State of Good Repair Roundtable

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Operations Management Maintenance and Reliability Chapter 17
Jarvis plc 2007 Half Year Results Presentation 27 November 2007.
1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
Metropolitan Transportation Authority November 2008 Financial Plan /15/ :22 AM 1 Metropolitan Transportation Authority November 20,
Metropolitan Transportation Authority Presentation to the Joint Legislative Fiscal Committee February 13, 2008 MTA 2008 Operating and Capital Programs.
Mn/DOT Economic Recovery Program Update Feb. 19, 2009.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Planning After PLANYC: A Framework for Developing New York Citys Next Ten-Year Capital Strategy 1 The Most Important Economic and Fiscal Decisions Facing.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Water Distribution Systems – Part 1
Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric.
Mid Ohio Development Exchange (MODE) Presentation January 16, 2014.
M E T R O P O L I T A N W A S H I N G T O N A I R P O R T S A U T H O R I T Y 1 Mobility Challenges at Washington Dulles International and Ronald Reagan.
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
Strategy Review Meeting Strategy Review Meeting
Public Works Road Fund Overview May 2, 2013 Tanya Heaton, PW Budget Manager.
Addition 1’s to 20.
25 seconds left…...
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
Week 1.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
WMATA’s FY2010 Budget Presented to the Committee on Public Works and Transportation Council of the District of Columbia The Honorable Jim Graham, Chairman.
MBTA State of Good Repair Database
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM.
June 1, Ride On Montgomery County  More than 80 Routes  Over 77,000 Trips per Weekday  Fleet includes 250 Large buses 100 Contractor buses.
Darton Ito Manager, Long Range & Capital Planning Drew Howard
State of 2009 State of Good Repair Roundtable New York City Transit July 2009.
BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013.
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
PennDot Presentation Transit Agency Status Wednesday, November 2, 2011
 Steady State Service Levels through FY2016  Continuation of “$0” Annual Salary Increases for all Represented and Non- Represented Employees (represents.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Service Planning and Integration Study Work Group Report 7/30/13.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
1 MetropolitanCouncil Transit CapitalImprovement ProgramOctober 22, 2008.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Port Authority of Allegheny County FISCAL YEAR 2003 BUDGET As presented to the TFLEX Conference August 19, 2002.
00 Metropolitan Transit System Transit Serving Point Loma September 23, 2008.
1 FY05 Budget Proposal March 4, Presentation Overview FY04 ridership and improvements FY05 background FY05 anticipated outcomes FY05 budget highlights.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Washington Metropolitan Area Transit Authority 1 Presentation to the National Capital Region Transportation Planning Board September 21, 2005 Dedicated.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
1 Transit Capacity Constraint Presented to: TPB Technical Committee April 1, 2005 Lora Byala Washington Metropolitan Area Transit Authority Office of Business.
Niagara Frontier Transportation Authority: The Niagara Frontier Transportation Authority is a multimodal organization serving the Buffalo Niagara Region.
Development of a System-Wide Asset Management Program Southeastern Pennsylvania Transportation Authority Jeffrey D. Knueppel, PE Chief Engineer and Assistant.
Los Angeles County Metropolitan Transportation Authority FY16 Budget Development: Preliminary Capital Program Board Staff Briefing February 12, 2015 The.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Metrô Rio & SuperVia March Location BRASIL Rio de Janeiro Rio Rio de Janeiro Metropolitan Region - Population: 11,6 million - Counties: %
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Metropolitan Council Transit Capital Improvement Program October 10, 2007.
Update & Overview. August 12, : Assessment and Action Challenges: Understand RTD’s people, practices, projects, challenges Compare with others.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Transit Capital Project Revenue Advisory Board June 16, 2016 Virginia Department of Rail & Public Transportation Transit Resource Allocation Plan Capital.
MARTA 2009 Budget Summary Review
Technology Core Functions
APTA Sustainability Workshop 2016
Review of 2018–2023 Strategic Budget Plan Development Process and
Capital Metro Long-Range Financial Forecast ( )
APTA Sustainability Workshop 2016
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
Presentation transcript:

State of Good Repair Roundtable Washington Court Hotel 525 New Jersey Avenue, N.W. Washington, DC 20001 July 8 -10, 2009

Metro System Second Largest Rail Transit System Fifth Largest Bus Network Serves a population of 3.5 Million One of the new generation heavy rail systems, with BART and MARTA, reaching mid-life.

