TO CONSUMER SAFETY IS TO EDUCATE THEM AND MAKE THEM AWARE ABOUT THEIR SAFETY & THEIR FUEL

IGL’S INITIATIVES FOR CONSUMER SAFETY

IGL’S INITIATIVES FOR CONSUMER SAFETY

TRAINING AT TIHAR JAIL

TRAINING AT TIHAR JAIL

TRAINING AT TIHAR JAIL

DISASTER MANAGEMENT PLAN ERDMP EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) 32

FAILING TO PLAN IS PLANNING TO FAIL!!! Any emergency starts as a small incident BUT has the potential to become a major accident if not controlled in time. Control is necessary at incipient stage. A WELL OILED MACHINERY HAS TO BE IN PLACE IN DELHI NCR, EVEN A VERY SMALL INCIDENT CAN BE PORTRAYED UNFAVOURABLY!!!

OBJECTIVE OF THE ERDMP Safeguarding lives, environment and property at site and in its neighborhood; Containing the incident and bring it under control and restore normalcy at the earliest; Minimize damage to lives, property and environment; Rescue and treat casualties on priority; Assist district administration in evacuating people to safe areas; Extend necessary welfare assistance to casualties.

HOW WILL IT BE DONE? Providing information to all concerned on the estimated consequences of the events that are likely to develop; Warning and advising people who are likely to be affected; Mobilizing on-site and offsite resources; Calling up assistance from outside agencies; Initiating and organizing evacuation of affected people; Providing necessary first aid and other medical services that may be required; Collecting data on the latest developments, other information and requirements; Coordinating action taken by various agencies

KEY AIDS IN EMERGENCY PLANNING….AND RESPONSE….. EMERGENCY RESPONSE VANS…contain all key containment equipment and are mobile. Can be used to generate awareness and aid in planning (and also response) TRAINING VAN… can be used to generate awareness and aid in planning

Probable Emergencies CNG: Gas Leakage in CNG Equipments / Pipeline / Vehicles due to Safety Disc Rupture at CNG Station. Fire due Gas Leak Short Circuit in CNG vehicle Hose pulling / Hose Snaking Failure of Joints of Tubings / Nozzles / Break away Coupling / Bursting of Dispensing Hose Overturning of LCV - Mobile Cascade on Road

Probable Emergencies PNG: Gas Leakage due to: MDPE Line Damage due to Third Party Steel Pipeline due to Third Party Failure of Fittings (Flange Joints, TF, Regulators, Meters, Valves, Filters, Flow meters, Gauges, etc) Gas Leak due to above and Fire Falling a person from height Gas Leak and Fire inside Customer Premises due to: Unsafe Work Practices (by Customer or by Our Contractors) Failure of Fittings inside Customer premises Ethyl Mercaptan Leakage

POSSIBLE HAZARDS JET FIRE, FLASH FIRE OR UVCE DUE TO: Leakage through any valve, equipment (such as metering skids, filter etc.), small bore connection or flange/ gasket/ joint (such as Insulation joint) in the over ground sections at the SV, Dispatch or receiving stations. Leakage from pipeline section piping in either the underground or over ground section. Sudden opening of safety valve in the over ground section. Escape of gas during maintenance/repairs carried out During gas venting at the stations

As per PNGRB Gazette Notification GSR 39 (E) LEVELS OF EMERGENCIES …L1, L2, L3 Level 1: This is an emergency or an incident which - Can be effectively and safely managed and contained within the site, location or installation by the available resources; Has no impact outside the site, location or installation. Level 2: This is an emergency or an accident which – Cannot be effectively and safely managed or contained at the location or installation by available resources and additional support is alerted or required; Is having or has the potential to have an effect beyond the site , location or installation and where external support of mutual aid partner may be involved. Is likely to be danger to life, the environment or to industrial assets or reputation. Level 3: This is an emergency, incident with off-site impact which could be catastrophic and is likely to affect the population, property and environment inside and outside the installation, and management and control is done by district administration. Although the Level-III emergency fails under the purview of District Authority but till they step in. it should be responsibility of the unit to manage the emergency. Note: Level-I and Level-II shall normally be grouped as onsite emergency and level-III as off-site emergency.

