1 The NSS Side Event AT SBSTA 18 Report of Study on the Methodologies and Its Application of Clean Development Mechanism in China Lu Xuedu Ministry of.

Slides:



Advertisements
Similar presentations
BASELINE STANDARD UNFCCC secretariat workshop
Advertisements

1 Antonio Soria Head of Unit Economics of Energy, Climate Change and Transport Institute for Prospective Technological Studies Joint Research Centre European.
Structure of DNA and Proposed Sustainable Development Criteria for CDM Projects In Bangladesh CDM Designated National Authority (DNA) Durbar Conference.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
International Climate Policy Hamburg Institute of International Economics International Climate Policy Graduation and deepening: a suggestion to move international.
Towards a Low Carbon Future: China’s Green Development Policy and Practice Ye QI Climate and Carbon Policy Institute (CPI) Tsinghua University & China.
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
INTERNATIONAL ENERGY AGENCY World Energy Outlook 2004: Key Trends and Challenges Marco Baroni Energy Analyst Economic Analysis Division INTERNATIONAL HYDROGEN.
1 The UK’s Climate Change Act: opportunities and challenges in building a low carbon economy
SGM P.R. Shukla. Second Generation Model Top-Down Economic Models  Project baseline carbon emissions over time for a country or group of countries 
MITIGATION POTENTIAL AND EMISSION REDUCTION CONFIDENTIAL 1.
Copenhagen 29 June Energy and climate outlook: Renewables in a world and European perspective Peter Russ.
1 Kyoto Mechanism and Technology Transfer April 9-10, 2003 UNFCCC WS on Technology Transfer Shigetaka SEKI Director for Environmental Affairs Ministry.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
UNFCCC Workshop, 9/ /1 2004, Dublin. September 30 – October 1, 2004, Dublin, Ireland Jiří Spitz ENVIROS, s. r. o. Czech Republic UNFCCC Workshop,
Energy Development in China - From a View Point of Sustainable Development Yang Hongwei, Zhou Dadi Energy Research Institute, P. R. China
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
CDM strategies to incorporate the developmental priorities and technological need: China Experience Cui Cheng Energy Research Institute National development.
Charting the Upsurge in Hydropower Development 2015
INTRODUCTION TO PLANNING OUTLINE CAPACITY DEVELOPMENT TO IMPLEMENT CDM IN VIETNAM Dr. Bui Huy Phung National Centre for Natural Science & Technology Mr.
OBJECTIVES The overall objective of this project is to build the private sector’s capacity in CDM project activities and related carbon trading concepts.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
“Establishment of the Clean Development Mechanism (CDM) National Authority, Operational Framework and Support Systems for the Philippines”
RESOURCE EFFICIENCY IN LATIN AMERICA: ECONOMICS AND OUTLOOK 1.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 Capacity Development for Policymakers,
Owen WILSON Environment and Sustainable Development Committee, EURELECTRIC POWER CHOICES EURELECTRIC Study on low-CO2 Europe by 2050 POWER CHOICES EURELECTRIC.
An Introdution of Energy Situation and Policy of ROK September 2010 Park, Jimin.
Beyond offsetting: Ambitious SBL as a national contribution to combat climate change Malin Ahlberg „Designated Focal Point/Designated National Authority“
Experiences and lessons learned from the TNA of China WANG Can Tsinghua University, China UNFCCC workshop on Technology Needs Assessments Bonn, Germany.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
A Sectoral Approach for the Cement Sector The Cement Sustainability Initiative (CSI) Patrick Verhagen, Holcim Group Support Ltd Keidanren/WBCSD joint seminar,
Low Carbon Development Practice and Roadmap Methodology for Guangdong Energy Strategy Research Centre Guangzhou Institute of Energy Conversion, CAS South.
RESOURCE EFFICIENCY IN LATIN AMERICA: ECONOMICS AND OUTLOOK 1.
© OECD/IEA 2010 Energy Policies of the Czech Republic 2010 In-depth Review Energy Policies of the Czech Republic 2010 In-depth Review Prague, 7 October.
1 DEDICATED TO MAKING A DIFFERENCE Vincent Mages Climate Change Initiatives VP Lafarge Greenhouse gas mitigation in the cement.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
The cement - EU ETS Kaleidoscope Holcim Group Support Bruno Vanderborght Vice President Environmental Strategy Holcim Group Paris, 05 September 2006.
Technologies of Climate Change Mitigation Climate Parliament Forum, May 26, 2011 Prof. Dr. Thomas Bruckner Institute for Infrastructure and Resources Management.
Technology Transfer and Investment Risk in International Emissions Trading (TETRIS) Work Package 3: Permit Supply from the CDM (TETRIS Meeting, Amsterdam,
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
Green Investment Schemes: Maximizing their benefits for climate and society Diana Urge-Vorsatz 24th. April.2008.
Developing a Framework for Offset Use in RGGI Opportunities and Risks Dale Bryk, NRDC and Brian Jones, MJB&A – Northeast Regional GHG Coalition RGGI Stakeholder.
The policy and plan on CDM Forum MDP Maroc Marrakech, April Italian Ministry for the Environment and Territory Department for Global Environment,
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Weathering the Change Action Plan 2 ACT Climate Change Council 8 November 2011.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Canada’s CDM & JI Office Project Facilitation Support Through Canada’s CDM and JI Office.
Examples of benefits assessment of low emissions development Iris Jiménez National Institute of Ecology and Climate Change Mexico October 14th.2015.
Gas Flaring Reduction: OPEC Views OPEC Secretariat.
Methodologies and Tools for Technology Needs Assessment: an Overview Zou Ji Dept. of environmental Economics and Management, Renmin University of China.
El Gallo Hydroelectricity Project PDD Analysis
© OECD/IEA 2015 Budapest, 19 October © OECD/IEA 2015 Energy & climate change today A major milestone in efforts to combat climate change is fast.
What constitutes a fair level of effort for individual Parties? Ben Gleisner: Post-2012 Emission Reduction Targets.
NS4054 Fall Term 2015 North America Energy Trilemma.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
© dreamstime CLIMATE CHANGE 2014 Mitigation of Climate Change Working Group III contribution to the IPCC Fifth Assessment Report.
© OECD/IEA Do we have the technology to secure energy supply and CO 2 neutrality? Insights from Energy Technology Perspectives 2010 Copenhagen,
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
| Paul Lucas 1 Future energy system challenges for Africa: Insights from Integrated Assessment Models 1 st Africa Sustainable Development Forum.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
World Energy and Environmental Outlook to 2030
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Baseline setting and monitoring under Joint Implementation
Presentation transcript:

1 The NSS Side Event AT SBSTA 18 Report of Study on the Methodologies and Its Application of Clean Development Mechanism in China Lu Xuedu Ministry of Science and Technology Beijing, China Andreas Oberheitmann/Othmar Schwank International Experts Germany/Switzerland June 12, 2003, BONN

2 Objectives Objectives: Enhancing the capacity on (1) Technique and Methodology; (2) Policy-making on CDM; and (3) implementation of CDM project

3 Activities Activities: 1. Methodology Study 2. CDM project Case Study 3. Analysis on the CERS demand and supply 4. CDM Feasibility Study

4 Participants Participants: Management level: World Bank State Secretariat Economy, Switzerland GTZ, Germany Environment Ministry, Italy Ministry of Science and Technology, PR China Representatives of the 5 Agencies form Steering Committee

5 Participants Participants: Technical Level: Swiss CDM Expert Team: INFRAS/EBP/LASEN Germany CDM Expert Team: RWI/Integration World Bank Expert team Chinese Expert Team: Tsinghua University

6 Timeframe Time frame of the project implementation: u Start: November, 2001, soon after COP-7 u Inception Report: July 2001 u First Progress Report: January, 2003 u Second Progress Report: July, 2003 u Final Report: September, 2003 u Final Workshop: Winter of 2003

7 Project Case Project Cases: 1.Wind Farm Project 2.Anaerobic Treatment of Effluent and Power Generation 3.Supercritical Coal-Fired Power Project 4.Gas-Fired Combined Cycle Tri-Generation Project; 5.Gas-Steam Combined Cycle Power Project 6.Landfill Gas Recovery and Power Generation Project

8 Summary of interim results, 2nd progress report u Task 1 Objectives: –To facilitate better understanding of CDM methodological and technical issues, and –Proper application of related methodologies in the case studies in Task 2 and more widely in China u 1.1 General overview: –1.2 Baseline –1.3 Project Boundary and Leakage –1.4 Additionality –1.5 Project based GHG abatement cost

9 Summary of the PRII (Task1+2) u 1.2 Baseline u Baseline at power sector level: –Technology benchmark and sectoral baseline at regional level reasonable for middle & large new power projects with high transparency; –Appropriateness of “ the top 20% average” approach needs to be justified case by case. –Dynamic baseline is necessary for China along with many changing in technological evolvement, policy & regulation, fuel availability and price, product structure, etc.; u Baseline at project level -Three baseline approaches of Para. 48 a), b), c) evaluated in the case of “Shanghai Wind Power, Phase II”: -Baseline based on the current mix -> highest emission factor –Baseline based on the average emissions in the past five years is the most conservative. –Planned coal fired addition to the Shanghai grid justified as appropriate baseline scenario.