Engineering Design Began 1967 Construction Began 1969 MetroRail Engineering Design Began 1967 Construction Began 1969

MetroRail Red Line Opened March 27, 1976 Rhode Island Ave to Farragut North 4.2 Miles 5 stations

Current System Completed Dec 18, 2004

MetroRail 106.3 Miles 86 Stations Subway: 50.5 miles, 47 Stations Surface: 46.3 miles, 33 Stations Aerial: 9.2 miles, 47 Bridges, 6 Stations 588 Escalators, 232 Elevators Parking Structures: 21 Rail Yards: 9 106.3 Miles includes 1,119,360 LF of Running Rail 102,667 cross ties 330,512 trackfastners And 694 turnouts Rail Yards Includes: Shady Grove Brentwood Glenmont Greenbelt Branch Avenue New Carrollton Alexandria West Falls Church Largo Tail Tracks

MetroBus Formed by the purchased of four separate bus companies in 1973 Assets were acquired over a period of 90 years: Bus garages Storage areas 1000 bus shelters Radio system Associated support facilities and equipment Metrobus was formed when the Authority purchased four regional bus operations and consolidated them into MetroBus in 1973. The regional bus companies began as streetcar operators in the late 1800’s and early 1900’s. Bus assets include bus garages and storage areas, buses, 1000 bus shelters, a radio system, and associated support facilities and equipment. The assets of the Metrobus system were acquired over 90 years, the oldest being Western Bus Garage that was originally constructed in 1909.

Capital Improvement Plan History 1998 F.R. Harris Report - Twenty Year Capital Improvement Plan − Capital asset database − Infrastructure renewal requirements November 2002 - Ten Year CIP (FY04 - FY13), $12.2 billion – “MUST DO” Infrastructure Renewal – “NEED TO DO” Systems Access and Capacity – “SHOULD DO” System Expansion System Access, $2.9 Infrastructure Renewal, $3.3 System Expansion, $6.0

Capital Improvement Plan History October 2004- Metro Matters($2.7 Billion for FY05 -FY10) - Fully funded “MUST-DO” Partially funded “NEED-TO-DO” No funding for “SHOULD-DO” January 2005 - COG Blue Ribbon Panel (FY05- FY 15) - Capital Needs: $800 Million per year Capital Revenue: $500 Million per year Shortfall: $300 Million per year

State of Good Repair – Going Forward • The Metro Matters agreement established an average level of capital spending of about $500 million annually • Going forward, a greater need exists just to keep the system in a State- of-Good Repair • The increased need is due to the following: - For the first time, Metro is faced with the replacement of a series of railcars. Employee facilities include: Bus Bathrooms Driver waiting areas Locker rooms - Many assets have a 30-year life cycle. - New or modified capital programs are included, i.e. IT, Metro Access, Employee Facilities.

Capital Improvement Plan Inputs Long-range Planning Ridership/Capacity forecast Customer Service Technology Organization’s Goals Asset Mgmt Asset Condition SOGR Replacement Cycles Capital Program Organizational Constraints Financial Procurement Track Rights

Capital Needs Assessment - Overview What’s included in the capital needs assessment: 10 year focus ”Unconstrained” by funding limits Improvements needed to keep the transit system in a state of good repair Improvements that will enhance service and the customer experience Increases in rail and bus capacity to meet demand and serve new markets What’s not included in the capital needs assessment: System expansion projects: New rail lines New stations or station entrances

