Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.

Slides:



Advertisements
Similar presentations
Next Home µox Compact troubleshooting guide Start the slide show then click Next.
Advertisements

Safety Curriculum Project ChildSafe Putting A Lock On Safety! A nationwide program of the National Shooting Sports Foundation and its community partners.
Next Home Visio2 troubleshooting guide Start the slide show then click Next.
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Daikin Altherma™ Troubling Shooting
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Refrigerators.
2 Fire Fighter Qualifications and Safety Skill Drills.
TSI Nephelometer Zero Filter Assembly Zero filter valve Zero filter Zero filter motor Metal flange.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
Optical Manufacturing Solutions 1 Probe Assembly.
Project 2000 University Product Training
FoamPro 1600 Series Fully automatic Class A foam ONLY
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
GI/EMME series TRAining CEntre Burner setting. TRAining CEntre Setting sequence: OIL PRESSURE SETTING : Pump and pressure regulator AIR QUANTITY SETTING.
Model 495/496 EP Full lift safety valve with spring loading (AIT) model 495/496 - EP. 1. Disassembly and assembly. 1.1 Disassembly. To replace the spring,
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
Next Home EcoCompact troubleshooting guide Start the slide show then click Next.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
C OINS The coin operated binocular / telescope can accept most, though not all,coins into the coin chute. It can be program easily by yourself or you can.
Power-Fill Operation Demonstration Power-Fill Operation Demonstration (See Installation and Operation Manual for detailed instructions)
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
Installation and Initial Start Up Worldwide Manufacturer of PSA Generators by Laco Remias, Service Engineer, Aftersales & Service.
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
Marubot Football League Service Manual.
OXYTRONIC 600 CONTINOUS FLOW NITROX SYSTEM
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
© 2012 Rinnai America Corporation Rinnai Circ-Logic (RCL)
Next Home Remote Controlled Cliqueur troubleshooting guide Start the slide show then click Next.
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
AccuMax Multi-Point Injection Mechanics
Hydronic Mechanical Controls
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
How To Replace Your Fuel Filter On a 1998 Mustang GT.
Pump performance testing living with the lab © 2011 LWTL Faculty Team.
Respirator Safety This Training Covers Respirator Inspection User Fit Checks Respirator Cleaning Respirator Storage.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Unit 205: Cold water systems
Settings & Adjustments. Settings & Adjustments.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
Software Overview The software that controls the Place n’ Paste is designed to be robust and error proof. With minimal intervention from the user, the.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
COMPUTER HARDWARE SERVICING
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Discover the Dosmatic Difference Trouble Shooting your Dosmatic injector for years of service.
Smart Board Troubleshooting.  The User Guide contains useful information such as installing, connecting, maintaining, and troubleshooting your Smart.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
MSA Passport  Personal Alarm Combustible gases and vapors Oxygen enriched Oxygen deficient Specific Toxic gases Alarm levels are set at the factory.
Quick Start Guide for Flex Flow Pump
Safety Curriculum Project ChildSafe Putting A Lock On Safety!
Fault detection Lecture (1).
EnTrans Technology Co., Ltd.
Actuators and directional control valves
HIGH PERFORMANCE PRESSURE SYSTEMS.
Maintenance masterdrive siemens
WASHERS.
SB Packing Automatic Downpuller Power Unit
Troubleshooting 11/14/2018 Water King Service Seminar.
Basic Electronics Part Two: Electronic Components.
Compressor Operating Instructions
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
Presentation transcript:

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0

E-Learning SAFETY INFORMATION The operations described in the present document must be performed only by technicians who are instructed about the risks becoming from high voltage electricity. E-Learning

HOME E-Learning · PROBLEM SOLVING PROCEDURE · REPLACING ELECTRONIC BOARD · ADJUSTING CUT-IN PRESSURE · FLOW SENSOR CALIBRATION · CLEANING THE CHECK-VALVE E-Learning

Is the device powered on (green LED on) ? E-Learning Is the device powered on (green LED on) ? YES NO Check power supply cable and plug Check incoming voltage Check electronic board for possible damages (if necessary replace the board following the procedure )

Which is the problem ? The pump doesn’t start! The pump doesn’t stop! E-Learning Which is the problem ? The pump doesn’t start! The pump doesn’t stop! Others…

Pump doesn’t start: does the device show a FAILURE (red LED on) ? E-Learning Pump doesn’t start: does the device show a FAILURE (red LED on) ? YES NO