10 Summary of the PRII (Task2) u For the new built fossil fuel power project u Case: Huaneng-Qinbei Supercritical Coal Fired Power Project: u Scenario1: Existing provincial grid mix, constant emission factor/kWh –Assuming not likely to build new coal fired power plants, while remaining existing grid capacity & mix without change up to 2020, is thus not very accurate. Baseline: 1.15 kg CO 2 /kWhe, ex ante. u Scenario 2: Recent additions only - built margin average emissions, 48c): –Very reasonable that the CDM project will most likely to replace or delay new coal fired power capacity otherwise in baseline case. –The capacity mix of the recent additions would not change significantly in the near future, so that the ex ante built margin grid mix is used. –Hydropower is “base load”, and thus rejected from into baseline. –By “top 20% average in past 5 years”, Baseline: 1.03 kg-CO 2 /kWhe. u Scenario 3: Combination of Existing Power Grid and Future Additions: –Combination of Scenario 1 with 2 but with ex post added up to –Due to less data availability, a trade-off is the combination of existing generation mix and Phase I of Qinbei. Baseline: 1.13 kg CO 2 /kWhe u Conclusion: Scenario 2 baseline methodology is justified as the most appropriate and conservative for Qinbei Supercritical Project.

11 Summary of the PRII (Task1+2) u 1.3 Project Boundary and Leakage Four leakage categories: F Activity shifting, F Market effect, F Life-cycle emissions shifting, and F Ecological leakage Application on the case study: F Whole life cycle approach applied to tri-generation project with gas-steam combined cycle: leakage significant-13~17% of the project’s total emissions F Suggestion: Project type related leakage coefficient and a 5% of benchmark threshold for significance, due to complex in upstream and downstream approach. F Further work needed to substantiate the definitions of project boundary and leakage as in the CDM M & P and Glossary by EB.

12 Summary of the PRII (Task1+2) u 1.4 Additionality Principles considered: F Easy operation; F Reflection of real situation; F Rational data required; F Limited system error; F Low uncertainty; F Low cost; and objective Application in the case of “Beijing No.3 Thermal Power Plant: F Application of various criteria in assessment of CDM additionality is project specific, does not mean overall exercises. F Availability of economic/financial data will be the most challenges, when detailed data viewed as confidential. F Additionality might be assessed with different conclusions for a same project activity when view from different aspects Result F An agreed integrated approach is needed with a view that the approach should eventually help to justify why the proposed CDM project is additional and not in the baseline scenario as required in the PDD.

13 Summary of the PRII (Task2) u For the new built fossil fuel power project u Case: Huaneng-Qinbei Supercritical Coal Fired Power Project: u Scenario1: Existing provincial grid mix, constant emission factor/kWh –Assuming not likely to build new coal fired power plants, while remaining existing grid capacity & mix without change up to 2020, is thus not very accurate. Baseline: 1.15 kg CO 2 /kWhe, ex ante. u Scenario 2: Recent additions only - built margin average emissions, 48c): –Very reasonable that the CDM project will most likely to replace or delay new coal fired power capacity otherwise in baseline case. –The capacity mix of the recent additions would not change significantly in the near future, so that the ex ante built margin grid mix is used. –Hydropower is “base load”, and thus rejected from into baseline. –By “top 20% average in past 5 years”, Baseline: 1.03 kg-CO 2 /kWhe. u Scenario 3: Combination of Existing Power Grid and Future Additions: –Combination of Scenario 1 with 2 but with ex post added up to –Due to less data availability, a trade-off is the combination of existing generation mix and Phase I of Qinbei. Baseline: 1.13 kg CO 2 /kWhe u Conclusion: Scenario 2 baseline methodology is justified as the most appropriate and conservative for Qinbei Supercritical Project.

14 Summary of the PRII (Task3) u 3 Task 3 Major objectives and specific research work: –A. Assess the global carbon trading supply and demand based on selected scenarios. –B1. Determine CERs supply potential in China, and –B2. MAC curve in the world carbon market under selected scenarios, –B3. Develop the equilibrium carbon trade volume and price for CERs of China under selected market structure scenarios. –C1. Assess the impacts of CDM on China’s economic development, –C2. Identify opportunity and economic benefits of CDM for China. –D1. Build capacity of application of analytical model tools in China –D2. Make recommendations on policy implications for China’s participation in CDM. u Major progress achieved –Revised Draft PRII submitted for comments in early May 2003 in which Work A and B, most of Work C were completed.