State of Good Repair - Asset Categories Rail Fleet Bus Fleet Paratransit Fleet Non-Revenue Fleet Maintenance and Support Facilities Passenger Facilities (Vertical Transportation) Passenger Facilities (Station Facilities) Track and Structures Systems (ATC & Power) Systems (Fare Payment) Systems (Safety & Security) Information Technology

Prioritization and Programming Capital Planning Process Capital Prioritization and Programming Capital Planning Long-range plan Asset Management Organization’s Goals Organization’s Constraints Capital Budgeting Monitoring Implementation

State of Good Repair Needs - Highlights Replacement of 300 1000-Series Cars and Rehab of 100 4000-Series Cars plus Commissioning Facility Replace older buses (100 per year) to maintain an average fleet age of 7.5 years Maintain the structural integrity of Metrorail bridges, tunnels, platforms, and emergency exits Replace 52,800 linear feet of running rail and 30 switches per year, as well as the renewal of other critical track components Replace 4 bus garages Replace traction power switchgear Replace and upgrade AFC equipment system-wide Rehabilitate automatic train control Comprehensive upgrade of IT data centers and infrastructure

Resolve Organizational Constraints Long-range Planning Ridership/Capacity forecast Customer Service Technology Asset Mgmt Asset Condition SOGR Replacement Cycles Organization’s Goals Capital Program Organizational Constraints Financial Procurement Track Rights

Current Practice Multiple rehab contracts; multiple contractors Track rights conflicts between contractors and with WMATA Maintenance Week-night non-revenue work window 2-1/2 hours maximum Low productivity Contract delays Higher cost

New Practice Track Rights Divide the system into segments Start with oldest sections first Single tracking during week and limited weekends Work in same areas as WMATA Maintenance Award one contract to perform all rehabilitation work in one segment of the system

Procurement and Financial New Practice Procurement and Financial Award one contract to perform all rehabilitation work in one segment of the system. Reduced Procurement Effort Reduced Project Management Minimizes Conflicts and Delays

New Approach: Red Line Contract Breakout Shady Grove A017 N Rockville A015 B012 Twinbrook Glenmont Red Line Contracts: 1. DuPont to Silver Spring 2. DuPont to Grosvenor 3. Grosvenor to Shady Grove and Silver Spring to Glenmont B011 White Flint A014 Wheaton Grosvenor-Strathmore B010 A013 Forest Glen Medical Center B009 Silver Spring A011 Bethesda Takoma B006 A010 Friendship Heights A009 Fort Totten Tenleytown-AU TWO LEVELS Van Ness- UDC Cleveland Park B006 Brookland - CUA A006 Woodley Park-Zoo/ Adams Morgan B004 Brentwood Rhode Island Ave- A004 Dupont Circle B005 B003c B003 A003 B001 B003b Farragut North New York Ave.- Florida Ave. - Gallaudet Univ. A002 A001 Union Metro Center B002 Station TWO LEVELS Chinatown Gallery Place- Judiciary TWO LEVELS Sq

New Approach: Bus Facilities and Rail Yards Current Practice Bus Facilities and Rail Yard Contracts: Multiple Contracts for various equipment and facility renovations Revised Bus Facilities and Rail Yard Contracts: Start with oldest first Separate Contracts for Rail Yards and Bus Facilities Rail Yards would be divided into 3 contracts as follows: Brentwood, New Carrollton and Alexandria West Falls Church, Greenbelt, Shady Grove Branch Avenue, Glenmont and Largo Tail Tracks Bus Facilities would be divided into 3 contracts as follows: Western, Southern and Northern Landover and Montgomery Bladensburg and Four Mile Run

What is State of Good Repair? •“‘State of Good Repair” is achieved when the infrastructure components are replaced on a schedule consistent with their life expectancy • For example: Useful life of a bus is 15 years. In order to sustain a replacement of the fleet on an annual, prescribed, basis 1/15 of the fleet is replaced each year. Annual replacement will grow as fleet grows. –

QUESTIONS?