Construction of Longitudinal Joints 2014 VDOT/VAA Regional Asphalt Seminars Ken Arthur Quality Control Manager Templeton Paving.

Slides:



Advertisements
Similar presentations
Volvo Construction Equipment Road Institute Paving Principles.
Advertisements

Asphalt Pavement Laydown and Compaction
HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
By Robert J. Blight Project Engineer Bureau of Materials.
Welding Joints, Positions, and Symbols
PAVING. EXCAVATION WIDTH 1’ beyond edging 1’ beyond edging.
Segregation in Asphalt Paving Identification, causes & prevention
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
Asphalt Quality Task Force Update Regional Asphalt Seminar David P. Shiells, P.E. District Materials Engineer.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
AF2903 Road Construction and Maintenance Compaction of Hot Mix Asphalt
PPTG Thin Overlays Task Group (TOADS) Team Overlay Asphalt Debaters Presented by Basem Muallem (CT) - Tony Limas (Industry) April 19, 2005.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Uniform Paving Platform A Contractor’s Perspective J. Brent Moore Regional Manager Branscome, Inc. - Richmond.
HMA Construction Program Module 7 – Joint Construction.
HMA Construction Program
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
CIVL 598 Asphalt Paving Materials Asphalt Rubber.
General Issues an Asphalt Technology Longitudinal Joints.
Got Density? Asphalt Pavement Assn. of Indiana Winter Conference December 2010.
CIVL 598 Asphalt Paving Materials Asphalt Rubber.
Asphalt Quality Assurance Program
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Introduction to Asphalt Pavement Construction and Compaction For ODOT District 3 presented by.
AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt
Principles of Paving rev Principles of Paving.
Pavement Maintenance II
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
1 Asphalt Paving Athletic Surfaces Mike Vinton, CTCB.
Porous Asphalt The Specs Tim Horton, Skillings Connolly Jessica Knickerbocker, City of Tacoma Mark A. Palmer, P.E., LEED AP, City Engineer, City of Puyallup.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Thin and Ultra-Thin Overlays. 1.List benefits of thin and ultra-thin HMA overlays 2. Describe recommended materials 3. Describe recommended construction.
Working Successfully With Property Managers: An Interactive Engagement
Guidelines for Use of Highway Specifications for Airport Pavements
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
Soil Compaction Topic I Topic I.
Longitudinal Joint Adhesive Pavement Maintenance Bureau of Technical Services Paulette Hanna, P.E, M.Eng.
MT KEIRA PASS STABILISATION Wollongong City Council MT KEIRA PASS WORKS About 500m of rockfall hazard reduction works 180m of lower embankment anchoring.
Basic knowledge Asphalt paving
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
Clarifying Quality Control Bill Pine, Heritage Construction & Materials 56 th Illinois Bituminous Paving Conference.
HMA PLACEMENT. NCAT 2 To Be Covered Hauling Placement Compaction.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
PCS900 AccuGrade 3D Paving Training 3D Design Models & SVO/AGO & TBC
Designed with the Paving Professional in Mind
Extending Performance with Proper Asphalt Compaction
Russian Engineers Workshop
Pavers & Mix Laydown Module 6. Pavers & Mix Laydown  Review paver components –Tractor –Screed –Grade and slope control  Operational principles of screed.
Delivery Module 5. Delivery  End dump operations  Belly dump operations  Determining number of required trucks.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
IDENTIFYING MAT FAULTS
Agenda Best Paving Practices
WAPA / WSDOT Joint Training
Angles and Protractors
CONSTRUCTING STRAIGHT LONGITUDINAL JOINTS
Uniform Paving Platform A Contractor’s Perspective
CONCRETE PAVEMENTS.
Surface Preparation before laying Hot Mix
Dedicated to Quality Partners In Quality
Transitioning to IRI for Pavement Smoothness
Longitudinal Joint Construction – Why Straightness Matters
Considerations FOR more durable hma pavements
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
UTILIZING GRINDINGS ON RURAL ROADS:
How Compaction Affects Smoothness
Presentation transcript:

Construction of Longitudinal Joints 2014 VDOT/VAA Regional Asphalt Seminars Ken Arthur Quality Control Manager Templeton Paving

Relationship between Density and Pavement Life Low Density Permeability Segregation Poor adhesion at interface

“You must plan for the longitudinal joint, it cannot be an afterthought”.. Final Draft Report Best Practices for Constructing and Specifying HMA Longitudinal Joints Buncher and Rosenberger, Asphalt Institute 2012

Longitudinal Joint Density Layout of the Site Tack Application Paver Practices Proper Depth Proper Overlap Handwork Compaction Quality Control

Layout – 1 st Pull Mark a consistent, straight line for paver operator Offset 6” from existing joint Existing joint New joint offset 6”

Tacking the 1 st Pull 2’ section along center line is tacked first

Good Paver Practice Paver hopper remains open between dumps Material should not be pushed more than 24” to end gate

Paver Practice – 1 st Pull Vibratory screed ON End gates set for neat butt joint Augers within 24” of end gate Consistent paver speed Non-contact ski for grade control

Definitions

Compaction – 1 st Pull Roll unconfined edges with a 6” overlap We generally roll from centerline to outside edge, sealing off longitudinal joint first

Compaction - 1 st Pull Beginning just inside of the unsupported edge can cause cracking late in the roller pattern from lateral mix movement Edge of drum directly on edge of unsupported edge will typically cause lateral movement of mat

Longitudinal Joint Density 2 nd Pull Proper tack application Paving practices Correct depth and overlap of material Compaction

Tacking the 2 nd Pull Ensure joint is clean Tack the vertical face of the joint with 0.20 gal/S.Y. prior to paving Slight puddling at the base of vertical face is acceptable

Tacking the Vertical Face

Paver Practice - 2 nd Pull Consistent paver speed Joint matcher for grade control End gates down and augers within 24”

2 nd Pull – Proper Depth D2 = D1 + 25% D2 = Depth of 2 nd Pull D1 = Compacted Depth of 1 st Pull DON’T STARVE THE JOINT!

2 nd Pull – Proper Overlap We overlap the joint ½” – 1” Do not trust the “toe test” Handwork?

2 nd Pull – No Handwork Necessary “ Bumping the joint..….BAD!”

2 nd Pull - Compaction A visible white line is assurance that you are not “starving” the longitudinal joint.

2 nd Pull - Compaction

2 nd Pass will leave 6” – 36” depending on road width 3 rd Pass pinches joint with sufficient material to achieve compaction

Longitudinal Joint Density QC Utilize the gauge beyond minimum requirements Prioritize density Have a plan for corrective action

Common Longitudinal Joint Density Issues Starving the joint, or “bridging” Excessive grade changes Paver speed Rollers unable to keep up with paving operation Electronics affected by inconsistent speed Communication between operators and technicians

Longitudinal Joint Density Summary Layout for straight lines and offset joints Quality paving practice with the machine Tack the clean joint location and vertical face Proper depth and overlap Compaction with joint density in mind Diligent quality control

Questions?