15 III. Summary of the PRII (Task3, MAC) u Fig MAC for CO 2 reduction in nine regions of the world

16 Summary of the PRII (Task3) (MAC) u Preliminary conclusions on MAC: u China and USA have lowest cost in absolute reduction amount and large emission reduction potential. u Middle East, Africa and Latin America have highest cost and relatively small potential for CO 2 emission reduction. u The MAC cost for China by IPAC here is higher than that derived by other modeling, due to relative low baseline emission estimation in our Task 3 study. While many modeling studies for China suggested relative low energy efficiency improvement since 1985/90 and as result, high emission trajectory.

17 III. Summary of the PRII (Task3, 3.2 Global carbon trading) u Table Global carbon trading market in base scenario by CERT Carbon amount (MtC)Profits (MUS$) Domestic action199.8 USA (30% participation) OECD-P OECD-W Hot Air / EFSU JI / EFSU82.5 CDM Southeast Asia and south Asia China Middle East4.036 Africa Latin America Total444 Price (US$/tC)19.2 (5.24US$/tCO 2 )

18 Summary of the PRII (Task3) (carbon trading) Market Structure Price (US$/tC, at 2000 price) Global CDM Potentials (MtC) China CDM Potentials (MtC) China's profits (M US$, at 2000 price) EFSU price leadership Perfect competition Monopoly Table Carbon trading simulation under different market structure Global carbon trading market analyzed by CERT. CERT model incorporates a variety of switches, such as − Implementation rate,  Transaction cost, − Supplementary,  Participation rate of USA, − Market structure, etc. to allow analyzing their impacts on the market. Global carbon trading influenced by market structures:  Perfect competition,  Monopoly, and  Price leadership.

19 Summary of the PRII (Task3) u Some conclusions for China’s CDM potentials and price: –Carbon price and CDM potential would largely depend on a number carbon market factors in particular economic growth in OECD and the strategies of Russia/Ukraine and the US –The combined scenario gives 32 MtC for China’s CDM potentials at 19.2 US$/tC/5.2US$/tCO 2 carbon price. –The MAC of these CDM projects shall fall into this price range –Considering technology additionality, the incremental abatement cost for CDM would in practice be much higher than the equilibrium carbon price obtained from the model. –Even though China’s profits from CDM might be small, side benefits from CDM projects such as employment, local environmental quality, technology progress, etc. should not be ignored.

20 III. Summary of the PRII (Task3) u 3.3. China’s CDM potentials by major 26 sectors, by using IPAC-AIM/Technology model, see Table Table Potential of CDM in major sectors in China SectorShare of CERsCERs (Mt-C) Steel Making 10%3-4 Cement 10%3-4 Chemical Industry 5%1-2 Power Generation 55%16-18 Other sector 20%6-8

21 III. Summary of the PRII (Task3) u Impact of CDM implementation on economic development of China simulated by using IPAC-SGM model: –Impact on economy with increased foreign investment by sale of CERs. Power sector is focused. –Impact of technology progress in China by technology transfer through CDM. The target year is –Impact on local environment improvement focusing on SO2 and other gases emission. –Impact on sector development with CDM, power sector is major concerned. u Preliminary results –CDM can contribute to China’s economic development by extending foreign investment, localization of advanced technologies and improving technology efficiency in China. –CDM has long-term benefit for China. GDP change increase from 0.02% in 2010 to 0.08% in 2020, then decrease to 0.05% in 2050.

22 Experience Experience for Implementation: u Guided by Steering Committee: ensure correct direction u Carried out by a National Team: capacity building u Supported technically by International CDM Team: ensure high quality and meet int’l requirements u Dialogue with domestic decision-makers on CDM: ensure to meet domestic requirements

23 Key Work for Future Key Work of this Project in future: u Work hard trying to meet the original timeframe u Submit high quality PDD of 6 cases u Host final Workshop for the case implementation

24 Perspectives for Future Perspectives for Future Cooperation: u Networking Business Sector, based on the technical study: for CDM project implementation u Networking Academic Community, based on the technical study: for CDM project technical support u Physical building of National Technical Support Unit for CDM implementation

25 For More Information Prof. Liu Deshun Global Climate Change Institute Tsinghua University Andreas Oberheitmann RWI, Essen Othmar Schwank INFRAS Zürich

26 For More Information Mr. Lu Xuedu Director, Division of Resources and Environment Ministry of Science andTechnology of China FAX (86-10)

27 Thank you for your attention