Jeff Brown, Chief, Office of Airports September 12, 2014 Caltrans Division of Aeronautics.

Slides:



Advertisements
Similar presentations
Scotiabank Student GIC Program
Advertisements

Part 139 Training 1.
Slide 1 FastFacts Feature Presentation June 5 th, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 Charter Schools - Site and Plan Approval School Facilities Planning Division Liese Olukoya, Consultant.
CMAA Site Review (Audit File) Training. Frequency: On site reviews conducted at least once every four years Technical Assistance reviews conducted every.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Airport Layout Plans (ALPs)
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Dave Baker – Aeronautics Commission Contract Approval Anu Taneja – Sponsor Contracts Jennifer Forbes – Grant Closeout AERONAUTICS GRANT INITIATION AND.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Photo by Karl Steinbrenner Charge Card Supervisor/Reviewer Training 2014.
FAA Office of Airports Airport Fuel Storage and Handling
Gary Cathey Division Chief Caltrans Division of Aeronautics.
AACC Compatible Land Use Planning Series Series Includes Presentations from: FAA Airports Division – March 10 AACC Meeting Planning Department, Municipality.
Caltrans Division of Aeronautics
Airport Obstruction Issues GAA Workshop March 14 th, 2014 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program Manager.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
Registered Nurse Education Programs Capitation & Special Programs Funding Webinar Presented by: Barbara Zendejas, Melissa Omand and Manuela Lachica,
USC Clinical Trials Office (CTO) Submitting your Studies to CTO For Processing Soheil Jadali Director, Clinical Trial Office.
Provided by: Food Services Division Training for the After School Snack Program
Presented to: AIP Grant Process Workshop By: Roxane Wren and Edward Gabsewics, CEP Date: December 2009 Federal Aviation Administration Grant Application.
Airport Development Process - Airport Capital Improvement Plan (ACIP)
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
17-Month OPT STEM Extension
Financial Aid Renewal
Glenn Kirksey| June 2014 U.S. Department of Education Software Vendors Webinar EDE Suite Update for Software Vendors.
Spring Workshop Georgia Airports Association
MAJOR REPAIRS AND ALTERATIONS
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Caltrans Division of Aeronautics
GARY CATHEY Chief Caltrans Division of Aeronautics.
State Grants For California Airports Gwyn Reese, Aviation Funding Specialist Caltrans - Division of Aeronautics September 2006.
CTAA Expo 2009 CTAA Expo 2009 State DOT Roundtable Kimberly A. Gayle, Office Chief Federal Transit Grants Programs Division of Mass Transportation June.
1Caltrans Division of Aeronautics. 2 Aeronautics Mission Assist in the development and preservation of a safe and environmentally compatible air transportation.
Presented to: By: Date: Federal Aviation Administration Federal Grants and Airport Capital Improvement Programs Western-Pacific Region Association of California.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
SRC Application Process Fall 2014 Version: November 12, 2014.
Federal Aviation Administration Airports Division Eastern Region AIP Grant Program: Dates & Deadlines Hershey Conference, March 8, 2007.
Overview of the Federal Aid Process for Transportation Projects.
California ACIP prepared for Caltrans California Division of Aeronautics GCR & Associates, Inc.
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
The mission of the Office of Migrant Education is to provide excellent leadership, technical assistance, and financial support to improve the educational.
Basic Financial Reporting Carol A. Langguth Division Director Duane Alphs Team Leader Awards Management Division Office of Grants & Financial Management.
Caltrans Division of Aeronautics Grants and Loans Tony Sordello, Caltrans - Division of Aeronautics September 12, 2012.
Gary Cathey, Chief September 13, 2013 Caltrans Division of Aeronautics.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
Capital Improvement Plan (CIP) Lee Provost, Chief Office of Technical Services Senior Transportation Engineer Phone:
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
Presented to: By: Date: Federal Aviation Administration Part 13 Informal Complaint Process Filing and Investigating Informal Complaints 35 th Annual Airports.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Performance Reporting GAANN Project Director’s Meeting Rebecca Green.
State Safety Inspections and Sponsor Expectations.
Regional Planning Meetings 2005 Capital Improvement Program Overview Presented by Steven Cooks, Airport Planner.
Grants Assistance Unit. Ted Nelson, Director (213) Ronice White, Administrative Analyst (213)
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Site Coordinator Meeting September 18, Attendance Guidelines Overview 2.Attendance Targets for FY Documentation of students who have delayed.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
State Safety Inspections
Hangar Use Policy Winter Operations and Field Condition Reporting
ACA – Fall Conference FAA AIP Grants Management
KANSAS STATE UNIVERSITY
Residential Placement Application 2011
Vendor Identification Codes, Zip Codes, 1099s and Unclaimed Property
Effectively Communicating Your Project in a Funding Request
Presentation transcript:

