1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.

Slides:



Advertisements
Similar presentations
Slide 1 CP Rectifier development – A tight squeeze. Richard Brodribb, M. Brodribb Pty Ltd
Advertisements

NetSure™ RDB Series.
André Augustinus 16 June 2003 DCS Workshop Safety.
Modular Capacity - Test - System CS
Delta Confidential Apr GAIA-series 5-11KVA Introduction.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Domestic Installation: Switch Circuits
© 2011 Ericson Manufacturing, Willoughby, Ohio
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Introducing… OutBack Power’s Radian Series GS8048 Inverter/Charger.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
MarsⅡ On-Line UPS Series
HCAL Fall meeting Oct 11 to 13, 2004 HF assembly, commissioning and integration Ianos schmidt The University of Iowa.
> Micropack System Concept January – Slide 2 Building blocks – Single position power core >Stand alone unit AC Input, L, N, PE, 1,5mm 2 DC Output,
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
NEPTUNE Power Low Voltage Circuit Fall 2003 Quarterly Meeting Tim McGinnis Sept 11-12, 2003.
PRESENTATION. Parts of the PCOS (3) Operator LCD Screen with Counter (4) Printer Compartment (5) Transmission Port (9) “RETURN” Button (8) “CAST” Button.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Dr.F. Arteche EMC DEPFET Project: A general overview.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
© 2013 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton Power.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
S A Griffiths CM42 June 2015 Electrical & Control.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
Cables for the RE4 Upscope in CMS
Integration and Services RE3/1 and RE4/1
Rack Design Proposal as of 01/03/2013
LV-workshop during CMS Electronics week
Integration and Services RE3/1 and RE4/1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
M. Hansen, CERN S. Lusin, CMS TC / UW
Christian Veelken last updated 11/09/06
CMS Area Working Group Meeting
LV Safe Powering from UPS to Clients
Electrical and electronic systems projects
Chamber Design and Integration RE3/1 and RE4/1
ALICE Muon Tracking Upgrade EDR Answers
UPS Connectivity Options: PPDM ( )
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution

2 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling Issues … LV Project is responsible for supplying AC power to input of AC/DC converters For CAEN-based systems this means supplying power cabling to detector For Weiner-based systems power is supplied to USC Power cable chosen is 7x6mm^2, shielded, 23mm dia. Used for CAEN systems, Weiner systems & service power Will be CERN stores item 8 km on order Primary purpose is for installation in YE1, HF cable chain Some cable will be available for magnet test DCS cabling was subdetector responsibility In the interest of system coherence & installation schedule, ESSC has recently agreed to make DCS cabling design & procurement in cable chains for CAEN-bus systems an LV project responsibility Financial responsibilities still to be worked out with subsystems Cable is 50-conductor twisted pair Ends at detector patch panel “Standard” CERN stores cable for this purpose is not available in lengths that we need Alternate cable has been identified, at some cost savings, but needs termination by hand This should not be a problem. Cable counts are not large.

3 S. Lusin, LV Cabling, CERN 06 Apr 06 Cable Selection

4 S. Lusin, LV Cabling, CERN 06 Apr 06 Connectors US- UX Simple, robust design Can be used by all subsystems Service power uses similar connector Smaller insert, prevents cross- plugging Primary power, service power use same kind of cable Can be terminated in place

5 S. Lusin, LV Cabling, CERN 06 Apr 06 Patch panel connections Matches 7x6mm^2 cable to 2 or 3 Harting connector outputs Breakout box design has now been superseded by simple panel Grounding braid termination not shown

6 S. Lusin, LV Cabling, CERN 06 Apr 06 On- Detector (UX-UX) Dist.

7 S. Lusin, LV Cabling, CERN 06 Apr 06 Connectors at LVPS end … Original motivation for quick- connect system was modeled on LV distribution boxes used on standard rack power distribution units First deliveries of A3486 to B904 had standard three- phase plug (right) Needed modification to use 16A Harting connector (below) CMS environment will use 380 and 230V three-phase power Would like to introduce keying mechanism to prevent cross-plugging of AC-DC converters Working with POOL to have vendor implement keying

8 S. Lusin, LV Cabling, CERN 06 Apr 06 LV breakout boxes Favored solutions are currently H & J Needs to be coordinated with CERN POOL & CAEN

9 S. Lusin, LV Cabling, CERN 06 Apr 06 Service Power Options Local Cascade EASY power supplies in hostile area have internal controls that are powered from external source The external source is located in USC Original motivation was to provide battery backup for the control circuit in the hostile area Each EASY module has a control board Current requirements are: A mA All others- 400 mA Adds up to a substantial current in a long cable

10 S. Lusin, LV Cabling, CERN 06 Apr 06 Service power budget If all service power provided from USC …

11 S. Lusin, LV Cabling, CERN 06 Apr 06 Service power budget - Remote Service power supplies are on-detector …

12 S. Lusin, LV Cabling, CERN 06 Apr 06 Cascade Service Power Total power dissipation in USC is 4.7 KW Total power dissipation in cables is 308 W Assumes 10 mm^2 cable pair for ea. Subsystem (for approx. only) Motivation for cascade power configuration is to minimize impact on shared services

13 S. Lusin, LV Cabling, CERN 06 Apr 06 Global LV Partitioning Main UPS capacity is 1.5 MVA Contract is finalized, vendor is MGE Installation design is under way Six isolation transformers in USC 300 KVA each, 380V or 230V three- phase, no neutral Dual electrostatic shields Have to be partitioned out between subsystems Cabling imposes additional constraints No cable can be fed by more than one circuit breaker One circuit breaker can feed two triplets or three pairs One distribution cabinet can hold up to 35 circuit breakers Room for six cabinets available May need more than that

14 S. Lusin, LV Cabling, CERN 06 Apr 06 Proposal for Coordination …