Pump doesn’t start and FAILURE light is ON: E-Learning Pump doesn’t start and FAILURE light is ON: Starting pressure is set too high. Carry-out pressure adjustment Check the motor of the pump for possible failures (i.e. starting capacitor, locked rotor, thermal protection, etc.) Check the cable between Brio and the pump If a float switch has been installed between the Brio and the pump please remove it. If the device is installed on a submersible pump and the problem appears when the system is inactive for several hours, arrange a small bypass - Check electronic board for possible damages (if necessary replace the board following the procedure )

Pump doesn’t start and FAILURE light is OFF: E-Learning Pump doesn’t start and FAILURE light is OFF: Starting pressure is set too low. Carry-out pressure adjustment If a non return valve has been installed directly before or directly after the Brio, please remove it. Check this example. Check electronic board for possible damages (if necessary replace the board following the procedure )

E-Learning INSTALLATION OF NON-RETURN VALVES 1) Never install a non return-valve between the pump and the Brio. 2) Never install a non return valve at the outlet of Brio. 3) When the Brio is installed with a submersible pump, it’s allowed to install a non return valve at a distance > 3mt from the Brio.

E-Learning ADJUSTING STARTING PRESSURE The cut-in pressure must be adjusted according to the height of the water column at the exit of Brio. Each 1 mt. of water column of water corresponds to 0.1 Bar. The factory setting is 1.5 Bar and allows the Brio to operate up to 15 mt. To make an optimal setting of the starting pressure: unscrew completely the setting screw ( “-” direction) open the highest tap on the system and wait for complete water discharge (pump should not start) 3) turn the screw progressively clockwise ( “+” ) until the pump will start. turn the setting screw clockwise (“+”) for 2-3 turns more to grant a constant functioning along the time.

E-Learning CREATING A BY-PASS When the Brio is installed on a submersible pump and the non return valve incorporated on the pump has a leakage and cannot grant a perfect seal, it can happen that the pipe between the pump and the Brio gets empty during long periods of inactivity (i.e. during the night). When the pump is re-started, the user can get an error for “dry running” because the water needs to much time to be lifted from the ground. The problem can be solved by installing a small by-pass (max.Ø 6.0mm) over the Brio in order to grant communication between the pipes before and after the Brio. In case of leakages from the non-return valve incorporated on the pump, the pressure drop will be detected by the Brio that will automatically re-start the pump and will keep the pipe full of water.

E-Learning REPLACING THE ELECTRONIC BOARD Open the unit cover, unplug the electrical cables and remove the electric board internal protection cover by means of the 2 fastening screws. Unplug the pressure switch connector and remove the electronic board releasing the fastening screws. Place the new electronic board and fasten it by means of the two proper screws, then plug again the pressure switch connector. Put on back the board protection cover and the RESET button extension. Connect again the electric cables and close the unit cover. VERY IMPORTANT !! CARRY OUT FLOW SENSOR CALIBRATION!

E-Learning FLOW SENSOR CALIBRATION Keep the RESET button pressed and reconnect the power supply. When the green and red light are both on, release the RESET button. Make sure the check valve is closed (absence of flow) and press the RESET button in order to automatically reset the flow sensor to zero. Check the device correct functioning closing all the taps and waiting the pump stop. If this does not happen, then repeat again previous steps.

Pump doesn’t stop E-Learning Flow sensor is not calibrated. Carry out automatic calibration. The check-valve is dirty or is stuck. Please clean it! There’s a serious leakage somewhere in the system, please check. If a non return valve has been installed directly before or directly after the Brio please remove it. Check this example Please check if the RESET button is stuck. - Check electronic board for possible damages (if necessary replace the board following the procedure )

Other conditions: E-Learning 1) THE PUMP CONTINUOUSLY STOPS AND IMMEDIATELY RE-STARTS or 2) SOMETIMES THE PUMP STARTS EVEN IN ABSENCE OF WATER CONSUMPTION: - check for possible leakages in the system. - install a small pressure tank after the Brio

E-Learning CLEANING THE CHECK VALVE If there’s some dirt inside the inlet hub and the check-valve cannot close completely, it could happen that the pump doesn’t stop. In that case the check-valve can be cleaned by means of the following actions: 1) Try to move the check valve with a finger, push and release the valve in order to remove stones or similar objects. 2) Try to clean the valve using compressed air, from the inlet to the outlet. 3) If the previous actions don’t solve the problem, proceed with disassembling the check-valve.

E-Learning DISASSEMBLING CHECK VALVE The check-valve can be fully inspected by removing the inlet hub. The inlet hub can be unscrewed taking care do not damage the plastic parts of Brio. MAGNET When re-assembling the check-valve and the inlet hub, take care of the correct alignment of the magnet. The magnet must be displaced toward the electronic board.