Jeff Brown, Chief, Office of Airports September 12, 2014 Caltrans Division of Aeronautics

AIP State Matching Grant Update ALUCP Update Grant Process Airport Sponsor / Caltrans Coordination Airport Response to State Inspections Sponsor Coordination of 5010 Updates with both the FAA and the State. ACA Conference Topics

Caltrans Division of Aeronautics AIP State Matching Grant Update ACA Conference Topics

Caltrans Division of Aeronautics4 Grant Update – Budget Overview FY 2014–15 revenues projected to be ~ $5.3 million … amount is still approximately 25% less than FY ($7.2M) and earlier. Grant funding is limited, but as many grants as possible will be funded. Please check our funding status at: Click the link for “Airport Funding Status.”

Caltrans Division of Aeronautics5 Grant Update – Aero Web Site

Grant Update – Budget Overview (con’t) We WILL be able to fund 100% of Annual Grants, and will fund as many AIP Matching Grants and A&D Grants as funds allow. A transfer of $4 million from the Local Airport Loan Account to the Aeronautics Account was requested by Caltrans and approved by the Governor. This funding will be used for $5.6 million in AIP and A&D Grants for General Aviation airports in California. Caltrans Division of Aeronautics6

7 Grant Update – AIP Match Status California Transportation Commission (CTC) must approve annual State AIP Match set-aside amount and the AIP match rate. On August 20, 2014, the CTC approved an allocation of $550K for the AIP Match set-aside amount for State FY Individual grant match limited to $100K. Requests > $100K must be approved by CTC on a case-by-case basis. If $550K exhausted, Aero must request additional set-aside from CTC (assuming funding is available). AIP Match Rate remains at 5% (unless match limited to $100K).

Caltrans Division of Aeronautics8 Grant Update – AIP Match Process To receive a State AIP Matching Grant: Sponsor must have an executed FAA AIP grant agreement for the project. Project must be in the current Capital Improvement Plan. Sponsor must apply to Aero with: Completed State Matching Grant application (Form DOA-0012). Completed California Aid to Airports Certification (Form DOA-0007). Copy of FAA grant agreement with FAA & Sponsor signatures. Local Government approval (Resolution per Calif. Code of Regulations). Documentation of compliance with CEQA (NEPA does not count). Sketch of project location and dimensions (on 11” x 17” sheet). Project must not have started before allocation of State funds.

Caltrans Division of Aeronautics9 Grant Update – AIP Match Notes Sponsor must be eligible (GA or Reliever Airport). Project must be eligible (primarily for GA purposes). Turn around time is approximately 2 weeks (review by Aviation Funding Specialist, Engineer, and Aviation Safety Officer; generation of contract & return by sponsor). The AIP Matching Grant process is explained on the Aeronautics website and in the Aeronautics “State Dollars for your Airports” guidebook. Aero’s Aviation Funding Specialist is Bambi Jake. (916)

Caltrans Division of Aeronautics10 Grant Update - State Dollars for Your Airport State Dollars for Your Airport is on our website: The document can be found under “Publications and Forms.” This is a “How to…” manual for airport managers, sponsoring agencies, and ALUCs to better understand the funding programs and application procedures.

