Recap of heat loads and peak doses from HL-LHC Q1 to Q7 L.S. Esposito, F. Cerutti HL-LHC WP3 meeting, 22 May 2014.

Slides:



Advertisements
Similar presentations
D1 and MCBXC pressurized superfluid helium channels sizing for heat extraction Rob van Weelderen
Advertisements

FLUKA status and plan Sixth TLEP workshop CERN, October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
A 10-m long steel wire (cross – section 1cm 2. Young's modulus 2 x N/m 2 ) is subjected to a load of N. How much will the wire stretch under.
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
Beam Loss in the Extraction Line for 2 mrad Crossing Angle A.Drozhdin, N.Mokhov, X.Yang.
R. Ostojic, WAMSDO, 19 May 2008 LHC Insertion Region Upgrade Phase I 1.Upgrade goals and milestones 2.Review of IR systems: main findings 3.The emerging.
Impact of synchrotron radiation in LEPTON COLLIDER arcs
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC: UPDATE ON MAGNETS
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
1 Hi-Lumi WP3 meeting Update on the Q1 to D1 cryostat Jan 28, 2014  Outline  Cryostat cross section options  Elliptical interconnect.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
Beam screens in IT phase 1
DS Heat Load Scenarios in Collision Points and Cleaning Insertions. Prepared by F. Cerutti, A.Lechner and G. Steele on behalf of the FLUKA team (EN-STI)
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Open Midplane Dipole (OMD) Design for Dipole First Layout R. Gupta (BNL), N. Mokhov (FANL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
1 CONSIDERATIONS ON WARM MAGNET MEASURED DOSES 2012 September 3rd Francesco Cerutti for the team key contributions by TE-MSCDavide Tommasini and Pierre.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
The integration of 420 m detectors into the LHC
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Francesco Cerutti ENERGY DEPOSITION ASPECTS FOR LHCb REQUEST 5th Joint HiLumi LHC - LARP Annual Meeting Oct 29, 2015 through L.S. Esposito’s work and essential.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Energy Deposition Issues in LHC IR Upgrades LHC IR Upgrades Workshop Pheasant Run, St. Charles, IL October 3-4, 2005 Fermilab LHC IR 2005 Nikolai Mokhov,
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
A liner in the Corrector package A Cu liner has been inserted in the gap between the CBT and the coil aperture of all the corrector package elements (see.
31/07/08Review new IRs: Energy Deposition1 Energy Deposition in the New IRs Francesco Cerutti, Marco Mauri, Alessio Mereghetti, Ezio Todesco, Elena Wildner.
ENERGY DEPOSITION AND TAS DIAMETER
CERN, 11th November 2011 Hi-lumi meeting
Operating IP8 at high luminosity in the HL-LHC era
Francesco Cerutti, Andrea Tsinganis WP10 Energy deposition & R2E
Beam Energy & Intensity: One bunch during full cycle
Hervé Allain, R. van Weelderen (CERN)
On behalf of the FLUKA team
HL-LHC Aperture Update
Cedric Garion, TE-VSC-DLM, WP12
Cooling Update (27 March 2014)
Energy deposition studies in IR7 for HL-LHC
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
WP3 meeting Aug 21, 2015 V1.1 RECAP Francesco Cerutti.
Cooling Update (25 February 2014)
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Magnetic gap calculation
Beam-Induced Energy Deposition Studies in IR Magnets
WP3 Meeting – December the 10th 2015 H. Prin
Discussion on the TDI impedance specifications
Update on beam screen issues
Upgrade phase 1: Energy deposition in the triplet
PROGRESS TOWARDS AN OPEN MIDPLANE SEPARATION DIPOLE
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
1st HiLumi LHC / LARP Collaboration Meeting 2011 Nov 17th
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Revised estimates of heat loads and radiation damage in the IT and D1
HL-LHC operations with LHCb at high luminosity
Tertiary Collimators in IP1/IP5: Progress Report
FLUKA Energy deposition simulations for quench tests
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
A. Tsinganis, F. Cerutti (EN/STI/FDA)
Cooling Update (27 March 2014)
Review of Quench Limits
Beam Screens Cooling Update (1st Oktober 2014)
L. Gentini, M. Giovannozzi, M. Gonzalez, M. Krupa, H. Mainaud Durand,
Presentation transcript:

Recap of heat loads and peak doses from HL-LHC Q1 to Q7 L.S. Esposito, F. Cerutti HL-LHC WP3 meeting, 22 May 2014

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 Beam Screen design evolution 16 mm absorbers 6 mm absorbers old version (BS #1) new version (BS #2) 1.cooling capillary (tube) size 2.absorber shape 3.INERMET beam screen thickness (2 ⇒ 1 mm) 2 BS #3

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 IT-D1: vertical crossing 3 BS#2, 50 cm gap in ICsBS#2, 10 cm gap in ICsBS#3, 50 cm gap in ICs Power 5 × cm -2 s -1 Magnet cold mass Beam screen Magnet cold mass Beam screen Magnet cold mass Beam screen Q1A + Q1B Q2A + corr Q2B + corr Q3A + Q3B CP D Interconnects Total Total values for horizontal crossing are about 10% lower

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 Matching Section: horizontal crossing 4 Power 5 × cm -2 s -1 D2Q4Q5Q6Q7 Mask length [cm] Q5 aperture [mm] magnets correctors collimator masks (B1+B2) TAN intercepts ≃ 1kW (+20% for vertical crossing) Heat budget going into beam screen ≲ 10% Being the layout under definition, these figures should be taken as a rough estimation

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 Peak dose and peak power density 5 BS #3Q1AQ1BC1Q2AQ2BC2Q3AQ3BC3D1 Peak power density [mW/cm 3 5 × cm -2 s Peak dose [MGy/3000fb -1 ] 81125* *15 *in the vertical plane (i.e. outside the coil) 50cm masks, 70mm Q5 D2 D2 corr Q4 corr Q4Q5 corr Q6 Q6 corr Q7 Q7 corr Peak power density [mW/cm 3 5 × cm -2 s # < Peak dose [MGy/3000fb -1 ] 36 # 4208~ # TCL4 at 20σ

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 Intercomparison with MARS N. Mokhov, I. Rakhno, I. Tropin

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 Integral power 10 cm gap in ICs50 cm gap in ICs Power 5 × cm -2 s -1 Magnet cold mass Beam screen Magnet cold mass Beam screen Magnet cold mass Beam screen Q1A + Q1B Q2A+orb corr Q2B+orb corr Q3A + Q3B CP D Interconnects Total MARS FLUKA BS #1 (for intercomparison purposes)

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 Peak power density BS #1 (for intercomparison purposes)

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 Peak dose BS #1 (for intercomparison purposes)

F. Cerutti, HL-LHC WP3 meeting, 22 May 2014 In word Fine tuning of the new beam screen and interconnect (BPM) design plays an important role in determining peak dose values along the triplet-CP string Looking forward to implementing a realistic orbit corrector design TAN-TCL-TCAX set-up is presently under iteration to protect the matching section Back to numbers At 5L W in the IT-D1 cold masses, 550 W on the beam screen. ~50 W in the D2. In the coils: Peak power densities below 3mW/cm 3 ; Peak dose maxima around 30 MGy per 3000 fb -1 (DPA reaching the range).