© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (1) Ontology Ontology  Enrich the lexicons for the 1 st domain based on partners remarks.

Slides:



Advertisements
Similar presentations
1° Transnational Workshop – Rome 3rd- 4th February PROJECT WEBSITE AND PROJECT GRAPHIC DESIGN 1.
Advertisements

CHART or PICTURE INTEGRATING SEMANTIC WEB TO IMPROVE ONLINE Marta Gatius Meritxell González TALP Research Center (UPC) They are friendly and easy to use.
COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 WP 4 – DATA HARMONISATION London, 5 – 7 September.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Rhode Island DEM’s Workplan Reporting Project EPA Innovations Conference Denver, Colorado January 2006 Thomas D. Getz -Presenter Kien Harris – IT Project.
FNERC (towards final version v.3) Edinburgh, March 2002.
Multilingual eLearning in LANGuage Engineering. Project Overview  Project span: Oct 2004 – Oct 2007  Kick-off meeting Oct  Project goals:
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
TIPEIL LLP-LDV/TOI/07/IT/019 2nd Transnational Workshop Biarritz, March 2009 PROJECT WORKPLAN FUTURE ACTIVITIES.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Institute of Informatics and Telecommunications – NCSR “Demokritos” Bootstrapping ontology evolution with multimedia information extraction C.D. Spyropoulos,
Final Review 31 October WP2: Named Entity Recognition and Classification Claire Grover University of Edinburgh.
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
JCN, Justice Cooperation Network European Treatment and Transition Management of High Risk Offenders Tallin, 13 March 2013 Second Steering Committee Meeting.
PANACEA - Y2 After the 2 nd Annual Review, 28 th February 2012, Barcelona 1.
Ufficio Italiano Brevetti e Marchi Italian Patent and Trademark Office WP2. Developing the IPR Toolbox Progress presentation.
CROSSMARC Web Pages Collection: Crawling and Spidering Components Vangelis Karkaletsis Institute of Informatics & Telecommunications NCSR “Demokritos”
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
IST WP8: Project management Žiga Turk 2nd SciX Review Luxembourg, 17 th Nov IST
Edinburg March 2001CROSSMARC Kick-off meetingICDC ICDC background and know-how and expectations from CROSSMARC CROSSMARC Project IST Kick-off.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
EVA Workshop, 26 March 2003, Florence, Italy1 COINE Cultural Objects In Networked Environments Anthi Baliou University of Macedonia,Library Thessaloniki,
05/03/03-06/03/03 7 th Meeting Edinburgh Naïve Bayes Fact Extractor (NBFE) v.1.
Food and Agriculture Organization of the UN Library and Documentation Systems Division Margherita Sini July 2005 Managing domain ontologies within the.
Project Overview Vangelis Karkaletsis NCSR “Demokritos” Frascati, July 17, 2002 (IST )
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
Clarity Cross-Lingual Document Retrieval, Categorisation and Navigation Based on Distributed Services
Working with Ontologies Introduction to DOGMA and related research.
>lingway█ Solutions in language processing Lingway & Crossmarc exploitation plan José Coch.
