Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
AUTOMOTIVE COOLING SYSTEMS
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
ZMQS ZMQS
LINAC 4 Emittance Meter.
How To Use Google Forms to Create A Test Quick Easy Self-Graded!! Instant Reports.
ABC Technology Project
SWEDISH EMERGENCY DISASTER EQUIPMENT PREPARATION & DONNING PPE.
Xenon Detector Hardware Liquid Xenon Group. 1 Outline Detector in 2008 Operation in 2008 Hardware Upgrade and Schedule Summary.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Dummy Dealers welcome !. euroCADcrete Step 1: General data euroCADcrete: Educational software according EC2.
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Chapter 5 Microsoft Excel 2007 Window
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Hydronic Balancing Balancing Valves
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
Xenon Detector Xenon Detector Group. 1 Contents Cryostat Construction Detector Preparation Schedule.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Installation of the T600 at Fermilab CSN2, September 22,
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
Ti/SS transitions A.Basti INFN-PISA*
Preparations for test of
Liquid Xenon Detector Xenon Detector Group 2018/11/18.
Cryomodule Assembly Plan
Presentation transcript:

Xenon Detector Status Liquid Xenon Group

1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test at PSI Detector preparation at PSI –Alignment at PiE5 –PMT installation Schedule

2 Cryostat delivery to PSI Delivery to PSI on 5/June 6 weeks delay from the schedule reported in the previous review meeting –Delay of construction not due to a technical problem –Delay of the cryogenic test at SIMIC Difficulty to stop leak

3 Honeycomb panel test completed 3 rd panel delivered to Pisa at 16:30 on 20/Feb Mounted on the text box and tested on 22, 23/Feb –3 bar –Inspection by a Plyform expert –4 bar x4 times Hold for 3 minutes at 4 bar in the last test –Panel deformation (max) 0.3 mm at 1 bar 3.4 mm at 4 bar Holes for evacuation

4 Inspection of the panel

5 Low temperature test Wrapped with insulators and cooled with LN2 Pressurized with compressed air –2 bar –No damage on the panel found

6 And mounted on the cryostat 400 micron carbon-fiber plate between the panel and window to fill the gap As of 13/Mar

7 Cold and Warm Vessel Assembly As of 19/April

8 Cryogenic Test at SIMIC -18/May –All nuts on the covers of the cold vessel were fastened tightly and the warm vessel was evacuated whole weekend. 21/May –He leak test. 1.8Bar He was filled and found that the leak rate was larger than mbarl/sec. Keep evacuation during the night. 22/May –cooling using cold gas from the LN2 tank. Cold gas in the cold vessel Most parts were cooled down to -5~-10 degree C. 23/May –liquid N2 through the cooling pipe. All parts cooled below -110 degreeC around 12:00. –Then N2 gas at 1.0Bar and He gas filled step by step with measuring leak rate. N2 1.0 bar He 0.2 bar  5x10 -7 mbarl/sec N2 1.0 bar He 0.4 bar  1.6x10 -6 mbarl/sec N2 1.0 bar He 0.6 bar  7.8x10 -6 mbarl/sec N2 1.0 bar He 0.8 bar  2.2x10 -5 mbarl/sec The leak was not fixed at SIMIC by any means. We decided to bring the cryostat to PSI and perform a leak test

9 Cryostat arrived at PSI Delivery at 7:00 am on 5/June Works to be done Cleaning Leak/pressure test Alignment –PMT installation –…

10 Leak and Pressure Test at PSI The metal gasket was not compressed correctly due to deformed shape of the flange Re-machining the flanges by hand Supporting structure installed to evacuate the inner vessel for the leak test cover flange gasket

11 Leak Test at PSI Finally we found a hole on the welding line of the thin window!

12 Leak test again After closing the hole, we performed a leak test again (with recycling the metal gaskets and with viton O-rings) Cracks found at corners –Eddy-current measurement US-bottom d1.3mm L7mm, -top OK DS-bottom d0.8mm L13mm, -top d0.8mm L5mm It was confirmed that these did not cause leak. In the end we confirmed the tightness of the cryostat by using viton O-rings. –Leak rate < 3x10 -9 mbarl/sec

13 Alignment at PiE5 Decide the cryostat position on the platform. Check how we can install the cryostat in the electronics hut

14 Alignment at PiE5 Alignment of the cryostat –PMT support is aligned relative to the beam line within an accuracy of 1mm –Cryostat leg positions determined on the platform Screw holes to fix the legs G10 insulator between the platform and legs

15 Piping and cabling Working in a clean hut Cabling from patchpanels to feedthru almost finished LN2, GXe, LXe piping is ongoing in parallel to PMT installation

16 PMT installation Patchpanel – Feedthru cabring completed PMT installation started on 8/July –Outer and Top PMT installation completed on 9/July –Now working on the inner (as of 12/July)

17 Schedule PMT installation, -19/July PMT test at room temperature, 20-23/July He leak test, 25-28/July Ready to move to PiE5 on 30/July Evacuation and liquefaction in August –950 liter xenon is already liquefied Alpha/cosmic runs at the end of August –In parallel to purification –Monitor xenon purity

18