EASA HighIWC EASA-HighIWC Final Meeting Conclusion EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM – LaMP – SAFIRE) December 2012.

Slides:



Advertisements
Similar presentations
DIRECTION TECHNIQUE CERTIFICATION Ce document est la propriété intellectuelle de Dasssault Aviation.Il ne peut être utilisé, reproduit, modifié ou communiqué
Advertisements

Group on Earth bservations Discussion Paper on a Framework Dr. Ghassem Asrar August 1, 2003.
Slide 1 07 November 2006Future of DOA DOA concept Roger Simon Design Organisation Manager.
NPA WG : Single and multiple releases
01 DEC 2006Koeln M-005: Limited Pilot owner maintenance EASA workshop 01 December 2006 JP Arnaud.
05 July 2007Cologne NPA WG66.009: Type and Group Ratings Juan Anton.
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
Permit to Fly Privileges for approved organisations (DOA or POA)
Program Management Office (PMO) Design
EASA Executive Interior Requirements Working Group GAMA CMS October 18, 2011.
Standards for Seamless ATS communications transition between different datalink technologies Presented by CONDIS Jerome Airbus May 2010.
Helicopter Hoist Operations JAR-OPS 3
1 Module 9: Submit. Objectives 2 Welcome to the Cayuse424 Submit Training Module. In this module you will learn how to use Cayuse424 to:  Discern the.
Educating Mathematically Gifted Students: Recommendations from the National Mathematics Advisory Panel Dr. Camilla Benbow Vanderbilt University Presentation.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
OHIO AVIATION ASSOCIATION April 22, WELCOME AND INTRODUCTIONS Dave Dennis – Aviation Planner, ODOT Office of Aviation; Project Manager for Focus.
European Aviation Safety Agency IASFPWG May London Water/Ice in Fuel - Research Rémi DELETAIN Certification Directorate Powerplant Installation.
The Teamwork Handbook Requirements Should be able to be used across a variety of settings or a specific one that you define. Identify your client/audience/end-user.
Federal Aviation Administration Presented to: In-flight Icing Users TIM By: Tom Bond Date: February 25, 2015 High Ice Water Content Research International.
European Aviation Safety Agency Airworthiness certificates - general Airworthiness Certificates – General introduction Peter Corbeel Rulemaking Directorate.
Annual Interagency Weather Research Review and Coordination Meeting 30 November – 2 December 2010 Boulder, CO Julie Haggerty, Jennifer Black, Gary Cunning,
Concept Analysis Document Executive Summary Template, (To view template instructions – Save this template to project files, reopen and then select View,
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
EASA HighIWC HIWC - HAIC Coordination Meeting Falcon 20 instrumentation for HAIC / HIWC AIRBUS, CNRS, BOM March 2012 EASA.2011.OP.28 Payload & status.
ATAC International Marketing Campaign India 2010 Phase 3 of the project completed with17 schools 12 travelling to India for meetings Foreign Affairs supported.
EASA HighIWC EASA-HighIWC Final Meeting Contingency Plan & Way Forward EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM – LaMP – SAFIRE)
Astrium Suborbital Space Plane project RAeS – AAAF Space Tourism Symposium Toulouse, 12 March 2008 Hugues Laporte-Weywada Senior VP, Deputy Chief Technical.
Review of Draft AC 021 – Maintenance Contracting Draft AC 022 – Task and Shift Handovers Nie Junjian Airworthiness Inspector COSCAP-NA.
AIRBUS SUPPORT IN SOUTH ASIA Contributing to the Safety of Aviation Community April, 2011To 8 th 5 th Presented by Captain Michel MENESTROT Flight Ops.
PERFORMANCE APPRAISAL 2014 N+1. INTRODUCTION Please see our 2011 video for more details about the tool and process at
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
2008 © European Aviation Safety Agency European Aviation Safety Agency Preparing for new responsibilities Patrick Goudou Executive Director 2008 US/Europe.
“ Global Safety Management: Revolution or Evolution?” Operations and Licensing Part 2.
Julie Haggerty National Center for Atmospheric Research Friends and Partners of Aviation Weather October July 2014.
EASA HighIWC EASA-HighIWC Final Meeting Project Overview: Context, Objectives, Deliverables EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM.
Jean-Pierre DANIEL, Airbus at AIAA CANEUS 2004, Monterey CA, USA Structural Health Monitoring for Airliners from research to user requirements, a European.
Implementing School Plans in ePlan
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
CMPGN3007 & CMPGN3008 BSc Project Dr T.A.Etchells BSc Project Tutor
Atmospheric turbulence identification to aid aviation safety USING MODIS.
Farnborough Airspace Change Proposal Briefing to FACC 26 th November 2014 TAG Farnborough Airport.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Web: Presentation for BAJC Annual Project Review Hobart Function and Conference Centre, Hobart February 22.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Federal Aviation Administration Presented at:Friends/Partners in Aviation Weather By:Tom Bond, FAA – Aircraft Icing Technical Advisor Date:November 19,
A comparison of cloud microphysics in deep tropical convection forming over the continent and over the ocean Emmanuel Fontaine 1, Elise Drigeard 1, Wolfram.
Chapter 17 Writing the Research Report. Public Disclosure of Results Culmination of the research process Options for disclosure –Journal article –Thesis.
8 June 2006Portland, Oregon, USAE. Sivel EASA Working Group on regulation of non-complex motor aircraft engaged in non-commercial operations E Sivel (EASA)
European Commission DG Environment Marine Environment and Water Industry Unit Marine Strategy Framework Directive: Progress with Art. 12 assessment WG.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
EASA HighIWC EASA-HighIWC Final Meeting WP1/Task1.2: Analysis of the microphysical properties of the HighIWC regions using existing airborne in-situ observations.
Milestone presentation Balloon flight regulations.
TRAINING AND CAREER. CONTENT DOCUMENTS, DIRECTIVES AND REGULATOR SELECTION PROCESS FOR FOR APPLICANT LICENCE, RATINGS, ENDORSEMENTS TRAINING CAREER.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
Aviation Ground Handling Trailblazer Assessment Activity consultation Aviation ground operative Aviation ground specialist Aviation operations manager.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Submit Module Objectives 2  In this module you will learn how to:  Assess readiness and determine who can submit proposals  Submit a proposal.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
International Accident Investigation
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision LIABILITY AND INSURANCE ISSUES Nathalie.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
Period 1 2/5/16. LAB AIDS Name Period Date X Page Page # 1 24: Where Shall we Build? 2/5/16 Table of Contents.
Administration of a FIDIC Contract - Project Control
Campus Master Plan.
©2013 Baby-Friendly USA, Inc.
Request for Proposal (RFP)
Workshop for Licensing and Operations
Final Year PROJECT REPORT FORMAT
European Aviation Safety Agency
Presentation transcript:

EASA HighIWC EASA-HighIWC Final Meeting Conclusion EASA HighIWC (EASA.2011.OP.28) Presented by Airbus - CNRS (LATMOS/BOM – LaMP – SAFIRE) December 2012 EASA.2011.OP.28

This document and the information contained are EASA HighIWCContractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization EASA HighIWC EASA-HighIWC Final Meeting Conclusion - Milestones & Deliverables December 2012EASA.2011.OP.28Page 2 MilestonesDue DateStatus M3.1 : Kick-off meeting M1 OK M1.1: Flight test data measurements of Airbus A340 F/T campaigns at Darwin and Cayenne in M1 OK M1.2: Literature survey of existing reports and publications dealing with the variety of fundamental scientific issues related to the microphysical properties and structure of deep convective cloud systems over land and over the warm tropical ocean M3 OK M3.2: Progress review meeting 1 M3 OK M1.3: Assessment of the gathered/available data against the environment proposed in the NPA (Appendix P) defining mixed phase and glaciated icing conditions & Gap analysis M6 OK M3.3: Progress review meeting 2 M6 OK M2.1: Falcon 20 Flight Tests Development Plan. M7 OK M3.4: Progress review meeting 3 M7 OK M2.2: Ready to fly aircraft & Demonstration flights M11 OK (HYMEX)

This document and the information contained are EASA HighIWCContractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization EASA HighIWC EASA-HighIWC Final Meeting Conclusion - Milestones & Deliverables December 2012EASA.2011.OP.28Page 3 DeliverableDue Date Status D3.1: First interim report: Literature survey of existing reports and publications dealing with the variety of fundamental scientific issues related to the microphysical properties and structure of deep convective cloud systems over land and over the warm tropical ocean M3 OK D3.2: Second interim report: Assessment of the gathered/available data against the environment proposed in the NPA (Appendix P) defining mixed phase and glaciated icing conditions M6 OK D3.3: Final report: key conclusions, recommendations and open issues regarding the validation of the environment proposed in the NPA (Appendix P) defining mixed phase and glaciated icing conditions and the necessary steps to achieve a more comprehensive determination of the cloud characteristics at high altitude with the appropriate precision. M11 ON- GOING D3.4: Final presentation & Conclusion of the projectM11 TODAY

This document and the information contained are EASA HighIWCContractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization EASA HighIWC December 2012 Ice Water Content of clouds at High altitude (EASA HighIWC, EASA.2011.OP.28) This document and the information contained are EASA HighIWC Contractors’ property and shall not be copied or disclosed to any third party without EASA HighIWC Contractors’ prior written authorization Project funded by the European Aviation Safety Agency (EASA) EASA.2011.OP.28Page 4