© NCSR, Frascati, July 18-19, 2002 WP1: Plan for the remainder (1) Ontology Ontology  Use of PROTÉGÉ to generate ontology and lexicons for the 1 st domain.
State of Palestine Palestinian Central Bureau of Statistics (PCBS) UNSD DFID Project on National Development Indicators October, 2014.
NCSR “Demokritos” Institute of Informatics & Telecommunications CROSSMARC CROSS-lingual Multi Agent Retail Comparison Costas Spyropoulos & Vangelis Karkaletsis.
ICDCRome November 2001CROSSMARC Third meeting French NERC (first version and results) CROSSMARC Project IST Third meeting Rome November 2001.
HySafe Coordination Committee Meeting no. 8, December 13, 2005, INASMET San Sebastian Status of WP5- The Hydrogen Incident and Accident Database Update.
WonderWeb. Ontology Infrastructure for the Semantic Web. IST Project Review Meeting, 11 th March, WP2: Tools Raphael Volz Universität.
EUROSTAT REPORT ON DISSEMINATION ACTIVITIES 1st Quarter 2004 Dissemination Working Group April 2004 Christine Kormann.
WP1: Application Ontology Management Maria Teresa Pazienza Dept. Of Computer Science University of Rome “Tor Vergata”
Institute of Informatics & Telecommunications NCSR “Demokritos” Spidering Tool, Corpus collection Vangelis Karkaletsis, Kostas Stamatakis, Dimitra Farmakiotou.
IMCWMA Strategic Plan Background Committee/Workgroup Structure Roles Next Steps Today By January 31 st, 2007.
Provenance Work Plans and Deliverables October 2005  Data Provenance information in SRB and HID Test upload to SRB (March) Give DB working group formal.
WP1: Plan for the remainder (1) Ontology –Finalise ontology and lexicons for the 2 nd domain (RTV) Changes agreed in Heraklion –Improvement to existing.
Critical Step Web Site Presentation. Ing. Carlo Sanghez Consorzio Interuniversitario Nazionale per l'Informatica Napoli,
© NCSR, Frascati, July 18-19, 2002 CROSSMARC big picture Domain-specific Web sites Domain-specific Spidering Domain Ontology XHTML pages WEB Focused Crawling.
NCSR “Demokritos” Institute of Informatics & Telecommunications CROSSMARC CROSS-lingual Multi Agent Retail Comparison WP3 Multilingual and Multimedia Fact.
5 th -6 th December th Meeting Paris WP2: NERC.
Brussels, January 16th, Overview and status of the project.
Architecture Review 10/11/2004
AMICI WP1 – Management, coordination and dissemination
WP8: Demonstrators (UniCam – Regione Marche)
 Corpus Formation [CFT]  Web Pages Annotation [Web Annotator]  Web sites detection [NEACrawler]  Web pages collection [NEAC]  IE Remote.
Usage scenarios, User Interface & tools
Institute of Informatics & Telecommunications NCSR “Demokritos”
Planning of the first tasks
Institute of Informatics & Telecommunications
First Partners’ Meeting
MAES Working Group Meeting Brussels
Standards For Collection Management ALCTS Webinar – October 7, 2014
State of progress Eurostat web site 3 Dissemination WG 29 April 2004
The basics ESSnet on SDMX prepared in 2008/2009
Why IIIF? Shane Huddleston Jeff Mixter Dave Collins Product Manager
ESS.VIP Validation Item 5.1
PubMed Database Interface (Basic Course: Module 4 Part B)
Review plan of the nature reporting – update 6
Aurora Hoxha & Drini Imami
Presentation transcript:

© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (1) Ontology Ontology  Enrich the lexicons for the 1 st domain based on partners remarks (RTV) (mid December)  Finalise section in D1.3(a) (2 nd domain, portability, maintenance, constraint checking, evaluation, enhancement of ontology role) (RTV) (mid December)  Examine the use of PROTÉGÉ API instead of the XML files (NCSR, RTV) (mid January)  Ontology and lexicons for the 2 nd domain (RTV coordinates, partners send to RTV) (mid January)  Final report on ontologies for D1.3(b) (RTV) (mid February) Corpus formation for the needs of page filtering Corpus formation for the needs of page filtering  New version of corpus formation tool and guidelines for the 2 nd domain (use of new ontology and lexicons) (NCSR sends to partners) (mid January)  Corpus formation for the 2 nd domain (partners send to NCSR) (end of January)  Final report on corpus formation task for 2 nd domain for D1.3(b) (NCSR) (early February) Web spidering (NCSR) Web spidering (NCSR)  Finalise site navigator (early January)  Finalise page filtering experiments for the 2 nd domain (mid February)  Finalise link scoring experiments for the 2 nd domain (mid February)  Final report on web spidering for D1.3(b) (mid February)

© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (2) Focused Crawling Tool Focused Crawling Tool  Language identification for 1 st domain: examine Lingway’s tool, evaluation, related work on LI for Web sites (EDIN, Lingway, partners annotate the 150 sites) (mid December)  Final evaluation results for 1 st domain (EDIN, NCSR) (mid December)  Final report of Focused Crawling for 1 st domain for D1.3(a) (EDIN) (mid December)  Focused crawling for 2 nd domain, Evaluation Results (EDIN) (end January)  Final report of Focused Crawling for 2 nd domain for D1.3(b) (EDIN) (mid February) Other tools for web pages collection Other tools for web pages collection  Meta-TIDY for 2 nd domain (NCSR, Lingway) (end January)  Cross-merge for 2 nd domain (NCSR) (end January)  Documentation (NCSR) (mid February) Integration of all the tools involved in the collection process (NCSR) Integration of all the tools involved in the collection process (NCSR)  Integration for the 1 st domain, Report for D1.3(a) (mid December)  Integration for the 2 nd domain, Report for D1.3(b) (mid February)

© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (3) Corpus collection for the needs of NERC and FE Corpus collection for the needs of NERC and FE  Collection of web pages for the 2 nd domain according to the methodology agreed in Paris (NCSR sends to partners) (end January)  Report on the corpus collection task for 2 nd domain for D1.3(b) (NCSR) (mid February) Web Annotator Web Annotator  Final version for 2 nd domain (NCSR sends to partners) (end January)  Report for D1.3(b) (NCSR) (mid February) Deliverable D1.3 (NCSR) Deliverable D1.3 (NCSR)  D1.3(a) (mid December)  D1.3(b) (end February)

© NCSR, Paris, December 5-6, 2002 WP2: Plan for the remainder (1) NERC DTD NERC DTD  Finalise issues on 2 nd domain DTD (JOB_TITLE, EDU_TITLE) (Lingway) (mid December)  Report on NERC DTD for both domains for D2.3 (take into account HR-XML) (EDIN) (mid December) Corpus annotation for the needs of NERC Corpus annotation for the needs of NERC  Corpus annotation for the 2 nd domain according to the annotation methodology agreed (Velti-EL, RTV-I, Lingway-F, EDIN-EN, NCSR checks the annotations) (starts end January, ends mid March)  Final NERC annotation guidelines for the 2 nd domain (NCSR) (end January)  Report on corpus annotation task for 2 nd domain (NCSR) (end March) NERC v.2 NERC v.2  FNERC v.2 (Lingway) (mid December)  Finalise NERC v.2 evaluation as agreed in Paris (per page type, without demarcator) (mid December)  Finalise report for NERC v.2 for D2.3 (no evaluation for name matching, normalisation, these will be presented in D3.2) (EDIN) (mid December)

© NCSR, Paris, December 5-6, 2002 WP2: Plan for the remainder (2) NERC v.3 (incorporation of mechanisms for rapid adaptation to new domains, use of demarcator) NERC v.3 (incorporation of mechanisms for rapid adaptation to new domains, use of demarcator)  First evaluation results (end March)  Final evaluation results (mid April)  Final reports for D2.4 (mid April) NERC-based demarcator (NCSR) NERC-based demarcator (NCSR)  Finalise evaluation for the 1 st domain (English, Italian) (mid December)  Final report for D2.3 (mid December)  New version for 1 st and 2 nd domain (exploit machine learning techniques) (early March)  Final report for D2.4 (end March) Deliverables (EDIN) Deliverables (EDIN)  D2.3 (mid December)  D2.4 (end April)

© NCSR, Paris, December 5-6, 2002 WP3: Plan for the remainder (1) FE schema FE schema  Report on FE schema for both domains according to what was agreed in Paris (RTV) (mid December) Corpus annotation for the needs of FE Corpus annotation for the needs of FE  EDIN sends to NCSR the final Fact annotated corpus for the 1 st domain (mid December)  Final Fact annotation guidelines for the 1 st domain (NCSR) (mid December)  Report on Fact annotation task for the 1 st domain (NCSR) (mid December)  Final Fact annotation guidelines for the 2 nd domain (NCSR) (end March)  Corpus annotation for the 2 nd domain according to the annotation methodology agreed (Velti-EL, RTV-I, Lingway-F, EDIN-EN, NCSR checks the annotations) (starts early April, ends early May)  Report on Fact annotation task for the 2 nd domain (NCSR) (mid May)