LEVELS OF EMERGENCY RESPONSES… L1, L2, L3 (As per IGL’s ERDMP) Level 1: Level 1 Emergency may include the following Scenarios at our CNG stations & PNG Sites: Gas Leakage in CNG Equipments / Pipeline / Vehicles due to Safety Disc Rupture at CNG Station. Minor Fire due Gas Leak Short Circuit in CNG vehicle or any Station Equipment Hose pulling / Hose Snaking Failure of Joints of Tubings / Nozzles / Break away Coupling / Bursting of Dispensing Hose Minor Gas Leak in MDPE Line Failures from MDPE Line or Steel Line Fittings Minor First Aid Injuries to Workers or Employees

LEVELS OF EMERGENCY RESPONSES… L1, L2, L3 (As per IGL’s ERDMP) Level 2: Level 2 Emergency may include the following Scenarios at our CNG stations & PNG Sites: When the Level 1 Emergency could not be controlled and situation becomes uncontrolled and require intervention of external sources / help like Safety Disc Rupture in a Bus at CNG station and Caught Fire. Gas Leakage due to Station Tubing Joint /Ferrule Failure and subsequently caught fire engulfing CNG Vehicles came of refilling at CNG Station. Failure of Steel Pipeline due to Third Party Damage and subsequent Fire. Fire in Customer premises. Gas Leak and Fire due to the LCV Accident on Road

LEVELS OF EMERGENCY RESPONSES… L1, L2, L3 (As per our ERDMP) Level 3: Level 3 Emergency may include the following Scenarios at our CNG stations & PNG Sites: When the Level 2 Emergency could not be controlled and situation becomes uncontrolled and disastrous and requre help of district authorities like NDRF, etc. Ethyl Mercaptan Leakage & Spillage at the time of Handling, Unloading / Dosing. Main Pipeline Failure and Isolation could not be done due to - Natural Calamities like Floods, Earthquake. Sabotage and Arson during riots Aerial Attack Terrorist Attack Rupture of CNG Cylinders of Onboard Vehicle Cylinders, Mobile Cascade Cylinder, Stationary Cascade Cylinders leading multiple casualties.

ERDMP COMMUNICATION CHART WITH ROLES & RESPONSIBILITIES Marketing Officer 1.Rush to the site 2.Assist other departments in mitigating emergency & extend all possible relief to injured & their family members 3. Communicate to HOD. LEVEL 1 (CNG) Station Manager (INCIDENCE CONTROLLER) 1.Rush to the site 2.Information to emergency services 3.Communication to the Control room & all concerned & emergency services(100, 101 & 102). Fire & Safety Incharge 1.Rush to Site & Depute Fire Men on the site. 2.Assist in Controlling the emergency 3.Communication to HOD (F&S) 4.Gathering the data for Investigation of the Incident occurred. INCIDENT Station Operator 1. Rush to Incident Site 2. Information to Emergency services & Marketing Officer Technicians / DSMs / Security Guards 1.Rush to the site 2.Stop dispensing immediately 3.Control the emrgency and move the vehicle out from the station without Ignition on. 4.Gathering of public at the Assembly point. 5.Communication to the Concerned Shift Incharge (INCIDENT CONTROLLER) 1.Depute O&M representative on the site. 2.Assist in Controlling the emergency 3.Communication to Control Room Incharge & other concerned. 4. Check site, and declare All Clear. . LEVEL 2 EMERGENCY PROCEDURE FOLLOWS IF THE CONDITION ESCALATES

ERDMP COMMUNICATION CHART WITH ROLES & RESPONSIBILITIES LEVEL 1 (PNG) Information of Incident Received from: Telephone in CNG C/R Patrolling Security Guard Third Party / Media Shift Incharge (INCIDENT CONTROLLER) 1.Depute O&M representative on the site. 2.Assist in Controlling the emergency 3.Communication to Control Room Incharge & other concerned. 4. Check site, and declare All Clear. . INCIDENT Fire & Safety Incharge 1.Rush to Site & Depute Fire Men on the site. 2.Assist in Controlling the emergency 3.Communication to HOD (F&S) 4.Gathering the data for Investigation of the Incident occurred. Marketing Officer 1.Rush to the site 2.Assist other departments in mitigating emergency & extend all possible relief to injured & their family members 3. Communicate to HOD. LEVEL 2 EMERGENCY PROCEDURE FOLLOWS IF THE CONDITION ESCALATES

ERDMP COMMUNICATION CHART WITH ROLES & RESPONSIBILITIES LEVEL 2 (CNG / PNG) Factory Manager and Occupier: Rush to Emergency Control Center / Corporate Office and take charge of Chief Coordinator, taking regular updates from field. Media & PR Representative (Corporate Communication: Pass on information if required to media / press in coordination with Chief Coordinator Incident Coordinator (Control Room Incharge) Rush to site along with the representatives of Mechanical, Electrical, Instrumentation & Civil & take action for isolation of gas line After clearance of emergency, check site & give All Clear for operation. C&P: DGM (Stores) – Rush to Stores DGM (C&P) – Rush to Emergency Control Center / Corporate Office INCIDENCE CONTROLLER / SHIFT INCHARGE (LEVEL 1 EMERGENCY ESCALATED TO LEVEL 2)- Communication will be done as marked INCIDENT Fire & Safety Coordinator Rush to Incident Site Mobilise his team and Assist District Authorities & Keep Chief Coordinator updated. Finance Coordinator Nominate representative at site & arrange financial aid at head office for any emergent requirement of chief cordinator. PNG / CNG: Take Action to stabilise his area & necessary isolation (if required). Pass on information to HODs and concerned. HR Coordinator (Welfare / Security) Help to affected employees and their families, Arrange for Ambulance / Hospitalisation & Welfare measures at site. Communicate with Factory Inspectorate (If required). Marketing Officer: Rush to site, Assist other departments in mitigating emergency & extend all possible help to injured & their family members in coordination with HR coordinator. LEVEL 3 EMERGENCY PROCEDURE FOLLOWS IF THE CONDITION ESCALATES