Caltrans Division of Aeronautics11 Grant Update - Summary Check our website for updates on: 1.Annual Credit grant program - $10K/yr 2.State AIP Matching grant program - 5% 3.Acquisition and Development grant - 90% 4.Airport Loans – 3.7% APR (funds available) Detailed program information and forms are located at Click on the “Grants and Loans” tab.

Caltrans Division of Aeronautics12 ALUCP Update Grant Process ACA Conference Topics

Caltrans Division of Aeronautics13 ALUCP Update Grant – General The State issues grants for updates of Airport Land Use Compatibility Plans (ALUCPs). Many ALUCPs are out of date. ALUCP grants are A&D grants and subject to A&D grant funding limitations (Annual Credit Grants (the $10K to GA airports) first, then AIP Matching Grants, then A&D grants). Current Target is 30% of A&D funding to ALUCP updates. To be eligible for an ALUCP grant, the project must be submitted into the CIP. Regional Transportation Planning Agencies and Airport Land Use Commissions are sent a CIP letter regarding ALUCP updates, but Airport Managers need to enter these projects into the CIP. Project submissions must include all expected costs (may include costs associated with the CEQA process). Initial contact in Aero is Terry Barrie: (916) ;

Caltrans Division of Aeronautics14 Airport Sponsor / Caltrans Coordination ACA Conference Topics

Caltrans Division of Aeronautics15 Airport Sponsor / Caltrans Coordination Specific issue - “eliminating Sponsor loss of AIP Matching Grants.” AIP Matching Grant requirements shown on earlier slide. Assuming sponsor submits a complete package and: State budget signed (may be delays starting in July at begin of FY) CTC has approved allocation of State AIP Matching Grant set-aside And Aero has funding available … the delay should be minimal (~2 weeks) General Recommendations: Ensure any and all projects involving potential State Funding are submitted into the CURRENT CIP (letters for 2015 CIP coming soon …). Get sketch, CEQA, local Govt approval, etc. completed while awaiting execution of Federal grant by FAA. Please contact us if you have questions, need to confirm status, etc.

Caltrans Division of Aeronautics16 Airport Response to State Inspections ACA Conference Topics

Caltrans Division of Aeronautics17 Response to State Airport Inspections Should not be any surprises in the letter … inspections conducted with Airport Manager or rep … issues explained during the inspection. Note: Copy of letter sent to appropriate FAA ADO. If there are discrepancies, we request a written response ( or letter) detailing action taken, plan for addressing issues, & any questions/concerns. For “Safety” issues, we expect immediate action. For longer term items (pavement, faded markings, trees, etc.) we would like to see how and when you plan to address the issue. Please send response within 30 days even if not all the items have been completed. Looking for ongoing incremental improvement.

Caltrans Division of Aeronautics18 Sponsor Coordination of 5010 Updates with both the FAA and the State. ACA Conference Topics

Caltrans Division of Aeronautics Updates – Coordination with FAA and State Topic – How should Airport Sponsors coordinate with both the FAA and the State? First, take ownership of your 5010 Current Form can be found at the website of the FAA’s contractor for the Airport Master Record program, GCR Inc. FAA has an Advisory Circular, 150/ A, on the Airport Master Record … for new airport, but has info on all the Data Elements to help understand the code and requirements. 5010’s are data-mined for many publicly available flight planning publications and websites, so it is critically important that your Form (and A/FD entry) be up-to-date, particularly for operational information such as runway lengths, displaced thresholds, etc., airport services, and contact information.

Caltrans Division of Aeronautics Updates – Coordination with FAA and State (con’t) Then …. depends … On type of Airport: Part 139 – work with FAA Cert Inspector (State locked out). All Others – State has FAA 5010 Contract … but see below. On type of Change: Runway-related changes (length, weight bearing, etc.) – work with FAA ADO (State locked out). For Projects, ensure 5010 is updated along with ALP, etc. Also, remember to updated Based Aircraft information and provide Wildlife Survey updates to the State inspector. In general, we would appreciate notification of any changes to the 5010 (both for knowing current airport information and to determine if Airport Permit is affected).

Caltrans Division of Aeronautics21 Questions? Please visit the Aeronautics website at: Thank you!