August 14, 2003 Blackout Summary Based on Interim Report of the
Advertisements

1 Joint U.S.-Canada Power System Outage Investigation Interim Report Causes of the August 14 th Blackout in the United States and Canada.
Prepared by: ACTION Registry-GWTG Results: January – December, 2008.
Tax Credit Investment Advisory Services Quantitative Economics and Statistics April 26, 2007 Understanding the Dynamics IV Housing Tax Credit Investment.
CALENDAR.
Break Time Remaining 10:00.
EE 369 POWER SYSTEM ANALYSIS
Announcements Homework 6 is due on Thursday (Oct 18)
Liberalization and deregulation of the markets power systems must be competitive, high profitable and efficient Steady increase of power demand but often.

PP Test Review Sections 6-1 to 6-6
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
: 3 00.
5 minutes.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Clock will move after 1 minute
Select a time to count down from the clock above
FIGURE 3-1 Basic parts of a computer. Dale R. Patrick Electricity and Electronics: A Survey, 5e Copyright ©2002 by Pearson Education, Inc. Upper Saddle.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
Security of Supply Issues: Technical & Economic Aspects Chen-Ching Liu Advanced Power Technologies Center University of Washington.
Background Information on the Newspoets Total Number: 78 active newspoets. 26 (of the original 36) newspoets from returned this year.
NICS Index State Participation As of 12/31/2007 DC NE NY WI IN NH MD CA NV IL OR TN PA CT ID MT WY ND SD NM KS TX AR OK MN OH WV MSAL KY SC MO ME MA DE.
National Journal Presentation Credits Producers: Katharine Conlon Director: Afzal Bari House Committee Maps Updated: March 19, 2015.
Essential Health Benefits Benchmark Plan Selection, as of October 2012
House Price
House price index for AK
WY WI WV WA VA VT UT TX TN SD SC RI PA OR* OK OH ND NC NY NM* NJ NH
Recovery Act Smart Grid Funds: $4.5 Billion
Expansion states with Republican governors outnumber expansion states with Democratic governors, May 2018 WY WI WV◊ WA VA^ VT UT TX TN SD SC RI PA OR OK.
Expansion states with Republican governors outnumber expansion states with Democratic governors, January WY WI WV◊ WA VA VT UT TX TN SD SC RI PA.
Share of Births Covered by Medicaid, 2006
Non-Citizen Population, by State, 2011
Status of State Medicaid Expansion Decisions
Share of Women Ages 18 – 64 Who Are Uninsured, by State,
WY WI WV WA VA VT UT TX TN1 SD SC RI PA1 OR OK OH ND NC NY NM NJ NH2
WY WI WV WA VA VT UT TX TN1 SD SC RI PA OR OK OH1 ND NC NY NM NJ NH NV
WY WI WV WA VA* VT UT TX TN SD SC RI PA OR* OK OH ND NC NY NM* NJ NH
WY WI WV WA VA VT UT TX TN SD SC RI PA OR* OK OH ND NC NY NM* NJ NH
Mobility Update and Discussion as of March 25, 2008
Current Status of the Medicaid Expansion Decision, as of May 30, 2013
IAH CONVERSION: ELIGIBLE BENEFICIARIES BY STATE
State Health Insurance Marketplace Types, 2015
HHGM CASE WEIGHTS Early/Late Mix (Weighted Average)
Status of State Medicaid Expansion Decisions
Status of State Medicaid Expansion Decisions
Sampling Distribution of a Sample Mean
S Co-Sponsors by State – May 23, 2014
WY WI WV WA VA VT UT* TX TN SD SC RI PA OR* OK OH ND NC NY NM* NJ NH
Seventeen States Had Higher Uninsured Rates Than the National Average in 2013; Of Those, 11 Have Yet to Expand Eligibility for Medicaid AK NH WA VT ME.
Employer Premiums as Percentage of Median Household Income for Under-65 Population, 2003 and percent of under-65 population live where premiums.
Employer Premiums as Percentage of Median Household Income for Under-65 Population, 2003 and percent of under-65 population live where premiums.
Average annual growth rate
Sampling Distribution of a Sample Mean
Market Share of Two Largest Health Plans, by State, 2006
Percent of Children Ages 0–17 Uninsured by State
How State Policies Limiting Abortion Coverage Changed Over Time
United States: age distribution family households and family size
Status of State Medicaid Expansion Decisions
Employer Premiums as Percentage of Median Household Income for Under-65 Population, 2003 and percent of under-65 population live where premiums.
Percent of Adults Ages 18–64 Uninsured by State
Uninsured Nonelderly Adult Rate Has Increased from Percent to 20
States including quality standards in their SSIP improvement strategies for Part C FFY 2013 ( ) States including quality standards in their SSIP.
Status of State Medicaid Expansion Decisions
WY WI WV WA VA VT UT* TX TN SD SC RI PA OR* OK OH ND NC NY NM* NJ NH
WY WI WV WA VA VT UT* TX TN SD SC RI PA OR* OK OH ND NC NY NM* NJ NH
Current Status of State Individual Marketplace and Medicaid Expansion Decisions, as of September 30, 2013 WY WI WV WA VA VT UT TX TN SD SC RI PA OR OK.
Status of State Medicaid Expansion Decisions
Presentation transcript:

Concept of a Wide Area Defense System for the Power Grid Chen-Ching Liu University College Dublin National University of Ireland, Dublin Seminar at NTUA and IEEE PES Greece, June 2009

Catastrophic Power Outages

Western Electricity Coordinating Council (WECC) system - Aug 10th, 1996 Blackout Initiating events System becomes unstable Blackout 15:48 p.m. Keeler-Allston 500-kV line contacts a tree due to inadequate right-of-way maintenance. Additionally the Pearl-Keeler line is forced out of service due to the Keeler 500/230-Kv transformer being OOS. Mild .224 Hz oscillations were seen throughout the system and began to appear on of the PDCI. The WECC broke into 4 asynchronous islands with heavy loss of load. 7.5 million people lost power. Shunt capacitor banks were switched in to raise the voltage but the oscillations were not being damped. With the loss of these 2 lines, 5 lines are now out of service, removing hundreds of MVAR. 15:48:51 p.m. Oscillations on the POI reached 1000MW and 60-kV peak-to-peak. WA MT ND Lines throughout the system begin to experience overloads as well as low voltage conditions. Additional lines trip due to sagging. OR PDCI Remedial Action Schemes (RAS) began to actuate. Shunt and series capacitors were inserted. ID SD WY NV NE CA UT CO 15:47:40-15:48:57 p.m. Generators at the McNary power house supplying 494 MVAR trip. The system begins to experience “mild oscillations”. AZ NM

Eastern Interconnection – August 14th, 2003 Blackout Initiating events System becomes unstable Blackout 1:07 p.m. FE turns off their state estimator for troubleshooting. 4:05:57 p.m. The loss of 138-kV lines overloads the Sammis-Star line. 265 power plants tripped off line and 50 million people are without power. 1:31 p.m. Eastlake 5 generation unit trips and shuts down. 2:02 p.m. Stuart-Atlanta 345-kV line tips off due to contact with a tree. 4:08:59 p.m. Galion-Ohio and Central-Muskinghun 345-kV lines trip on Zone 3 causing major power swings through New York and Ontario and into Michigan. 2:14 p.m. FE’s control room lost alarm functions followed by a number of the EMS consoles. Low voltage/ high load conditions and system disturbances propagate through the system tripping transmission lines and generators. ND ME MN VT MI NH SD WI NY MA 2:54 p.m. The primary and secondary alarms servers failed. CT RI NE IA PA IL OH NJ IN MD DE KS WV MO VA 3:05:41-3:57:35 p.m. 3 345-kV lines trip due to contact with trees. This overloads the underlying 138-kV system and depressed voltages. 4:13 p.m. most of the North East and parts of Canada blacked out. There are only a few islands which remain operating. KY NC OK TN AR SC MS AL GA LA FL 3:39:17-4:08:59 p.m. 16 138-kV lines trip due to overloading.