© NCSR, Paris, December 5-6, 2002 WP3: Plan for the remainder (2) Wrapper Induction Wrapper Induction  STALKER-based wrapper induction (NCSR)  Evaluation results for English, Italian for the 1 st domain (mid December)  Final report for D3.1 (mid December)  Provide the trained monolingual modules to the partners (early January)  New version exploiting other types of information (linguistic, images) (early February)  New version evaluation results for 4 languages for the 1 st domain (mid February)  Final report for D3.2 (mid February)  Boosted (?) Wrapper Induction (EDIN)  Final report for D3.1 (mid December)  New version exploiting other types of information (linguistic, images) (early Fenruary)  New version evaluation results for 4 languages for the 1 st domain (mid February)  Final report for D3.2 (mid February)  Provide the trained monolingual modules to the partners (end February)  WHISK (RTV)  Final report for D3.1 (mid December)  New version exploiting other types of information (linguistic, images) (early Fenruary)  New version evaluation results for 4 languages for the 1 st domain (mid February)  Final report for D3.2 (mid February)  Provide the trained monolingual modules to the partners (end February)

© NCSR, Paris, December 5-6, 2002 WP3: Plan for the remainder (3) Handling of images Handling of images  Final report on the techniques that can be used for D3.1 (NCSR, Lingway) (mid December)  v.1 for 1 st domain (NCSR, Lingway) (end January)  Evaluation of v.1 for the 1 st domain (NCSR, Lingway) (mid February)  Report for D3.2 (NCSR, Lingway) (mid February) Deliverables (NCSR) Deliverables (NCSR)  D3.1 (mid December)  D3.2 (includes also name matching, normalisation) (end February)

© NCSR, Paris, December 5-6, 2002 WP4: Plan for the remainder (1) System Architecture System Architecture  Final Report on the refined architecture (Velti) (mid December) End-User Interface End-User Interface  Help texts, localisation, End-user interface for the 1 st prototype (Velti) (mid December)  Enrichment of the products database for the 1 st domain (Velti) (mid January)  Final report for 1 st prototype (Velti) (mid December)  UI for the 2 nd prototype (exploit user modeling techniques, personalisation agent) (Velti) (end January)

© NCSR, Paris, December 5-6, 2002 WP4: Plan for the remainder (2) System Integration System Integration  Report for the 1 st integrated prototype (Velti) (mid December)  2 nd prototype (end January)  Report for the 2 nd integrated prototype (Velti) (mid February) Evaluation Evaluation  Evaluation methodology for D4.2 (Velti, Lingway) (mid December)  Evaluation results for the integrated IE systems of the 1 st prototype (based on the STALKER monolingual modules) (mid January)  3 Evaluation Workshops for the 2 nd prototype (students at NCSR, RTV, EDIN) (mid February) (Velti coordinates)  Final report for the evaluation of the 2 nd prototype for D4.3 (Velti) (end February) Deliverables (Velti) Deliverables (Velti)  D4.2 (mid December)  D4.3 (end February)

© NCSR, Paris, December 5-6, 2002 WP5: Plan for the remainder (1) Consortium agreement sign (mid December) Consortium agreement sign (mid December) Management reports Management reports  7 th Quarterly report (NCSR sends draft by mid December, final to EC early January)  Annual report (NCSR sends draft by mid December, final to EC early January) Formation of a user group (????) Formation of a user group (????)

© NCSR, Paris, December 5-6, 2002 WP5: Plan for the remainder (2) Publication in Conferences, Journals … Publication in Conferences, Journals …  WWW, IJCAI, ACL, ??????? CROSSMARC presentation in a large event CROSSMARC presentation in a large event  IST-2003 ??? Updated Deliverable 5.2 “Exploitation and Use Plan” (mid December) Updated Deliverable 5.2 “Exploitation and Use Plan” (mid December) Date and place of next meeting (Edinburgh, 6-7 March 2003) Date and place of next meeting (Edinburgh, 6-7 March 2003)