Projectizing an Operating

Slides:



Advertisements
Similar presentations
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
Advertisements

IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Roadmap for Sourcing Decision Review Board (DRB)
Eaton Business System Overview
Department of Environmental Quality Environmental Management System Overview.
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Liquid Waste Organization
Office of Nuclear Energy 1May 20, 2013 Property Management Workshop Office of Nuclear Energy Program Perspective Delivering Nuclear Solutions for America's.
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Defense Waste Processing Facility 257 Actual Canisters Produced in FY05 37% Waste Loading (averaged for FY05) 1,995 Total Canisters Produced (as of the10/31/05.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Stennis Space Center March 2013 Amy Rice. The Food.
1 Borouge reference line 2006 © 2006 Borouge HSE MANAGEMENT OF CONTRACTORS By: Venkatesh Murthy Abu Dhabi Polymers Company LLC (Borouge), Abu Dhabi.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
“ From Waste to Resource Management: A New Way of Thinking about Waste Services and Contracts” Materials Management Resource Recovery Process (Private.
Construction Category Management Planning Version 1.1 (May 2015)
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
2010 MBNQA WINNER: K & N MANAGEMENT – SMALL BUSINESS CATEGORY PRESENTED BY: MOORE, YAGER, TODD, PEAVY.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
Work Planning & Control for R&D Activities – Lessons Learned 2007 ISM Workshop – Brookhaven National Lab John Miller Manager, SRNL Safety Programs Lori.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Tom MAZOUR IAEA, Division of Nuclear Power
More Construction for the Money “Back to the Future” Jim Porter 2004 Recipient Carroll H. Dunn Award of Excellence.
1 D D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 Achieving and Maintaining High Reliability through Human Performance.
Behavior-Based Safety The Next Generation Date Frank Cannon – Operator, Co-Chair – Site BBS Users Forum Hazel Darby – Operator, BBS Observer Roger Staten,
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
First Generation Magnox Storage Pond (FGMSP) Programme Partner Requirements February 2014 Steve Topping.
1. 2 Today’s Presentation The City of Baltimore Water and Wastewater Systems Challenges facing the City The Strategic Planning Initiative So Where Are.
11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
1 Construction of Salt Waste Processing Facility (SWPF) Charting the Course for Major EM Successes in September 29, 2015 Frank.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Milestones or Millstones Alex R. Burkart, Deputy Director Office of Nuclear Energy, Safety and Security United States Department of State.
Nuclear Security Culture William Tobey Workshop on Strengthening the Culture of Nuclear Safety and Security, Sao Paulo, Brazil August 25-26, 2014.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
R 0 G125 B 177 R 78 G 47 B 145 R 185 G 50 B 147 R 245 G132 B 107 R 255 G234 B 83 R 123 G193 B 67 R149 G169 B 202 Introduction to Performance Management.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
Department of Energy Best Practices Workshop H-Completion Criticality Safety Improvement Phil Breidenbach, Manager Environment, Safety and Health and Mike.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
INTER TERMINALS LTD Liquid Waste Solutions for the Shale Gas Industry 18 March 2015.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
South Carolina Nuclear Advisory Council SRS Update and FY 2017 Budget Service ● Safety ● Security ● Stewardship ● SRNL ● Sustainability April 14, 2016.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
John Christian President, Logistics, Processing and Disposal
Purchase Order Records and Information Document Management
West Valley Demonstration Project Status Update
Northeast High-Level Radioactive Waste Transportation Task Force
Ms. Kristyn E. Jones Director, Financial Information Management
Presentation transcript:

Projectizing an Operating Nuclear Facility Kim Hauer Director of Strategic Programs Savannah River Remediation LLC URS Washington Division November 11, 2009 SRR-LWP-2009-00015

Savannah River Site Savannah River Site, located in South Carolina, was constructed in the early 1950s Built to provide strategic materials for U.S. Department of Defense 310 square miles of federally protected land Produced nuclear material for national defense, research, medical and space programs Dispositioning legacy waste generated from nuclear operations Savannah River Remediation, a subsidiary of the URS Corporation, has managed liquid waste operations at the Savannah River Site since July 1, 2009

Savannah River Remediation SRR program FY09 operating budget is $552 million Liquid Waste program completion cost is $20.4 billion Technical and Programmatic Risk Assessment contingency of $6.0 billion SRR program completion date of 2032 1,786 employees 5 major operating facilities More than 15 active projects Sole customer: U.S. Department of Energy Multiple stakeholders Talk through slide Radioactive waste stored in SRS tanks poses the single greatest environmental risk in the State of South Carolina