Hydro-Québec Blackout- April 18th, 1988

Blackout Propagation (without defense systems) Complete System Collapse Triggering Event

Occurrences and Extent of Blackouts in North America 1000 Number of Blackouts 100 10 100 102 104 106 108 Number of customers affected

Strategic Power Infrastructure Defense (SPID) Design self-healing strategies and adaptive reconfiguration schemes To achieve autonomous, adaptive, and preventive remedial control actions To provide adaptive/intelligent protection To minimize the impact of power system vulnerability

SPID System Fast and on-line power & comm. system assessment Hidden failure monitoring Adaptive: load shedding, generation rejection, islanding, protection

Multi-Agent System for SPID Knowledge/Decision exchange Protection Agents Generation Agents Fault Isolation Agents Frequency Stability Model Update Command Interpretation Planning Agent Restoration Hidden Failure Monitoring Agents Reconfiguration Vulnerability Assessment Power System Controls Inhibition Signal Plans/Decisions Event Identification Triggering Events Event/Alarm Filtering Events/Alarms Inputs Update Model Check Consistency Comm. DELIBERATIVE LAYER COORDINATION LAYER REACTIVE LAYER

Multi-Agent System for SPID Subsumption Architecture (Brooks) for Coordination Agents in the higher layer can block the control actions of agents in lower layers Load Shedding Agent Global View/Goal(s) R Under Frequency Relay Local View/Goal(s) Tripping Signal Inhibition Signal

combined into sequences Cascaded Events Some Basic Patterns Line tripping due to overloading Generator tripping due to over-excitation Line tripping due to loss of synchronism Generator tripping due to abnormal voltage and frequency system condition Under-frequency/voltage load shedding Identifying the basic patterns of cascaded events and explore how these patterns can be combined into sequences

Cascaded Zone 3 Operations Zone 3 Relay Operations Contributed to Causes of Blackouts. Heavy Loaded Line Low Voltage High Current Zone 3 Relay Operation(s) Lower Impedance Seen by Relay Loss of Transmission Lines Other Heavy Loaded Lines Catastrophic Outage

Prediction of Zone 3 Relay Tripping Based on On-Line Steady State Security Assessment Contingency Evaluation Performed On Line Every Several Minutes Contingency Evaluation … Case Relay Status Contingency Description 1 N/A Secure 3 phase fault at bus 1 2 Zone3 Insecure 3 phase fault at bus 2 .. … N 3 phase fault at bus N Case Relay Status Contingency Description 1 N/A Secure 3 phase fault at bus 1 2 Zone3 Insecure 3 phase fault at bus 2 .. … N 3 phase fault at bus N Case Relay Status Contingency Description 1 N/A Secure 3 phase fault at bus 1 2 Zone3 Insecure 3 phase fault at bus 2 .. … N 3 phase fault at bus N Case Relay Status Contingency Description 1 N/A Secure 3 phase fault at bus 1 2 Zone 3 Insecure 3 phase fault at bus 2 .. … N 3 phase fault at bus N Post-Contingency Power Flow FIS Post-Contingency Apparent Impedance Fuzzy Inference System (FIS) Developed Using Off-Line Time-Domain Simulations Corrected Post-Contingency Apparent Impedance

Impedances Obtained by Power Flow and Time Domain Simulation Post-Contingency Impedance Obtained by Power Flow Does Not Coincide with Impedance Obtained by Time-Domain Dynamic Simulations

Automatic Development of Fuzzy Rule Base Wang & Mendel’s algorithm is a “learning” algorithm: 1) One can combine measured information and human linguistic information into a common framework 2) Simple and straightforward one-pass build up procedure 3) There is flexibility in choosing the membership function Pre-determine number of membership functions N Give input and output data sets FIS created automatically (Inp1, Inp2, Out) = (10, 1, -2) (Inp1, Inp2, Out) = (8, 3, -1) (Inp1, Inp2, Out) = (5, 6, -4) (Inp1, Inp2, Out) = (2, 8, -5) … In this example, N is 7

Case A Fault Location Relay Location

Impedance on R-X (Case A) Z obtained by power flow solution is outside Zone 3 circle. Case A

Load Shedding Studies have shown that the August 10th 1996 blackout could have been prevented if just 0.4% of the total system load had been dropped for 30 minutes. According to the Final NERC Report on August 14, 2003, Blackout, at least 1,500 to 2,500 MW of load in Cleveland-Akron area had to be shed, prior to the loss of the 345-kV Sammis-Star line, to prevent the blackout.

