A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.

Slides:



Advertisements
Similar presentations
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Advertisements

Testbeam 2010 with CAPTAN System Jianchun Wang Syracuse University.
Status and outlook of the Medipix3 TSV project
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
List of Authors: Maria Rita Coluccia, J. A. Appel, G. Chiodini, D. C. Christian, S. W. Kwan, G. Sellberg with Fermi National Accelerator Laboratory L.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Gerd J. Kunde - LANL1 The FVTX Technology  Outline Overall Picture Silicon Detector –Geometry, Layout, Process Readout Chip –FNAL Chips, New Chip PHX.
Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10,
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
F February 5, 2001 Pixel Detector Size and Shape David Christian Fermilab.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
03/12/07 Jon S Kapustinsky LANL Jon S Kapustinsky, LANL Forward Vertex Detector Collaboration Meeting UNM, March 12, 2007 Outline: FVTX Overall Description.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
DESIGN CONSIDERATIONS FOR CLICPIX2 AND STATUS REPORT ON THE TSV PROJECT Pierpaolo Valerio 1.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
The BTeV Pixel Detector David Christian Fermilab June 17, 2010.
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
The NA61 Vertex Detector Considerations on site M. Deveaux, Goethe University Frankfurt.
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Integration of the MVD Demonstrator S. Amar-Youcef, A. Büdenbender, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S.
FBK 3D CMS pixel sensors preliminary lab measurements E. Alagoz 1, A. Krzywda 1, D. Bortoletto 1, I. Shipsey 1, G. Bolla 1, and G. F. Dalla Betta 2, M.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
An Overview of the FPIX Detector Upgrade – CMS Experiment
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Preliminary results from 3D CMS Pixel Detectors
Hybrid Pixel R&D and Interconnect Technologies
Presentation transcript:

A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007

Outline Review of hybrid pixel detectors, status of “BTeV” R&D. Conceptual design of pixel telescope. MTest assets. First crack at task list; items for further discussion.

What is a Hybrid Pixel Detector? A Pixel 50 µm 200 µm 250 µm 400 µm A Hybrid - a 2-D array of Pixels “8-chip” Hybrid Sensor

The Sensor Holes Electrons PPPPPPPPPPPPPPPP N- type bulk N+ P-spray isolation SiO 2 passivation Contact metallization V +

Preamp2 nd stage +disc ADC Kill/ inject ADC encoder Digital interface The readout IC

FPIX2 developed for BTeV Debugging Outputs 128x22 Pixel array End-of-Column Logic Data Output Interface Command Interface Registers and DAC’s LVDS Drivers and I/O pads Pixel array + End-of-Column Logic +  = “Core” Internal bond pads for Chip ID Chiphit available for use in trigger

Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An “extended closeout” R&D program was approved –1 more chip submission. –R&D refocused on ILC. –Two system tests approved: Telescope for the forward direction of PHENIX (at RHIC) Test beam telescope

Sensor & FPIX2.1 wafers Sensor wafers produced for PHENIX by CiS (LANL has agreed to donate the x4 sensors for use in MTest) FPIX2.1 fabricated on wafer with “TripT” for D0; fatal flaws fixed; 11 wafers purchased by LANL for PHENIX, 11 by FNAL to support R&D - 2 required for MTest telescope.

Sensors & ROCs probed – yield is high Typical FPIX2.1 wafer map Typical sensor IV curve

Hybridization – solder bump bonding done by VTT (Finland) X-ray made at FCC VTT bump-deposition process flow

15 Pre-production PHENIX (x8) hybrids delivered 12 April 2007 First 10 x4 hybrids being assembled at VTT this week.

Half-plane = three 1x4 modules read out by 1 FPGA (collaboration with Columbia U.) Station = two half-planes offset by active area of sensor 2 stations upstream of DUT & 2-4 downstream (precision x & precision y) New test beam telescope

4x HDI

PCB Interposer Sensor Readout chips Glue HDI TPG Concept for pixel plane

MT6-A1

MT6-A1 Assets Climate controlled hut. Aluminum table on rails allows entire setup to be removed from beam. Dark box with feed throughs for signals, power, & cooling fluid. Remotely controlled motors determine (x,y) position of both ends of box. Local chiller provides closed loop cooling system CAEN power system can provide LV & sensor bias (“HV”). Plenty of quiet power is available.

Climate Controlled Hut Table on rails

Feed Through Boards Moveable Pixel Box Remotely Controlled x-y Positioners Chiller

Old picture of pixel box interior

MT6-A1 task list Status of CAEN & motor control system? Modify box mechanicals –Support 6x4 stations –Stations positioned to minimize MS error at DUT –Flexible DUT station (CMS upgrade didn’t really work out)

Pixel telescope task list x4 HDI x4 plane/station design (mechanical and electrical) DAQ Integration of telescope data with: – DUT in pixel box – data from other MTest detectors (if necessary)