A Safe Project Culture Establish a “zero injury” expectation Implement safety programs Behavior-Based Safety (BBS) Voluntary Protection Program (VPP) Human Performance Improvement (HPI) Time Out Take 5 for Safety Monitor employee performance Reward safety excellence

Working Safely 2,500 times each year employees are exposed to electrical hazards 250,000 times each year employees are exposed to radiological hazards 200 million gallons of liquid radioactive waste is transferred annually by employees Two Legacy of Stars Awards Eight VPP “Star of Excellence” Awards One Superior Star Award Cases Per 200,000 Hours SRR begins 7/1/09

SRR Commitments 22 Waste Tanks Closed in 8 Years !!! Double Sludge preparation rate and Sludge Feed quantity Triple quantity of HLW removed HLW Sludge Waste Removal HLW Sludge feed preparation Double canisters produced per year DWPF Canister Production Salt Removal and Separation (ARP/MCU) Salt Separation (ARP/MCU) HLW Tank Closure HLW Tank Cleaning Double Salt preparation and Salt processing rates 22 Waste Tanks Closed in 8 Years !!! LLW (Salt Stone) HLW Evaporators

Program Challenges Pendulum-like budget swings Multiple regulators $30-50 million annual budget swings Multiple regulators Five regulators, all with differing expectations Environmental risk Single largest environmental risk in the southeastern United States Degrading equipment and infrastructure Over 50-year-old equipment and plant infrastructure Competitive market Ultra-competitive business market with an aging workforce Highly political environment Highly intense political environment subject to stakeholder and media scrutiny

Tank Closure Sequencing Plan DOE & Site Strategic Plans Project Execution Plan Sludge Batch Plan Life-Cycle Liquid Waste Disposition System Plan (LLWD) (End-of-Program) Key Assumptions DWPF Recycle Management Plan Long Range Effluent Treatment Project Plan Risk Management Plan (RMP) Salt Sequencing Plan Technology Development Documents joint objectives of DOE, SCDHEC, GNAC Continue to store waste safely Meet FFA commitments for Tank Closures Support SWPF startup at rated capacity Sustain Vitrification at DWPF Treat organics and return Tank 48 to service Minimize curies disposed at Saltstone Defines curie limits for waste to Saltstone from DDA, ARP/MCU, and SWPF Emergent Risks Project Risk Assessments Disposition Processing Plan (DPP) (5-7 years) Mid Range Emergent Opportunities Emergent Risks Facility P3 Schedules P6™ Weekly Evaporator Operating Plans LW Strategy Short Range Emergent Opportunities Facility Execution

Tank Closure Sequencing Plan DOE & Site Strategic Plans Project Execution Plan Sludge Batch Plan Life-Cycle Liquid Waste Disposition System Plan (LLWD) (End-of-Program) Key Assumptions DWPF Recycle Management Plan Long Range Documents jointly developed key inputs and assumptions for plan development such as: SWPF Startup date SWPF processing rate Federal Repository startup date and shipping rates Canister fissile loading limitations H-Canyon processing plan Frequency of melter replacement Schedule duration for Tank Closure documentation DWPF canister waste loading and production rate ARP/MCU processing rate Tank 48 return to general service date Effluent Treatment Project Plan Risk Management Plan (RMP) Salt Sequencing Plan Technology Development Emergent Risks Project Risk Assessments Disposition Processing Plan (DPP) (5-7 years) Mid Range Emergent Opportunities Emergent Risks Facility P3 Schedules P6™ Weekly Evaporator Operating Plans LW Strategy Short Range Emergent Opportunities Facility Execution

Tank Closure Sequencing Plan DOE & Site Strategic Plans Project Execution Plan Sludge Batch Plan Life-Cycle Liquid Waste Disposition System Plan (LLWD) (End-of-Program) Key Assumptions DWPF Recycle Management Plan Long Range Effluent Treatment Project Plan Risk Management Plan (RMP) Salt Sequencing Plan Technology Development Emergent Risks Project Risk Assessments Disposition Processing Plan (DPP) (5-7 years) Mid Range Emergent Opportunities Emergent Risks Facility P3 Schedules P6™ Weekly Evaporator Operating Plans LW Strategy Short Range Emergent Opportunities Facility Execution