Automatic Load Shedding Under Voltage Under Frequency Rate of Frequency Decrease Remedial Action Scheme

Adaptive Self-healing: Load Shedding Agent A control action might fail Unsupervised adaptive learning method should be deployed Reinforcement Learning Autonomous learning method based on interactions with the agent’s environment If an action is followed by a satisfactory state, the tendency to produce the action is strengthened

Load Shedding Options frequency Time (multiples of 0.02 sec)

Adaptive Self-healing: Load Shedding Agent 179 bus system resembling WSCC system ETMSP simulation Remote load shedding scheme based on frequency decline + frequency decline rate Temporal Difference (TD) method is used for adaptation: Need to find the learning factor for convergence

Adaptive Load Shedding Agent State 1 State 2 State 3 Freq := 59.5 Dec.rate > threshold value Freq := 58.8 Freq := 58.6 179 bus system

Adaptive Load Shedding Agent Expected normalized system frequency that makes the system stable Normalized frequency “The load shedding agent is able to find the proper control action in an adaptive manner based on responses from the power system” Number of trials

Flexible Grid Configuration to Enhance Robustness Flexible Grid Configuration can play a significant role in defending against catastrophic events. Power infrastructure must be more intelligent and flexible. To allow coordinated operation and control measures to absorb the shock and minimize the potential damages caused by radical events .

Cascading Events A Cascading Event Refers to a Series of Tripping Initiated by One or Several Component Failures in a Power System Here the initial component(s) failure is designated as “shock” to the power infrastructure

Simulated Cascading Events (179 Bus System) Compute Power Flows after Tripping Six lines are found on limit violation Trip these lines Identify New Network Configuration and Solve Power Flows Again Fifteen lines are found with limit violations Continue This Simulation Procedure Finally system collapses: most transmission lines are tripped and most loads are lost

2-Area Partitioning Algorithm (from VLSI) Spectral 2-way Ratio-Cut Partitioning Theorem Given an edge-weighted graph G = (V, E), the second smallest eigenvalue λ2 of the graph’s Laplacian matrix Q yields a lower bound on the cost c of the optimal ratio cut partition, with c = e(U,W)/(|U|·|W|) ≥ (λ2/n) Cut-Size: e(U,W) ≥ (λ2/n) (|U|·|W|)

Area-Partitioning Algorithm 6-Bus System

Area-Partitioning Algorithm Partition {U, W} Cut Set Size e(U,W) e(U,W) / (|U|·|W|) λ2 / n {(4), (5 6 3 2 1)} 1.1 1.1 / (1  5) = 0.22   {(4 5), (6 3 2 1)} 1.2 1.2 / (2  4) = 0.15 {(4 5 6), (3 2 1)} 0.3 0.3 / (3  3) = 0.0333 0.1966 / 6 = 0.0328 {(4 5 6 3), (2 1)} 2.1 2.1 / (4  2) = 0.2625 {(4 5 6 3 2), (1)} 1.1 / (5  1) = 0.22 Partition Results of 6-Bus System

Flexible Grid Configuration to Absorb the Shock Solve Power Flows of Area One All 35684.71 MW loads are supplied, no line flow constraints violations Solve Power Flows of Area Two Seven lines on limit violation: (Bus158-Bus164), (163-8), (64-163), double lines (16-19), and double lines (150-154)

Flexible Grid Configuration to Absorb the Shock Use “Power Redispatching & Load Shedding” in Area Two Totally, 188 + 64.4 + 60 = 312.4 MW load are shed Bus # Original Load (MW) Load Shed (MW) Load Supplied (MW) 8 239 188 51 16 793.4 64.4 729 154 1066 60 1006

