TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.

Slides:



Advertisements
Similar presentations
A step-wise path to e61850 with UML IEC TC 57 WG10
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
(Project) SIGN OFF PROCESS June 21, 2010
Systems Engineering in a System of Systems Context
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
MTEI Methods & Tools for Enterprise Integration
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
Query Health Business Working Group Kick-Off September 8, 2011.
1 CIM User Group Conference Call december 8th 2005 Using UN/CEFACT Core Component methodology for EIC/TC 57 works and CIM Jean-Luc SANSON Electrical Network.
Working Group Summaries Genval, Belgium May 14, 2009.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Chavdar Ivanov, ENTSO-E Secretariat | October 2010 ENTSO-E Roadmap on CIM CIM User Group meeting, October 2010, San Francisco, US.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange? - Schematic.
CIM and UML Overview Terry Saxton Xtensible Solutions
CIMug Asset Health Focus Community Update for European CIMug Meeting June 19, 2014 Pat Brown EPRI.
1 RDFid Examples of RDFid: _a73ed7b8a60a4b2ea46318a370b9c7de Definition from the profile The document requires only that in a given full model,
TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13.
J-L Sanson, A. Maizener Cimug © Zamiren CimConteXtor A. Maizener : J.L. Sanson : Credit to Sebastien.
Comments on doing a CIM Project
Demand Response Use Case & Functional Requirements Development UCAIug Meeting Jan 6, 2009 Mark van den Broek.
UCTE Viewpoint towards CIM – project report Chavdar Ivanov, Ph.D. UCTE Secretariat, Convenor of AhG UCTE format CIM User Group meeting, 12-15th May 2009,
© Siemens Energy, Inc Energy Automation CIM Model Management Kurt Hunter 2009 IEEE Power System Conference & Exposition March 18, 2009.
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
Use Cases for TC57 and for other TCs… Eric Lambert EDF R&D CIM User group PRAGUES 2011.
IEC WG Summaries Austin, TX October 24, WG 13 – EMS API Convener: Terry Saxton The principal task of the IEC series of standards is to develop.
© 2011 EnerNex. All Rights Reserved. UCAIug Testing Subcommittee Activities.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
CIM User Group Web Site Update Austin, TX October 23, 2007.
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
12 May 2011 CIM Users Group 2011 Goals Spring Meeting, Prague 12 May 2011.
9-Oct-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security (Report from the LCG Security Group) FNAL 9 October 2003 David Kelsey CCLRC/RAL, UK
TC 57 TC 57 UML/XML Workshop Report for CIM user Group Jun 2007 Netherlands (ARNHEM) EDF R&D.
1 UCA/CIM TSC Enterprise Application Integration Task Force / CIM Tools methodologies  Vasteras meeting  A. Maizener
TC 57 CIM user Group Meeting June 2010 Milano 1 Technical Committee 57 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE.
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona May “ System Interfaces for Distribution Management “ TC57 WG14 Standards IEC
Doing a CIM Project. 22 CIM Design Center  A rule I learned about applying technology:  Understand the design center of the technology.  Use extreme.
Agenda 1. Key Activities, Accomplishments and Status 2. Task Review 3. Meeting Notes and Action Items.
Working Group Summaries Charlotte, NC November 12, 2009.
CIMug Interaction with IEC Randy Rhodes Utility Co-Chair IEEE Power Systems Conference and Expo March 18, 2009.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
The National Grants Partnership March 11, 2008 Michael Pellegrino
Process WG Summary Austin, TX October 26, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Meetings: Europe – June 10, 2008 – June 13, 2008 in.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
TC CIM Model Manager Summary Kendall Demaree AREVA T&D Inc. March 2009.
CIM Users Group 2009 Status Update Terry Saxton Randy Rhodes CIMug Co-Chairs UCAIug Annual Meeting November 9, 2009.
Transition Plan Network Operations Model Change Requests 5/26/2010.
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
Demand Response Use Case & Functional Requirements Development UCAIug Meeting Jan 6, 2009 Mark van den Broek.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
CIMug Focus Communities Address: A high-priority need Where wide input is needed: Utilities Vendors Universities IEC WG experts Fast tracks updates into.
NMMS Nodal Network Mgmt and Monitoring System Update
Deploying ArcGIS at an Gas Utility
Welcome to the CIM University
Presented 12 June 2008 Vasteras, Sweden
EDF expectations regarding Interoperability tests
Definition from the profile
CIM Model Manager Report
Organizing Semantics For Effective Enterprise Application Integration
ESS.VIP VALIDATION An ESS.VIP project for mutual benefits
Organic Information for the 21st Century
Defining a new exchange format using CIM XML
Next Steps Advisory group debrief call Circulate meeting summary
Model Exchange TF Vasteras, June 12, 2008
Stuart McAllister ESTAT F4
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Model Exchange TF Vasteras, June 12, 2008
Kendall Demaree AREVA T&D Inc. CIMug – Tools Breakout June 12, 2008
Presentation transcript:

TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden

TC 57 CIM Model Issues Topics  CIM Issues and Model Release Process  CIM Model Manager role summary  WG13 Roadmap  CIM Issues meetings  CIM Issues Report  CIM Users Group issues web site 2

TC 57 Summary of Issues Process Status  IEC WG19 and CIMug have a vision  Emerging/evolving process  Issues management has been IEC WG focused  Web based submission for CIM Users Group  Initially separate issues lists for Users Group and IEC 3

TC 57 CIM Model Maintenance Diagram 4

TC 57 CIM Model Manager Role  Agreement for 3 year rotation Siemens/ABB/AREVA  Manage and maintain the integrated CIM UML model  Manage the CIM issues list(s)  Facilitate WG 13 Issues discussions meetings  Produce the iec document  Assist CIM UG in answering questions for users  Report to WG 19 and other IEC working groups  CIM Maintainence Process document 5

TC 57 Annual CIM Model Release Cycle 6

TC CIM 13 Model Release Cycle 7

TC 57 8 TC57/WG13 CIM 2007 Plan Version Profile DraftMay 2007May 2008May 2009 Test IOP10 September 2007 IOP11 September 2008 IOP12 September 2009 ReleaseQ1 2008Q1 2009Q Addressed Issues SI units Data type system Control model Load model Equivalents model Other minor changes OWL meta data Multiple inheritance Tools CIM Issues CIM for planning ERCOT issues CIM Issues

TC 57 9 TC57/WG13 CIM Planned Releases Version Profile DraftJune 2008May 2009May 2010 Test IOP11 October 2008 IOP12 September 2009 IOP12 September 2010 ReleaseQ1 2009Q1 2010Q Addressed Issues OWL meta data Tools, EA transition CIM Issues CIM for planning ERCOT issues State exchange Dynamics Models CIM Issues Multiple inheritance? Contextual models CIM Issues Contextual models

TC 57 CIM Issues meetings 2008  Formal typically, weekly since February 14  Typically 6 to 10 participants  WG14 participation and good working relations  Maintaining 13 and 14 issues together  Models regularly merged  Released 3 draft combined EA models including  r02 (latest)  r06 (latest) (maintained originally in Rose)  Other packages carried from CIM12 combined model  Major release after Vasteras for IOP 11 10

TC CIM Issues On The Table For CIM13  Planning model extensions – a primary goal for CIM13  Role model, e.g. ownership, operations, market actors  Load model relation to control  Generation modeling  State variables and exchange of apps solutions  Class, attribute and role name changes for consistency, naming rules  Data types continued clean up  Documentation issues  Equivalents model - testing  Model coordination btw. basic power system (WG13) and distribution management (WG14)  Model authority and network boundaries – exchanges testing  CIM extensions from ERCOT  SCADA functions  Ratings

TC Current CIM Issues  CIM Issues list; CIM_Issues_ xls  WG13 issues  Issues since start; 902  Currently open285  New during 2008;about 300  Closedabout 90  “Ready to Close”;12

TC 57 CIM Issues Web site 13

TC 57 CIM Issues Web site – URL 14   Filter to other views  Review entry of issues  Comments on issues  Issues status  Issues flow back to WG13 issues (separate numbering)  Responses and IEC analysis feed back to CIMug web site list