Tank Closure Sequencing Plan DOE & Site Strategic Plans Project Execution Plan Sludge Batch Plan Life-Cycle Liquid Waste Disposition System Plan (LLWD) (End-of-Program) Key Assumptions DWPF Recycle Management Plan Long Range Effluent Treatment Project Plan Risk Management Plan (RMP) Salt Sequencing Plan Technology Development Emergent Risks Project Risk Assessments Disposition Processing Plan (DPP) (5-7 years) Mid Range Emergent Opportunities Emergent Risks Facility P3 Schedules P6™ Weekly Evaporator Operating Plans LW Strategy Short Range Emergent Opportunities Facility Execution

Waste Processing: Future High Volume Low Activity Stream Saltstone SWPF Tank Farms High-Capacity Salt Processing DWPF Federal Repository Processing Sludge Low Volume High Activity Tank Closure Legend: SWPF: Salt Waste Processing Facility; DWPF: Defense Waste Processing Facility

Interim Solution Interim Salt Disposition Project (ISDP): - Use existing facilities to demonstrate the salt flowsheet Enable vitrification and tank closure while SWPF is build and commissioned Reduce SWPF risk through application of ISDP operating experience Talk through slide Hand out sample cards of vitrified glass (samples from – S. Wilkerson) The first salt waste processing facility within the Department of Energy began operations at SRS in April 2008

Waste Processing: Now MCU ARP Tank Farms Saltstone DWPF Federal High Volume Low Activity Stream Interim Salt Processing Tank Farms Saltstone DWPF Federal Repository Processing Sludge Low Volume High Activity Tank Closure Legend: MCU: Modular Cesium Removal Unit; ARP: Actinide Removal Process; DWPF: Defense Waste Processing Facility

Saltstone Mods Complete Mission Timeline DOE Directs New Technology Site Excavation Site Selected Start D&R Equipment Fabrication / Testing Foundation Shielding Structure Setting Key Equipment Jan 2004 Aug 2004 Nov / Dec 2004 Jan 2005 2005 2006 Transfer Lines Tank 50 Mods Saltstone Mods Complete 96H Cell D&R

Mission Timeline Start Up Complete Radiological Ops Initiated Cold Runs Complete Management Self Assessment Ready For Hot Operations Initiate Hot Operations Feb /Mar 2007 Jul 2007 Sep 2007 Dec 2007 Jan / Mar 2008 Mar 2008 Apr 2008 Operational Readiness Reviews CRC / Simulator Complete

Interim Salt Disposition $150 million nuclear facility operations project Prodigious scope (three separate subprojects integrated into one operating project) Implemented first-of-a-kind in the world technology Strong relationship with regulators Stellar safety performance of 3 consecutive years and 1.1 million manhours with only one minor first aid case Project completed under budget and 12 months ahead of schedule (Cost Performance Index of 1.10) Construction Team of the Year Award earned for successful completion of MCU; several WSRC President’s Awards earned by employees for their contribution to integrated project’s design, construction and testing activities Safely operated the process though hundreds of hours of operations with real waste Providing valuable lessons learned information for SWPF Two of the subprojects, the Modular Caustic Side Solvent Extraction Unit [MCU] (above) and the Actinide Removal Process [ARP] (left), enable salt waste to be processed to support tank closure commitments

Lessons Learned Maintain safety priority and focus throughout all phases of a project. “Design to Build, Build to Test, Test to Assess, Assess to Operate” Include early involvement / integration of critical groups and SME’s in projects and at subcontractors facility: Safety, RCO, IH, Ops, Maintenance, Engineering, Procedures, Training, Testing…. Provides early identification of issues Constructability reviews Bi-weekly DA/Engineering and Construction Interface meetings Extensive use of 3D model and IPIC’s Technology (design phase through operational phase) significantly improves safety/ALARA and reduces risk Closely monitor flow-down of quality requirements to sub-tier suppliers.

Lessons Learned Use of a process simulator provides increased proficiency, testing and safety benefits Use of a “War Room” concept to manage start-up through hot operations activities enables prompt response and priority to safety Use of a “Management Control Plan” defines the management oversight expectations and controls to be used to ensure safe and effective start-up and operations emphasis on five strategic areas: Equipment operability, Operator knowledge and performance, Procedure viability, Management oversight, Final management review and authorization.

Take-Aways Achieve organizational alignment through project management discipline Set, communicate, and consistently reinforce common core behavioral expectations Identify and exploit opportunities to achieve early programme progress