ERDMP COMMUNICATION CHART WITH ROLES & RESPONSIBILITIES LEVEL 3 CONTROLLERS AT INCIDENT SITE CONTROLLERS AT ECC (EMERGENCY CONTROL CENTER) For Assisting Disaster Management Group HODs (Fire & Safety, Operations, Instrumentation, Electrical, City Gas) and Representatives of HR , Finance, Marketing & Civil will rush to site and Coordinate. MD, DC, VP (Marketing), VP (E&P), VP (Finance), GM (C&P), GM (Projects), HOD (Corporate Communication), HOD (HR), HOD (Regulatory Affairs) – For information to CCoE, PNGRB, etc. CHIEF COORDINATOR (CC): - MD / DC will be the Chief Coordinator (in their absence VP (Marketing) – Factory Manager will be Chief Coordinator. CC will arrange all necessary support / arrangements to control emergency & help to injured and their family memnbers. CHIEF COORDINATOR (CC): - Looking into the site requirement Chief Coordinator may station his team at Emergency Control Center or at site.

PIPELINE “EMERGENCY SHUT DOWN” OR ESD Total ESD of pipeline system (shutdown of the entire pipeline system- initiated in case of major accident in areas/places/locations along the pipeline. Localized ESD of Pipeline System (shut down of limited facilities along the pipeline- initiated when the cause of ESD is limited to a small area in the pipeline. CNG Station ESD (shut down of individual CNG station)

EARTHQUAKE AND OTHER NATURAL CALAMITIES MAJOR EARTHQUAKE AND OTHER NATURAL PHENOMENA: Total ESD of pipeline is operated by GAIL DESU-MARUTI pipeline, GAIL DESU-B’GARH pipeline, GAIL SV3 TO SONEPAT pipeline, GAIL DESU –NOIDA PIPELINE, GAIL GREP pipeline to stop gas supply to IGL. The Shahibabad and Mayur Vihar Tap off are also to be isolated in order to stop total gas supply to IGL network. SMALL SCALE EARTHQUAKE: Area Control Room Engineer to isolate local isolation valve to stop gas supply to affected area.

ASSEMBLY POINTS EARMARKED SAFE AREAS AT EACH FACILITY FOR EMERGENCY MUSTERING ROLL CALLS TAKEN THERE DURING DRILLS, PRE-DRILL AND POST DRILL SESSIONS HELD AT ASSEMBLY POINTS UPWIND OF HAZARD

LOCATIONS OF EMERGENCY CONTROL CENTERS (ECCs) FOR LEVEL 1 EMERGENCY – RESPECTIVE CNG / PNG CONTROL ROOMS FOR LEVEL 2 EMERGENCY – EMERGENCY CONTROL CENTERS AT 5 Nos. LOCATIONS (SHAKURPUR, NEW PITAMPURA, DWARKA SEC-20, NAGLAMCHI & GREATER NOIDA) FOR LEVEL 3 EMERGENCY – CORPORATE OFFICE – IGL BHAWAN

ERDMP IS AN ONGOING PROCESS ERDMP IS NOT A STATIC DOCUMENT NEEDS REGULAR DRILLS (TABLE TOP, TRUNCATED, FULL SCALE ETC.) WITH LESSONS LEARNT IMPLEMENTED ALL FORM A PART OF THE PROCESS AND EACH ONE HAS A ROLE. NEED TO FAMILIARIZE ONESELF.

IGL’s ERDMP AWARENESS PROGRAM STATUS WORKSHOPS CONDUCTED COVERING 100% EMPLOYEES AND CONTRACT WORKERS – DONE.

IGL’s ERDMP AWARENESS PROGRAM STATUS MOCK DRILLS CONDUCTED AFTER THE WORKSHOP AND OBSERVATIONS, RECOMMENDATIONS COMPLIED.

A FILM ON RECENT MOCKDRILL CONDUCTED FOR LEVEL-2 EMERGENCY

ACTIONS TAKEN AND OBSERVATIONS WERE RECORDED

RECOMMENDATIONS WERE COMPLIED

OBSERVER’S CHECKLIST

THANK YOU