Split System into Two Areas

Flexible Grid Configuration to Absorb the Shock Shed Load vs. System Total Load K=1 K=2 K=3 

Flexible Grid Configuration to Avoid Cascaded Failures Step 1 : Compute power flows after initial tripping event(s). Step 2 : Convert power network to an edge-weighted graph G, weight of each edge is absolute value of real power flow. Step 3: Multilevel graph partitioning with minimum edge-cut. Network is separated into k areas to minimize generation / load imbalance. Graph COARSENED to a smaller number of vertices, Bisection PARTITIONING of much smaller graph, UNCOARSENING back toward original graph. Coarsest graph small, Coarsening can be parallelized, Partitioning efficiency high.

Emergency Control with Multilevel Graph Partitioning Partitioning a 22,000 bus and 32,749 branch system into 2, 3, 4 islands with 0.07s, 0.081s and 0.09s on 2 GHz Pentium CPU and 1GB RAM. Fast computational speed makes it possible to determine partitioning strategy and identify new network configuration in on-line environment. An adaptive relaying architecture for controlled islanding CCUs acquires system data, generates system separation strategy. SCUs receive system separation commands from CCU and send breaker opening commands to specific auxiliary relays.

Flexible Grid Configuration to Avoid Cascaded Failures Controlled islanding on a 200-bus system: 199 buses, 31 generators, 248 branches. Sequence of cascading events: At t=0 s, three transmission lines out-of-service. At t=60 s, line 72-197 tripped due to line fault. At t=120 s, line 78-196 tripped due to line fault. Generator G70 at bus 70 overloaded. At t=240 s, generator G70 tripped by over-excitation protection. At t= 260 second, system collapses. Cut Set Load-Generation (MW) Bus 174-175, 176-177, 178-179, 155-156, 155-167, 188-189(1,2) North: Gen=37862 , Load=37104 South: Gen=24517, Load=23794

Flexible Grid Configuration to Avoid Cascaded Failures Load bus voltages without/with islanding strategy System islanding initiated at 241s. Islanding strategy results in balanced generation / load in both islands. All loads in the system are served. Load shedding scheme not applied. Islanding strategy successfully prevents the collapse of the system.

Conclusion Cascading failures remain a grand challenge New communication, information and computer technologies enable wide area protection and control Connectivity also brings cyber vulnerability “Smart” grid? “Self-healing” grid?

Further Information J. Li, C. C. Liu, “Power System Reconfiguration Based on Multilevel Graph Partitioning,” IEEE PES Power Tech, Bucharest, Romania, 2009. K. Yamashita, J. Li, C. C. Liu, P. Zhang, and M. Hafmann, “Learning to Recognize Vulnerable Patterns Due to Undesirable Zone-3 Relay Operations,” IEEJ Trans. Electrical and Electronic Engineering, May 2009, pp. 322-333. J. Li, K. Yamashita, C. C. Liu, P. Zhang, M. Hoffmann, “Identification of Cascaded Generator Over-Excitation Tripping Events,” PSCC, Glasgow, U.K., 2008. H. Li, G. Rosenwald, J. Jung, and C. C. Liu, “Strategic Power Infrastructure Defense,” Proceedings of the IEEE, May 2005, pp. 918-933. J. Jung, C. C. Liu, S. Tanimoto, and V. Vittal, “Adaptation in Load Shedding under Vulnerable Operating Conditions,” IEEE Trans. Power Systems, Nov. 2002, pp. 1199-1205. H. You, V. Vittal, J. Jung, C. C. Liu, M. Amin, and R. Adapa, “An Intelligent Adaptive Load Shedding Scheme,” Proc. 2002 PSCC, Seville, Spain, June 2002. C. C. Liu, J. Jung, G. Heydt, V. Vittal, and A. Phadke, “Strategic Power Infrastructure Defense (SPID) System: A Conceptual Design,” IEEE Control Systems Magazine, Aug. 2000, pp. 40-52.